|
US$439.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. HYT0352-2023: Technology requirement for submarine topography and geomorphology investigation of single beam echo sounding Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| HY/T 0352-2023 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
Technology requirement for submarine topography and geomorphology investigation of single beam echo sounding
| Valid |
HY/T 0352-2023
|
PDF similar to HYT0352-2023
Basic data | Standard ID | HY/T 0352-2023 (HY/T0352-2023) | | Description (Translated English) | Technology requirement for submarine topography and geomorphology investigation of single beam echo sounding | | Sector / Industry | Marine Industry Standard (Recommended) | | Classification of Chinese Standard | A45 | | Classification of International Standard | 07.060 | | Word Count Estimation | 22,240 | | Date of Issue | 2023-07-11 | | Date of Implementation | 2023-09-01 | | Issuing agency(ies) | Ministry of Natural Resources of the People's Republic of China |
HYT0352-2023: Technology requirement for submarine topography and geomorphology investigation of single beam echo sounding ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 07.060
CCSA45
Marine Industry Standards of the People's Republic of China
Technical requirements for single-beam bathymetry for seabed topography and geomorphology surveys
Published on 2023-07-11
2023-09-01 Implementation
Released by the Ministry of Natural Resources of the People's Republic of China
Table of contents
Preface III
1 Scope 1
2 Normative reference documents 1
3 Terms and Definitions 1
4 General requirements 1
4.1 Survey purpose 1
4.2 Adoption of benchmark 1
4.3 Basic content of investigation 2
4.4 Survey line layout requirements 2
4.5 Survey accuracy requirements 2
4.6 Data graphing requirements 3
5 Measurement requirements 3
5.1 Data collection 3
5.2 Preparation of technical design document 3
5.3 Preparation before test 4
5.4 Water level control and correction 5
5.5 Offshore operations 5
5.6 Inspection and organization of field data 7
6 Data processing and compilation 7
6.1 Data processing 7
6.2 Data into graph 8
7 Report preparation 8
7.1 Investigation Report 8
7.2 Data processing report 8
8 Data check 8
8.1 Inspection basis 8
8.2 Personnel composition 8
8.3 Inspection requirements 9
9 Archiving of survey data and results 9
9.1 Archiving requirements 9
9.2 Archived content 9
Appendix A (informative) Single-beam bathymetry class report for seabed topography and geomorphology survey 10
Appendix B (informative) Single-beam survey results inspection content 14
Reference 17
Foreword
This document complies with the provisions of GB/T 1.1-2020 "Standardization Work Guidelines Part 1.Structure and Drafting Rules of Standardization Documents"
Drafting.
Please note that some content in this document may be subject to patents. The publisher of this document assumes no responsibility for identifying patents.
This document is proposed by the Ministry of Natural Resources of the People's Republic of China.
This document is under the jurisdiction of the National Marine Standardization Technical Committee (SAC/TC283).
This document was drafted by. Second Institute of Oceanography of the Ministry of Natural Resources, Naval Institute of Ocean Surveying and Mapping, Guangzhou Marine Geological Survey, Zhuhai Cloud
Zhou Intelligent Technology Co., Ltd., Zhejiang Engineering Geophysical Survey and Design Institute Co., Ltd.
The main drafters of this document. Wu Ziyin, Wang Mingwei, Li Shoujun, Huang Chenhu, Guan Yongxian, Luo Xiaowen, Zhao Dineng, Shang Jihong, Xiao Bo, Zhou Jieqiong,
Pu Jinjing, Tang Zili, Liang Xiaolin, Wang Feng.
Technical requirements for single-beam bathymetry for seabed topography and geomorphology surveys
1 Scope
This document stipulates the general requirements for single-beam bathymetry, measurement requirements, data processing and compilation, report preparation, information
Inspection of materials, archiving of survey data and results, etc.
This document is applicable to single-beam bathymetry operations in marine surveys.
2 Normative reference documents
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, the dated quotations
For undated referenced documents, only the version corresponding to that date applies to this document; for undated referenced documents, the latest version (including all amendments) applies to
this document.
GB/T 12763.10 Marine survey specifications Part 10.Survey of seabed topography and geomorphology
GB/T 32067 Marine element diagram legends and symbols
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
motion sensormotionsensor
attitude sensor
An electronic device for obtaining real-time movement and attitude data of a research vessel.
4 General requirements
4.1 Purpose of investigation
Implement single-beam bathymetry according to mission requirements, obtain seafloor depth data, and conduct data analysis and correction through correction and correction of survey data.
Process and map, compile bathymetric maps and seabed topographic maps of the survey area.
4.2 Adoption of benchmarks
4.2.1 Coordinate system
When connecting, a conversion relationship with CGCS2000 should be established.
4.2.2 Height reference
The 1985 national elevation datum is adopted. For distant seas and polar regions, mean sea level can be used as the elevation datum.
4.2.3 Depth benchmark
The theoretical lowest tide level is used. When using other depth benchmarks, a conversion relationship should be established with the theoretical lowest tide level.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HYT0352-2023_English be delivered?Answer: Upon your order, we will start to translate HYT0352-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of HYT0352-2023_English with my colleagues?Answer: Yes. The purchased PDF of HYT0352-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|