US$449.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. JG/T 400-2012: The cleaning service standard for ventilating and air-conditioning systems Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
JG/T 400-2012 | English | 449 |
Add to Cart
|
3 days [Need to translate]
|
The cleaning service standard for ventilating and air-conditioning systems
| Valid |
JG/T 400-2012
|
PDF similar to JG/T 400-2012
Basic data Standard ID | JG/T 400-2012 (JG/T400-2012) | Description (Translated English) | The cleaning service standard for ventilating and air-conditioning systems | Sector / Industry | Building & Construction Industry Standard (Recommended) | Classification of Chinese Standard | P48 | Classification of International Standard | 91.140.30 | Word Count Estimation | 17,148 | Quoted Standard | GB/T 14295-2008; GB 19210 | Regulation (derived from) | Ministry of Housing and Urban Notice No. 1555; industry standard filing Notice 2013 No. 3 (total 159) | Issuing agency(ies) | Ministry of Housing and Urban-Rural Development of the People's Republic of China | Summary | This standard specifies the ventilation and air conditioning ventilation system cleaning services terms and definitions, cleaning service requirements, implementation steps and cleaning services cleaning operations QOS acceptance. This standard applies to |
JG/T 400-2012: The cleaning service standard for ventilating and air-conditioning systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
The cleaning service standard for ventilating and air-conditioning systems
ICS 91.140.30
P48
People's Republic of China building industry standards
Ventilation and air conditioning system cleaning service standards
Posted on.2012-12-24
2013-04-01 implementation
Ministry of Housing and Urban-Rural Development, People's Republic of China released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General Provisions 2
5 cleaning requirements 2
6 cleaning operations to implement step 4
7 cleaning service quality acceptance 5
Appendix A (Informative) Ventilation and air conditioning system cleaning the main tools and equipment 6
Appendix B (informative) ventilation and air conditioning system cleaning service contract 7
Appendix C (Normative) Dust volume detection method 12
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard proposed by the Ministry of Housing and Urban Standard and Design Institute.
This standard by the Ministry of Housing and Urban Construction Environment and Energy Standardization Technical Committee.
This standard was drafted. China Academy of Building Research, China Center for Disease Control and Prevention, Tongji University, Shenzhen Polytechnic, on
Sea air conditioning duct cleaning Association, Yorkshire (Zhejiang) Environmental Protection Technology Co., Ltd., Zhongkai Agricultural Engineering College, China Light Industry Cleaner Production Center,
Beijing Han Zhuo air purification equipment limited liability company, Beijing Xin mark environmental energy-saving Technical Advisory Co., Ltd., Shanghai Bangjie environmental technology limited
Company, Shanghai Tongsheng Central Air Conditioning Co., Ltd., Guangdong Midea Commercial Air Conditioner Co., Ltd., Guangdong Chigo Air Conditioning Co., Ltd., Guangzhou Xintiandi Central
Paul Technology Co., Ltd., Guangzhou Institute of Building Materials Industry Co., Ltd., Zhuji Condor Kangxing Chemical Co., Ltd., Hangzhou Guling Environmental Engineering
Cheng Co., Ltd., China Chamber of Commerce, China Tourism Hotels Association.
The main drafters of this standard. Wang Zhichao, Dai Zizhu, Xu Wenhua, Fu Xiaoping, Zhou Guan Ying, Cao Yang, Wang Hui Yao, Ding Lihang, Yan Runsheng, Jiang Bing,
Lu Jing, Chu Shiwei, Shi Haisheng, Tian Mingli, Li Kui, Liang Jinbo, Yang Zhan, Zhang Huiwen, Lin Bin, Liu Yong, Xu Jingsheng.
Ventilation and air conditioning system cleaning service standards
1 Scope
This standard specifies the ventilation air conditioning system cleaning services terms and definitions, cleaning service requirements, cleaning service implementation steps and cleaning
Industry service quality acceptance.
This standard is applicable to the cleaning of equipment, pipes and components that affect the indoor air quality in the ventilation and air-conditioning system of industrial and civil buildings
service.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
Air filters
GB 19210 air conditioning and ventilation system cleaning specification
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Ventilation and air conditioning system cleaning service cleaningserviceforventilatingandair-conditioningsystems
Cleaning services for ducts, vents, air handling units and other components in ventilation and air conditioning systems used to process and deliver air.
3.2
Contaminated contaminants
Ventilation and air conditioning systems affect the indoor air quality and system operation of the dust, biological pollutants and construction waste.
3.3
Cleaning cleaning
Use safe, effective and reasonable method to remove accumulated air and air conditioning system dirt.
3.4
Dedicated cleaning equipment specializedcleaningequipment
For ventilation and air conditioning system cleaning services equipment and instruments in general.
3.5
Cleaning services professionalcleaningservice
Engaged in ventilation and air conditioning system cleaning professional and technical services.
3.6
Cleaning port operationopening
Ventilation and air conditioning system for cleaning operations reserved or newly opened port.
3.7
Visually clean visibleclean
Direct or indirect visual ventilation and air conditioning system no obvious dirt.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of JG/T 400-2012_English be delivered?Answer: Upon your order, we will start to translate JG/T 400-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of JG/T 400-2012_English with my colleagues?Answer: Yes. The purchased PDF of JG/T 400-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|