|
US$1939.00 · In stock Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email. HJ 1121-2020: Technical specification for application and issuance of pollutant permit on industrial furnace Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| HJ 1121-2020 | English | 1939 |
Add to Cart
|
9 days [Need to translate]
|
Technical specification for application and issuance of pollutant permit on industrial furnace
| Valid |
HJ 1121-2020
|
Standard similar to HJ 1121-2020 HJ 1113 HJ 1114 HJ 1112
Basic data | Standard ID | HJ 1121-2020 (HJ1121-2020) | | Description (Translated English) | Technical specification for application and issuance of pollutant permit on industrial furnace | | Sector / Industry | Environmental Protection Industry Standard | | Word Count Estimation | 84,843 | | Date of Issue | 2020-03-27 | | Date of Implementation | 2020-03-27 | | Issuing agency(ies) | Ministry of Ecology and Environment |
HJ 1121-2020: Technical specification for application and issuance of pollutant permit on industrial furnace ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for application and issuance of pollutant permit on industrial furnace
National Environmental Protection Standards of the People's Republic of China
Technical specifications for pollutant discharge permit application and issuance
Industrial furnace
2020-03-27 released
2020-03-27 Implementation
Ministry of Ecology and Environment
release
Table of contents
Foreword...II
1 Scope of application...1
2 Normative references...1
3 Terms and definitions...2
4 Key management pollutant discharge units...3
4.1 Requirements for the declaration of the basic situation of the pollutant discharge unit...3
4.2 Emission outlets and methods for determining permitted emission limits...14
4.3 Feasible technical requirements for pollution prevention...23
4.4 Self-monitoring management requirements...24
4.5 Environmental Management Ledger Record Requirements...27
4.6 Requirements for the preparation of pollution discharge permit execution report...28
4.7 Accounting method of actual emissions...29
4.8 Compliance Judgment Method...31
5 Simplify the management of sewage units...33
5.1 Requirements for the declaration of the basic situation of the pollutant discharge unit...33
5.2 Methods for determining discharge outlets and permitted discharge limits...40
5.3 Feasible technical requirements for pollution prevention and control...45
5.4 Self-monitoring management requirements...47
5.5 Environmental Management Ledger Record Requirements...49
5.6 Requirements for the preparation of pollution discharge permit execution report...50
5.7 Accounting method of actual emissions...50
5.8 Compliance Judgment Method...52
Appendix A (informative appendix) reference table of feasible technologies...54
Appendix B (Informative Appendix) Environmental Management Ledger Records (Key Management Pollutant Discharge Units)...55
Appendix C (informative appendix) Environmental management ledger records (simplified management of pollutant discharge units)...58
Appendix D (informative appendix) form of report on implementation of pollutant discharge permit (key management pollutant discharge units)...59
Appendix E (informative appendix) Form of report on implementation of pollutant discharge permit (simplified management of pollutant discharge units)...75
Foreword
In order to implement the Environmental Protection Law of the People’s Republic of China, the Air Pollution Prevention and Control Law of the People’s Republic of
Pollution Prevention and Control Law, the Soil Pollution Prevention and Control Law of the People’s Republic of China, and other laws and regulations, and the General Office of the State Council on Issuing the Control of Pollutant Discharge
Notice on the Implementation Plan of the Permit System (Guobanfa [2016] No. 81) and the "Administrative Measures for Pollution Discharge Permits (for Trial Implementation)" (Order No.
48), improve the technical support system for pollutant discharge permits, guide and standardize the application and issuance of pollutant discharge permits of industrial furnaces
This standard.
This standard specifies the basic requirements for the application and issuance of pollutant discharge permits for industrial furnaces and kilns, the determination of permitted discharge limits,
Actual emissions accounting, compliance determination methods and environmental management requirements such as self-monitoring, environmental management ledger, and pollution discharge permit execution report,
Put forward the reference requirements of feasible technologies for pollution prevention and control.
Appendix A, Appendix B, Appendix C, Appendix D, and Appendix E of this standard are informative appendices.
This standard is issued for the first time.
This standard is formulated by the Department of Environmental Impact Assessment and Emission Management and the Department of Regulations and Standards of the Ministry of Ecology and Environment.
Drafting organizations of this standard. Environmental Engineering Evaluation Center of Ministry of Ecology and Environment, China Building Materials Research Institute Co., Ltd., Beijing Mining and Metallurgy
Technology Group Co., Ltd., Beijing Guohuan Environmental Technology Co., Ltd., China Automotive Industry Engineering Co., Ltd., Shenyang Aluminum Magnesium Design Research
Academy Co., Ltd.
