HOME   Cart(1)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GBZ31478-2015 English PDF

US$394.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ31478-2015: Process management for avionics -- Preparation of an electronic components management plan
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/Z 31478-2015English394 Add to Cart 3 days [Need to translate] Process management for avionics -- Preparation of an electronic components management plan Valid GB/Z 31478-2015

PDF similar to GBZ31478-2015


Standard similar to GBZ31478-2015

GB/T 38905   GB/T 38239   GB/T 36249   GB/T 45446   GB/Z 31477   

Basic data

Standard ID GB/Z 31478-2015 (GB/Z31478-2015)
Description (Translated English) Process management for avionics -- Preparation of an electronic components management plan
Sector / Industry National Standard
Classification of Chinese Standard V04
Classification of International Standard 49.020
Word Count Estimation 20,230
Date of Issue 2015-05-15
Date of Implementation 2016-01-01
Quoted Standard IEC 61340-5-1-2007; IEC 61340-5-2-2007; IEC 61967-1-2002; IEC 62402-2007; IEC/TR 62240; IEC/TS 62396-1; IEC/TS 62396-2; IEC/TS 62396-3; IEC/TS 62396-4; IEC/TS 62396-5
Adopted Standard IEC/TS 62239-2008, IDT
Regulation (derived from) National Standard Announcement 2015 No. 15
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
Summary This Standard specifies the establishment Avionics Component Management Plan (ECMP) requirements, ECMP users and regulatory agencies should ensure that all electronic component selection and use of the program responsible for the use of controlled devices and equipment to meet the end-use requirements, while the completion of Chapter 4 of the specific technical requirements. This Standard applies to avionics manufacturers.

GBZ31478-2015: Process management for avionics -- Preparation of an electronic components management plan


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Process management for avionics.Preparation of an electronic components management plan ICS 49.020 V04 People's Republic of China national standardization of technical guidance documents Avionics Process Management Electronic components management plan (IEC /T S62239.2008, IDT) 2015-05-15 released 2016-01-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms, definitions and abbreviations 1 4 technical requirements 4 5 Plan Implementation Requirements 13 References 14

Foreword

This instructional document has been drafted in accordance with the rules given in GB/T 1.1-2009. This guidance document uses the translation method identical with IEC /T S62239.2008 "Avionics Process Management Avionics Piece management plan formulation. " This guidance document is proposed and managed by the National Avionics Process Management Standardization Technical Committee (SAC/TC427). The drafting of the guidance of technical documents. China Aviation Institute of Integrated Technology, Xi'an Aircraft Industry Institute of Aviation Computing Technology. The main drafters of this technical guidance document. Lu Xiaoqing, Meng Yuci, Liang Yuan.

Introduction

Electronic equipment is often used in harsh environments, and the aerospace industry requires more stringent requirements on components. Therefore, the avionics industry needs Manage electronic components to ensure the quality and reliability of the electronic components used by the aerospace industry. IEC /T S62239 is designed to help aerospace equipment manufacturers, distributors, maintenance equipment and other avionics users develop their Your own Electronic Component Management Plan (ECMPs) that performs its process does not require special tasks, does not require additional data collection, and does not require To publish the report. In order to meet the needs of the development of China's avionics process management standards for the provision of effective avionics users The highest rate of avionics process management process, it is necessary to develop appropriate national conditions of China's electronic components management plan. Avionics Process Management Electronic components management plan

1 Scope

This Guidance Document specifies the requirements for the preparation of an avionics management plan (ECMP), which ECMP shall provide to users and management The agency assures that the selection and use of all electronic components used in the equipment responsible for the program are controllable and meet the end-use requirements of the equipment Seek and complete the specific technical requirements in Chapter 4. This guidance applies to avionics manufacturers.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. IEC 61340-5-1-2007 Electrostatics - Part 5-1. Electrostatic protection of electronic (equipment) components electronicdevicesfromelectrostaticphenomena-Generalrequirements) IEC 61340-5-2-2007 Electrostatics - Part 5-2. Electronic (equipment) components Electrostatic protection User's guide (Protectionof electronicdevicesfromelectrostaticphenomena-Userguide) IEC 61967-1.2002 integrated circuit electromagnetic radiation measurement (Integratedcircuits-Measurementofelectromag- neticemissions) IEC 62402..2007 Obsolescence management-Application guide IEC /T R62240 avionics process management requirements for use of semiconductor devices outside rated temperature range (Process managementforavionics-Useof semiconductordevicesoutsidemanufacturers'specifiedtemperature range IEC /T S62396 (all parts) Avionics Process Management Atmospheric Radiation Effects (Processmanagementfor avionics-Atmospheric radiation effects) 3 Terms, definitions and abbreviations 3.1 Terms and definitions The following terms and definitions apply to this document. Note Planners may use terms in their plans that are consistent with their organization's internal agreements. 3.1.1 Avionics environment avionicsequipmentenvironment In the equipment production cycle and maintenance life (maintenance life length by the equipment manufacturers and users to negotiate the decision), the equipment performance is not loss Or degraded conditions, the equipment must withstand the environmental conditions (see equipment manual). 3.1.2 Inherent ability Components under normal conditions can be used under normal conditions.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ31478-2015_English be delivered?

Answer: Upon your order, we will start to translate GBZ31478-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ31478-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ31478-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.