HOME   Cart(3)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (25 Oct 2025)

GBZ21193.1-2007 English PDF

US$874.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GBZ21193.1-2007: Fossil-fired steam power stations -- Part 1: Limiting controls
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/Z 21193.1-2007English874 Add to Cart 5 days [Need to translate] Fossil-fired steam power stations -- Part 1: Limiting controls Valid GB/Z 21193.1-2007

PDF similar to GBZ21193.1-2007


Standard similar to GBZ21193.1-2007

GB/T 41251   GB/T 32828   DL/T 680   GB/T 42567.4   GB/T 45283.1   GB/T 45283.2   

Basic data

Standard ID GB/Z 21193.1-2007 (GB/Z21193.1-2007)
Description (Translated English) Fossil-fired steam power stations -- Part 1: Limiting controls
Sector / Industry National Standard
Classification of Chinese Standard N18
Classification of International Standard 25.040.40; 27.100
Word Count Estimation 44,432
Date of Issue 2007-11-14
Date of Implementation 2008-05-01
Adopted Standard IEC/TR 62140-1-2002, IDT
Regulation (derived from) China National Standard Approval Announcement2007 No.12 (Total No.112)
Issuing agency(ies) Ministry of Health of the People's Republic of China
Summary This standard specifies the limited fossil fired steam power plant radiation control. From the limited mandate and role of radiation control point of view, they are located between the actual operational control and protection equipment. Operation control output task is always generated corresponding to the value set in advance to control the power generation mode. And various subsystems running in this purpose in accordance with the requirements of economic and environmental. The main task is to protect the device by stopping ways to protect personnel, environment and the equipment and its components are not damaged. Limit radiation control is used to support operational control, therefore, possible restrictions which can run continuously during the transition, for example, during startup and shutdown, as well as abnormal operating situations. Limit radiation control is often used to control the operation of the actuator, as they can be removed as operational control. Yet. When the limit is removed when the radiation control, protective equipment before being triggered, automatically pre- process value to the limitation no longer exists, therefore, limiting the different control and protection equipment, protective equipment can not be cut off, and it's mostly through its dedicated implementing agencies to play a role. The technical guidance document has nothing to do with the operation of the control and protection equipment. Control task subsystem can run with different devices and change the whole situation. To accommodate a variety of control tasks, texture mapping is performed. The following structure is optional equipment available: -between the operation control and limiting control, -in limiter control, -in the run control.

GBZ21193.1-2007: Fossil-fired steam power stations -- Part 1: Limiting controls

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
GB /Z 21193.1-2007 Fossil-fired steam power stations.Part 1. Limiting controls ICS 25.040.40; 27.100 N18 National Standardization Technical Document of the People's Republic of China GB /Z21193.1-2007/IEC /TR62140-1.2002 Mineral burning steam power station Part 1. Limiting control (IEC /T R62140-1.2002, IDT) Released on.2007-11-14 General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China China National Standardization Administration issued

