|
US$859.00 · In stock Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email. GBZ32880.1-2016: Economic evaluation of power quality -- Part 1: Economic evaluation method for the end-users Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/Z 32880.1-2016 | English | 859 |
Add to Cart
|
6 days [Need to translate]
|
Economic evaluation of power quality -- Part 1: Economic evaluation method for the end-users
| Valid |
GB/Z 32880.1-2016
|
PDF similar to GBZ32880.1-2016
Basic data | Standard ID | GB/Z 32880.1-2016 (GB/Z32880.1-2016) | | Description (Translated English) | Economic evaluation of power quality -- Part 1: Economic evaluation method for the end-users | | Sector / Industry | National Standard | | Classification of Chinese Standard | K04 | | Word Count Estimation | 43,438 | | Date of Issue | 2016-12-13 | | Date of Implementation | 2017-07-01 | | Regulation (derived from) | National Standard Notice No.126 of 2016 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China |
GBZ32880.1-2016: Economic evaluation of power quality -- Part 1: Economic evaluation method for the end-users ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Evaluation of power quality economics - Part 1. Economic evaluation of electricity users)
ICS 29.020
K04
People's Republic of China national standardization of technical guidance documents
Power Quality and Economic Evaluation
Part 1. Economic evaluation methods for power users
Part 1.Economicevaluationmethodfortheend-users
2016-12-13 released
2017-07-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 Terms and definitions 1
3 Variable Description 3
4 power user economic power quality assessment principles 6
5 Power Quality and Economic Cost 6
6 Economic Loss Assessment Methods 11
7 Power Quality Control Program Economic Evaluation Methodology 14
8 Assessment Process 15
9 Evaluation indicator 16
Appendix A (Informative) Calculation formula of funds 18
Appendix B (informative) device life model 19
Appendix C (informative) additional energy loss and capacity formula 22
Appendix D (informative) a vehicle manufacturer 0.4kV spot welder system harmonic calculation of additional power loss calculations (only
Limited to distribution transformers) 26
Appendix E (informative) a wafer fab power quality economy assessment case 32
References 39
Foreword
"Power Quality and Economic Evaluation" is divided into three parts.
--- Part 1. Economic assessment of power users (GB /Z 32880.1);
--- Part 2. Economic evaluation of public distribution networks (GB /Z 32880.2);
--- Part 3. Methods of data collection (GB/T 32880.3).
This section is the first part of "Power Quality and Economic Evaluation".
This section drafted in accordance with GB/T 1.1-2009 given rules.
Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents.
This part is proposed and managed by the National Standardization Technical Committee of Voltage and Current Ratings and Frequency (SAC/TC1).
This part of the drafting unit. North China Electric Power University, South China University of Technology, China Machine Productivity Promotion Center, Anhui University, TSMC (China) there
Limited, State Grid Jiangsu Electric Power Company Electric Power Research Institute, State Grid Shanxi Electric Power Company Electric Power Research Institute, the International Copper Association, the country
Online Power Company Electric Power Research Institute, China Energy Construction Group Guangdong Electric Power Design and Research Institute, State Grid Henan Electric Power Company
Power Science Research Institute, State Grid Beijing Electric Power Company Electric Power Research Institute, Xi'an Boyu Electric Co., Ltd., Southwest Jiaotong University, NARI (Wu
Han) Electrical Equipment and Engineering Energy Efficiency Assessment Center.
The main drafters of this section. Tao Shun, Zhong Qing, Xiao Xiangning, Zhang Ping, Zhu Mingxing, Lu Chong Hui, Zhai Jing, Yuan Xiaodong, Wang Jinhao, Qian Ye Niu, Zhou Jian,
Chen Zhigang, Li Qionglin, Huang Wei, Liu Juncheng, Xu Guochang, Xie Shaofeng, Wang Yue Jiao, Peng Xudong.
Power Quality and Economic Evaluation
Part 1. Economic evaluation methods for power users
1 Scope
This section standardizes the power users of the power quality and economic evaluation principles, economic costs, economic loss assessment methods, governance programs
Economic assessment methods, assessment processes and assessment indicators.
This section of the assessment of economic losses is limited to direct economic losses caused by power quality problems and power quality problems caused by the number of products less
Indirect economic loss caused by less or forming defective products.
This section applies to electricity users power quality and economic evaluation.
2 Terms and definitions
The following terms and definitions apply to this document.
2.1
Power quality powerquality; qualityofpowersystem
Electrical characteristics of the power system at the designated point, relates to the power supply equipment for normal operation (or operation) of the voltage and current indicators of deviation from the base
The degree of quasi-technical parameters.
Note. The reference specifications generally refer to the value of the indicator under ideal power conditions. These parameters may relate to the compatibility between supply and load.
[GB/T 32507-2016, Definition 2.1.1]
2.2
Voltage dips voltagedip (sag)
The root mean square value of power frequency voltage suddenly drops to 0.1pu ~ 0.9pu in power system, and after 10ms ~ 1min
Return to normal phenomenon.
Note. The IEC standard is reduced to the range of 0.01pu ~ 0.9pu.
[GB/T 30137-2013, Definition 3.1]
2.3
Shortinterruption of short interruptions
The root mean square value of power frequency voltage at a certain point in the power system suddenly drops below 0.1pu and resumes after a brief period of 10ms ~ 1min
normal phenomenon.
[GB/T 30137-2013, Definition 3.2]
2.4
Harmonic (component) harmonic
The non-sinusoidal periodic Fourier series decomposition, the frequency of the fundamental frequency is an integer multiple of the sine component.
[GB/T 32507-2016, Definition 2.6.7]
2.5
Interharmonic (component)
The periodic exchange of Fourier series decomposition, the frequency is not equal to an integral multiple of the fundamental frequency component.
[GB/T 24337-1993, Definition 3.6]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GBZ32880.1-2016_English be delivered?Answer: Upon your order, we will start to translate GBZ32880.1-2016_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GBZ32880.1-2016_English with my colleagues?Answer: Yes. The purchased PDF of GBZ32880.1-2016_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|