This standard was approved by the Ministry of Ecology and Environment on March 27, 2020.
This standard will be implemented on March 27, 2020.
This standard is interpreted by the Ministry of Ecology and Environment.
Pollutant discharge permit application and issuance of technical specifications for industrial furnaces
1 Scope of application
This standard specifies the basic requirements for the application and issuance of a pollutant discharge permit for industrial furnaces and kilns.
Limit determination, actual emission calculation, compliance determination method, self-monitoring, environmental management ledger and emission permit execution
Reports and other environmental management requirements put forward reference requirements for feasible technologies for pollution prevention and control.
This standard applies to guide industrial furnaces and kilns pollutant discharge units to fill in and report on the national pollutant discharge permit management information platform and industrial furnaces and kilns.
Relevant application information is applicable to guide the issuing authority to review and determine the corresponding permit requirements for the pollutant discharge permit of industrial furnaces and kilns.
begging. This standard is applicable to the management of permits for the discharge of air pollutants and water pollutants related to industrial furnaces and kilns.
This standard applies to industrial furnaces and kilns that discharge pollutants, and other relevant pollutants can be implemented with reference to this standard. Related industry pollution
After the release of the emission standards, the production and discharge links, the types of pollutants, the basis for determining the permitted limits, and the monitoring requirements shall follow its regulations.
The relevant requirements for the operation and management of solid waste will be fixed in the “Environmental Pollution Prevention Law of the People’s Republic of China”
The waste will be implemented after being included in the discharge permit management.
2 Normative references
This standard quotes the terms in the following documents. For undated references, the latest version applies to this standard.
GB 5085 Identification Standard for Hazardous Waste
GB 8978 Integrated Wastewater Discharge Standard
GB 9078 Emission Standard of Air Pollutants for Industrial Furnaces
GB 16297 Comprehensive Emission Standard of Air Pollutants
GB 18597 Pollution Control Standard for Hazardous Waste Storage
GB 18599 Pollution control standard for general industrial solid waste storage and disposal sites
GB/T 4754 Classification of National Economic Industries
GB/T 16157 Determination of particulate matter in exhaust from stationary sources and sampling method for gaseous pollutants
GB/T 31962 Water quality standards for sewage discharged into urban sewers
HJ/T 55 Technical Guidelines for Monitoring Unorganized Emissions of Air Pollutants
HJ 75 Technical Specification for Continuous Monitoring of Smoke (SO2, NOx, Particulate Matter) Emissions from Stationary Pollution Sources
HJ 76 Technical requirements and detection methods of continuous monitoring system for emission of stationary pollution source flue gas (SO2, NOx, particulate matter)
HJ 91.1 Technical Specification for Wastewater Monitoring
HJ/T 353 Water Pollution Source Online Monitoring System Installation Technical Specification (Trial)
HJ/T 355 Water Pollution Source Online Monitoring System Operation and Assessment Technical Specification (Trial)
HJ/T 356 Technical Specification for Data Validity Judgment of Online Water Pollution Source Monitoring System (Trial)
HJ/T 373 Fixed pollution source monitoring quality assurance and quality control technical specifications (trial implementation)
HJ/T 397 Fixed source exhaust gas monitoring technical specification
HJ 493 Technical Regulations for Storage and Management of Water Quality Samples
HJ 494 Technical Guide for Water Quality Sampling
HJ 495 Technical Regulations for Water Quality Sampling Scheme Design
HJ 521 Wastewater Discharge Law Code (Trial)
HJ 608 Code Rules for Pollutant Discharge Units
HJ 819 General Rules of Technical Guidelines for Self-monitoring of Pollutant Discharge Unit
HJ 942 General Rules of Technical Specifications for Pollution Discharge Permit Application and Issuance
"Technical Requirements for Standardized Remediation of Sewage Outlets (Trial)" (Environmental Supervision [1996] No. 470)
"Administrative Measures for the Operation of Automatic Monitoring Facilities for Pollution Sources" (Huanfa [2008] No. 6)
"Notice on Printing and Distributing the "Comprehensive Treatment Plan for Air Pollution in Industrial Furnaces" (Huan Qiqi [2019] No. 56)
"Administrative Measures for Pollution Discharge Permits (Trial)" (Ministry of Environmental Protection Order No. 48)
"List of Classification Management of Discharge Permits for Fixed Pollution Sources"
3 Terms and definitions
The following terms and definitions apply to this standard.