Content

Foreword III Introduction IV 1 Scope 1 2 symbols, subscripts, abbreviations 1 2.1 Symbol 1 2.2 Subscript 2 2.3 Abbreviations (also used as subscripts) 2 3 limit control function 2 3.1 The value of the clip 3 3.2 Limiting Functional Module 3 4 Limit Control List 4 Appendix A (informative) Boiler steam pressure upper limit 8 A. 1 Task 8 A. 2 Control Structure Description 8 A. 3 operating characteristics 10 A. 4 Additional information 10 Appendix B (informative) Boiler steam pressure lower limit 11 B. 1 Task 11 B. 2 Control Structure Description 11 B. 3 operating characteristics 12 B. 4 Additional Information 13 Appendix C (informative) Thermal stress limiting control in pressure-bearing components 14 C. 1 Task 14 C. 2 Control Structure Description 14 C. 3 operating characteristics 15 Appendix D (informative) Lower limit of evaporator flow in a DC boiler 17 D. 1 Task 17 D. 2 Control Structure Description 17 D. 3 operating characteristics 21 Appendix E (informative) Limiting control of the water supply functional group 24 E. 1 Task 24 E. 2 Control Structure Description 26 E. 3 operating characteristics 26 E. 4 More complex control structures 29 Appendix F (informative) The lower limit of the heat output of the furnace, taking the direct combustion of the pulverized coal furnace as an example 31 F. 1 Task 31 F. 2 Control Structure Description 32 F. 3 operating characteristics 32 GB /Z21193.1-2007/IEC /TR62140-1.2002 Appendix G (informative) Allowable turbine thermal stress 36 G. 1 Task 36 G. 2 Control System Description 37 G. 3 Operating characteristics 37 G. 4 Additional information 38 Figure 1 Changes in the whole process of the controlled variable 3 Figure A. 1 The upper limit steam pressure limiting control device control loop using bypass equipment is shown in Figure 8. Figure A. 2 Pressure characteristic values of conventional power station units (indicated by the modified smoothing pressure) 9 Figure A. 3 Main control function scheme of conventional power station steam bypass equipment 9 Figure B. 1 Lower limit steam pressure limiting control device control circuit Figure 11 Figure B. 2 Pressure characteristic value of conventional power station unit (indicated by modified smooth pressure) 12 Figure B. 3 Main control function scheme of main steam pressure minimum pressure control in conventional power station 12 Figure C. 1 data recording, calculation, display; text of limit control 14 Figure C. 2 steam temperature setting value given 15 Figure D. 1 Start the low-power running start system 17 Figure D. 2 Feed water control with circulating pump in main flow 18 Figure D. 3 Feed water control with circulation pump in bypass flow 19 Figure D. 4 Feed water control by circulating feed pump 20 Figure D. 5 Limitation of evaporator flow during load rise 21 Figure D. 6 Limitation of evaporator flow during shutdown 22 Figure E. 1 Water supply function group equipment full view 25 Figure E. 2 Feed pump features with limit curve 26 Figure E. 3 Water supply control simplified function scheme with limiting and structural transformation 28 Figure E. 4 Conventional scheme for water supply control with speed control electric pump and low output control valve 29 Figure F. 1 Pulverizing unit equipment connection diagram 31 Figure F. 2 Conventional scheme for minimum furnace heat output limiting control 33 Figure F. 3 Example of starting the powder unit with oil supply. The minimum oil output of the oil ignition output (to ignite the coal). Using other combustion Group to meet the furnace heat output of the boiler 34 Figure F. 4 Example of a shutdown of the milling unit. Use other burner sets to meet the furnace heat output of the boiler 34 Figure G. 1 Formation of stress tolerances 36 Table 1 Limit Control List 4 Table D. 1 20 Table E. 1 Assignment of controlled variables, reference variables and operational variables 26 Table E. 2 Assignment of controlled variables, reference variables and manipulated variables 30 GB /Z21193.1-2007/IEC /TR62140-1.2002

Foreword

GB /Z21193 "Mineral Combustion Steam Power Station" is divided into the following sections. --- Part 1. Limiting control; --- Part 2. Drum water level control; --- Part 3. Steam temperature control. This part is the first part of GB /Z21193. This part is equivalent to IEC /T R62140-1.2002 "Mineral Combustion Steam Power Station Part 1. Limiting Control" (English version). For ease of use, the following compile changes have been made to IEC /T R62140-1.2002. a) the words “technical report” were replaced by the words “guidance technical documents”; b) delete the preface to IEC /T R62140-1.2002; c) delete the introduction to IEC /T R62140-1.2002; d) the term “limiter control” in this part is equivalent to “limit control” in the standard GB/T 2900.56-2002; e) According to the regular publications and standards of the power industry, the abbreviation “Boiler SG” in this section is changed to “Boiler B”. Appendix A, Appendix B, Appendix C, Appendix D, Appendix E, Appendix F and Appendix G of this part are informative annexes. This part was proposed by the China Machinery Industry Federation. This part is under the jurisdiction of the Second Technical Committee of the National Industrial Process Measurement and Control Standardization Technical Committee. This section is responsible for drafting the unit. Southwest University. Participated in the drafting of this section. Mechanical Industry Instrumentation and Instrumentation Institute of Integrated Technology and Economics, China Silian Instrument and Meter Group, Xi'an Thermal Power Research Institute Co., Ltd., Beijing Machinery Industry Automation Research Institute, Shanghai Industrial Automation Instrumentation Institute. The main drafters of this section. Zhao Yixin, Liu Feng, Pan Dongbo. Participated in the drafting of this section. Feng Xiaosheng, Liu Jin, Zhou Ming, Xie Bingbing, Chen Shien. This section is the first release. GB /Z21193.1-2007/IEC /TR62140-1.2002

