HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

HYT115-2008 English PDF

US$289.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
HYT115-2008: Seawater desalination engineering design for distillation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
HY/T 115-2008English289 Add to Cart 3 days [Need to translate] Seawater desalination engineering design for distillation Valid HY/T 115-2008

PDF similar to HYT115-2008


Standard similar to HYT115-2008

CBRC5   CJ/T 217   CJ/T 225   HY/T 0302   HY/T 116   HY/T 106   

Basic data

Standard ID HY/T 115-2008 (HY/T115-2008)
Description (Translated English) Seawater desalination engineering design for distillation
Sector / Industry Marine Industry Standard (Recommended)
Classification of Chinese Standard P41
Classification of International Standard 07.060; 91.140
Word Count Estimation 11,112
Date of Issue 3/31/2008
Date of Implementation 4/1/2008
Issuing agency(ies) State Oceanic Administration
Summary This standard specifies the basic requirements for site selection distillation desalination projects, factory planning, seawater pretreatment, engineering design, product quality of water, brine, cooling water and cleaning fluid emissions. This standard applies to new and expanded approach to engineering design distillation desalination.

HYT115-2008: Seawater desalination engineering design for distillation

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Seawater desalination engineering design for distillation ICS 07.060; 91.140 P41 People's Republic of China Marine Industry Standard HY/T 115-2008 Design specification for distillation seawater desalination project 2008-0331 released Implementation of.2008-04-01 Issued by the State Oceanic Administration

Foreword

Appendix A of this standard is an informative appendix. This standard was drafted by the Tianjin Sea Water Desalination and Comprehensive Utilization Research Institute of the State Oceanic Administration, and the National Oceanic Standard Metrology Center participated in the drafting. This standard is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283). The main drafters of this standard. Ruan Guoling, Lu Qingchun, Zhao Heli, Hao Jun, Feng Houjun, Yao Yong, Xie Feng. HY/T 115-2008

Introduction

In order to implement the "Special Plan for Seawater Utilization" and "Development Plan for Seawater Utilization Standards", to promote the healthy, orderly and fast seawater desalination industry For rapid development, it is necessary to summarize the design experience of distillation seawater desalination equipment and standardize the distillation method on the basis of independent technology demonstration projects. The planning and design of seawater desalination projects ensure the design quality of the project, so that the engineering technology is advanced, the operation is safe and reliable, and the economy is reasonable. The industrialization of French seawater desalination technology provides standard technical support and guarantee. So as to effectively solve the problem of water shortage in coastal areas of our country, specially made Make this specification. HY/T 115-2008 Design specification for distillation seawater desalination project

1 scope

This standard specifies the site selection, plant planning, seawater pretreatment, engineering design, product water quality, concentration Basic requirements for the discharge of brine, cooling water and cleaning fluid. This standard is applicable to the engineering design of new and expanded projects that use distillation for seawater desalination.

2 Normative references

The clauses in the following documents become clauses of this standard after being quoted. For dated reference documents, all subsequent Amendments (not including errata content) or revisions do not apply to this standard. However, all parties that have reached an agreement based on this standard are encouraged to study Is the latest version of these files available? For undated references, the latest version is applicable to this standard. GB 150 steel pressure vessel GB 3097 Sea Water Quality Standard GB/T 3797 electrical control equipment GB 5083 General Principles for Safety and Health Design of Production Equipment GB/T 5750 (all parts) Standard inspection method for drinking water GB/T 69888.1 Preparation of documents for electrical technology Part 1.General requirements GB 12348 Noise standard at the boundary of industrial enterprises GB 12801 General Rules of Safety and Health Requirements for Production Process GB/T 17219 Safety evaluation standard for drinking water distribution equipment and protective materials GB 173778.3 Marine Monitoring Specification Part 3.Sample Collection, Storage and Transportation GB 173778.4 Marine Monitoring Specification Part 4.Seawater Analysis GB/T 19570 Technical Specification for Sewage Drainage Pipeline Engineering GB 50000 Code for Design of Building Foundation GB 5009 Load Code for Building Structures GB 50010 Code for Design of Concrete Structures GB 50011 Code for seismic design of buildings GB 50017 Code for Design of Steel Structure GB 50021 Geotechnical Engineering Survey Specification GB 50034 Lighting Design Standard for Industrial Enterprises GB 50052 Code for Design of Power Supply and Distribution System GB 50054 Low Voltage Power Distribution Design Code GB 50204 Code for Acceptance of Construction Quality of Concrete Structure Engineering GB 50205 Code for Construction Quality Acceptance of Steel Structure Engineering DL/T 5094 Thermal Power Plant Building Design Regulations HG20519.15 Pipe section table and pipe characteristic table HG20546 chemical plant equipment layout design regulations HG/T 20549 Design Regulations for Piping Layout of Chemical Plants

3 Terms and definitions

The following terms and definitions apply to this standard. HY/T 115-2008

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of HYT115-2008_English be delivered?

Answer: Upon your order, we will start to translate HYT115-2008_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of HYT115-2008_English with my colleagues?

Answer: Yes. The purchased PDF of HYT115-2008_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.