3.1 Industrial furnace
Refers to the use of heat generated by fuel combustion or electric energy conversion in industrial production to smelt materials or workpieces in it,
Thermal equipment for roasting, melting, heating, etc.
3.2 Industrial furnace emission unit
Refers to the application for a permit in accordance with the general procedures of industrial furnaces and kilns in accordance with the provisions of the "List of Classification Management of Permits for Discharge of Fixed Pollution Sources"
The sewage unit.
3.3 other relevant emission unit
Refers to the "Fixed Pollution Source Pollutant Discharge Permit Classification Management List" within the industry, with industrial furnaces and no relevant pollutant discharge permits
Applicable to permit the application and issuance of the specified pollutant discharge unit.
3.4 key pollutant emission unit
Refers to the pollutant discharge units that are included in the "List of Classified Management of Permits for Discharge of Fixed Pollution Sources".
3.5 Simplified pollutant emission unit
Refers to the pollutant discharge units that are included in the "List of Classification Management of Permits for Discharge of Fixed Pollution Sources" to simplify management.
3.6 fugitive emission
Refers to the irregular discharge of atmospheric pollutants without passing through the exhaust tube, including the escape of open workplaces, and through gaps,
The discharge of vents, open doors and windows and similar openings (holes), etc.
3.7 permitted emission limits
Refers to the maximum discharge concentration (or rate) and discharge volume of pollutants that are allowed to be discharged by industrial furnaces and kilns as specified in the pollution discharge permit.
3.8 special periods
Refers to the environmental quality compliance plan formulated by the local people’s government in accordance with the law and other relevant environmental management regulations.
The pollutant discharge of pollutants has special requirements for the time period, including the response period of heavy pollution weather and the winter prevention period.
3.9 Abnormal situation
Refers to abnormal operating conditions of production facilities or pollution prevention facilities such as starting and stopping the furnace (kiln), equipment maintenance, abnormal operation of process equipment, etc.
Abnormal condition.
4 Key management pollutant discharge units
4.1 Requirements for the declaration of the basic situation of the pollutant discharge unit
4.1.1 General principles
The pollutant discharge unit of industrial furnaces shall fill in the declaration system of the national pollutant discharge permit management information platform in accordance with the requirements of this standard
Corresponding information table. Local ecological and environmental authorities at or above the municipal level with districts may increase the need for pollution discharge in accordance with local regulations.
The content stated in the permit, and fill in the “local ecological
Management content added by the management department" column.
4.1.2 Basic information of pollutant discharge units
The basic information of the pollutant discharge unit of the industrial furnace includes the name of the unit, whether it needs to be corrected, the management category of the discharge permit, and the postal code.
Code, industry category, whether to put into operation and date of operation, the latitude and longitude of the production and operation site, and whether the location is an environmentally sensitive area (such as
Key atmospheric control areas, etc.), the name and code of the industrial park to which it belongs, the document number or record number of the environmental impact assessment approval document,
The identification or filing document number of the local government on the illegal project, the document number of the key pollutant total distribution plan, the total particulate matter
Quantity index (t/a), total sulfur dioxide index (t/a), total nitrogen oxide index (t/a), total amount of other pollutants involved
Quantity indicators, etc. If the industrial furnace sewage disposal unit has other content that needs to be explained, it can also fill in the other information.
Industrial furnaces and kiln pollutants and other related pollutants shall fill in the “Pollution Permit” on the national pollutant discharge permit management information platform.
In case of certifiable management category", select "Key Management" according to the "List of Classification Management of Discharge Permits for Stationary Pollution Sources"; fill in
For "industry category", the main industry should be selected according to GB/T 4754, and the sub-sector should be selected as "industrial furnace".
4.1.3 Main products and production capacity
4.1.3.1 General principles
When reporting “main products and production capacity” for industrial furnaces and kilns, the name of the main production unit and main process should be reported.
Name, main production facility name, production facility number, facility parameters, main product name, production capacity, actual output,
Information about the unit of measurement, design year production time, and other options.
4.1.3.2 Main production units, main processes, production facilities and facility parameters
Please refer to Table 1.
4.1.3.3 Production facility number
The pollutant discharge unit of industrial furnaces should fill in the internal production facility number. If there is no internal production facility number, it shall be based on HJ 608
Number and fill in.
4.1.3.4 Product name
The content of the product name of the industrial furnace sewage disposal unit is shown in Table 1.
4.1.3.5 Production capacity, actual output, measurement unit and design annual production time
The production capacity of industrial furnaces and kilns is the design capacity of the main products, excluding those specified by the state or local government.