Introduction

This part is part of GB /Z21193, which contains the correct design and operation of the control circuit for the mineral burning power station. Suggestions. They are based on the current technical solutions, and in order to understand them correctly, this section also presents the necessary backs. Scene information. This section proposes or contains special technical solutions, mainly to meet the needs of similar user needs, forming a recognized Method to represent the functional needs of operators and suppliers of mineral burning power plants. In the given time, this section is strictly regarded as a specific technical solution example, the purpose of which is to encourage the topic. The idea is unified and the discussion is promoted. There are two types of instructional technical documents in GB /Z21193. The first type of guidance technical document relates to special control loops for boilers, such as drum water level control or steam temperature control, and The normal operating conditions in which they are located. The second type of guidance technical document points out special ways to ensure proper operation under restricted conditions, such as rising and falling During the period, or in abnormal operating conditions, or they are related to the furnace control system, such as load control system or frequency control system. These ones Guidance technical documents usually group power plant units into one. Each part of GB /Z21193 is independent of each other, however, their content is largely coordinated. This department Columns can be added. GB /Z21193.1-2007/IEC /TR62140-1.2002 Mineral burning steam power station Part 1. Limiting control

1 Scope

This section covers the limiting control of mineral-fired steam power stations. From the perspective of the task and role of the limit control, they are located between the actual operational control and the protection device. The task of running control is The resulting output always controls the power generation process in a manner corresponding to the preset values, and for this purpose each subsystem is economically and cyclically The requirements of the environment are running. The task of protecting equipment is primarily to protect people, the environment, and the equipment and its components from damage by means of downtime. The limiter control is used to support the run control, so it can run continuously under the constraints that may be imposed during the transition, for example, at boot And during downtime, as well as in abnormal operating conditions. Limiting control often uses actuators with operational controls that can be cut off like operational controls. However, when the limit control is When cutting off, the pre-automatic clipping of the process value no longer exists before the protection device is triggered. Therefore, the limiting control is different from the protection device. The protective device cannot be cut off, and most of it works through its dedicated actuator. This guidance technical document and operational control The system is independent of the protection device. Subsystem control tasks can vary with the overall device operating conditions. In order to adapt to various control tasks, the structural transformation is carried out. The following are optional structures available for the device. --- between the operation control and the limit control; --- Within the limit control; --- In the operation control. Therefore, for process tasks, structural transformation is not an isolated control solution, they are involved in this section along with clipping control. (See Appendix A to Appendix G). 2 symbols, subscripts, abbreviations The following symbols, subscripts and abbreviations apply to this section. 2.1 symbol Speed Power P; Heat Q; Heat flux Q; Temperature ; Temperature difference Δ; Material stress σ; GB /Z21193.1-2007/IEC /TR62140-1.2002

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GBZ21193.1-2007_English be delivered?

Answer: Upon your order, we will start to translate GBZ21193.1-2007_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GBZ21193.1-2007_English with my colleagues?

Answer: Yes. The purchased PDF of GBZ21193.1-2007_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.