In terms of eliminated or banned production capacity, the unit of measurement is 10,000 tons/year or ton/year.
The actual output is the annual output of the main products of industrial furnaces and kilns in the first three natural years (if the operating time is less than three years, according to the actual
Fill in the natural year, no need to fill in if it is less than one year), the unit of measurement is 10,000 tons/year or ton/year.
The production time of the design year is generally determined by the environmental impact assessment document, the local government's identification of the illegal project or the filing document
The number of annual production hours. If there is no review and approval opinions on environmental impact assessment documents, local government’s identification or filing documents for illegal projects,
Report according to the actual annual production time.
4.1.4 Main raw and auxiliary materials and fuel information
4.1.4.1 General principles
The pollutant discharge unit of the industrial furnace should report the main raw and auxiliary materials and fuel types, the designed annual consumption and the unit of measurement, and the actual use.
Dosage; toxic and harmful components in raw and auxiliary materials and their proportions; fuel components, including ash, sulfur, volatile, and calorific value.
4.1.4.2 Raw and auxiliary materials and fuel types
The specific names of raw materials, auxiliary materials and fuels should be reported separately, as shown in Table 2.
4.1.4.3 Design annual usage and unit of measurement
The designed annual usage should be the annual usage of raw and auxiliary materials and fuels that match the production capacity. The unit of measurement is ton/year, standard
Quasi cubic meters/year or ten thousand kilowatt-hours/year.
4.1.4.4 The proportion of toxic and hazardous substances and ingredients in raw and auxiliary materials
The composition and proportion of toxic and hazardous substances or elements such as sulfur, fluorine, and heavy metals in the raw and auxiliary materials should be reported.
Report the actual usage in a calendar year.
4.1.4.5 Fuel ash, sulfur, volatile and calorific value
According to the design value or actual use in the previous natural year, report the ash, sulfur, volatile and calorific value (lower
Thermal energy), as well as the sulfur content and calorific value (low thermal energy) of liquid fuel and gas fuel. Among them, solid fuel and liquid
The fuel is based on the received basis.
4.1.4.6 Actual fuel consumption
Report according to the average fuel consumption of the first three natural years (if the operation time is less than three years, report according to the actual natural year, less than one
The year does not need to be filled in), the unit of measurement is ton/year, standard cubic meter/year or ten thousand kilowatt-hour/year.
4.1.5 Production and discharge links, pollutants and pollution prevention facilities
4.1.5.1 General principles
The pollutant discharge unit of industrial furnaces should fill in the items of air pollutants, the form of discharge (organized, unorganized), pollution prevention
Implementation, whether it is a feasible technology, the number and name of the organized discharge outlet, whether the discharge outlet meets the requirements, and the discharge outlet type;
Types of wastewater, pollutant items, pollution prevention facilities, whether it is feasible technology, discharge destination, discharge rules, discharge port number
No. and name, whether the discharge port setting meets the requirements, and the discharge port type.
4.1.5.2 Exhaust gas
a) Waste gas pollutant items, emission forms and pollution prevention facilities
The main pollutant items of industrial furnaces and kilns are accurate according to the national pollutant emission standards such as GB 9078 and GB 16297
Certain; non-ferrous metal smelting, coal (oil) furnaces and other industrial furnaces other than the main pollutants items do not include sulfur dioxide;
In principle, the main pollutant items of alloy manufacturing furnaces that use electricity as energy do not include nitrogen oxides; there are local emission standards requirements
, Determined in accordance with local emission standards; environmental impact assessment documents and their approval opinions, local government’s determination of violating projects
Or if the filing documents have relevant regulations, follow those regulations.
The key management of industrial furnaces and kilns pollutant discharge units fill in the contents in Table 3.
4.1.5.3 Wastewater
a) Types of wastewater and pollutants
If the industrial furnace and kiln discharge unit implements the industrial water pollutant discharge standard, the main pollutant items shall be based on the industrial pollutant discharge
Standard determination; implementation of GB 8978 and other national water pollutant discharge standards, the main pollutant items are determined in accordance with GB 8978;
Where local water pollutant discharge standards are implemented, the main pollutant items shall be determined in accordance with the local pollutant discharge standards.
The key management of industrial furnaces and kilns pollutant discharge units fill in the contents in Table 4.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of HJ 1121-2020_English be delivered?Answer: Upon your order, we will start to translate HJ 1121-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of HJ 1121-2020_English with my colleagues?Answer: Yes. The purchased PDF of HJ 1121-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|