US$189.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 6300-2007: Regulations for submission of the ship finished documents Status: Valid GB/T 6300: Evolution and historical versions
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 6300-2007 | English | 189 |
Add to Cart
|
3 days [Need to translate]
|
Regulations for submission of the ship finished documents
| Valid |
GB/T 6300-2007
|
GB/T 6300-1986 | English | 239 |
Add to Cart
|
2 days [Need to translate]
|
Regulations for submission of the shipfinished documents
| Obsolete |
GB/T 6300-1986
|
PDF similar to GB/T 6300-2007
Basic data Standard ID | GB/T 6300-2007 (GB/T6300-2007) | Description (Translated English) | Regulations for submission of the ship finished documents | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | U01 | Classification of International Standard | 47.020.01 | Word Count Estimation | 7,778 | Date of Issue | 2007-07-17 | Date of Implementation | 2008-01-01 | Older Standard (superseded by this standard) | GB/T 6300-1986 | Regulation (derived from) | China National Standard Announcement 2007 No.7 (Total No.107) - National-Standard-Commission | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the completion of the ship the product, shall be submitted to the owner of the shipyard ship finished documents (hereinafter referred to as the completion of the file) of the project and requirements. This standard applies to diesel-powered device civilian ships, other vessels can refer to use. |
GB/T 6300-2007: Regulations for submission of the ship finished documents---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Regulations for submission of the ship's finished documents
ICS 47.020.01
U01
National Standards of People's Republic of China
Replacing GB/T 6300-1986
Submit the ship is the product finished documents
Posted 2007-07-17
2008-01-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard replaces GB/T 6300-1986 "ship shall submit the product finished documents."
This standard compared with GB/T 6300-1986, mainly following technical changes.
--- Modify the partially completed project file name;
--- Complements the partially completed project files;
--- The project to the overall classification, hull, machinery, electrical, outfitting, ship equipment, painting, interior outfitting, ventilation air conditioning refrigeration equipment manufacturing
10 categories plant to provide random files.
The standard proposed by China State Shipbuilding Corporation.
This standard by the National Standardization Technical Committee Marine Boats (SAC/TC12) centralized.
This standard was drafted. Hudong-Zhonghua Shipbuilding (Group) Co., Ltd.
The main drafters of this standard. cases Xiaochun, Zhang Wei, Gun, Geng Haiping, Sun Weifang, Jiang Wei, Hu Hing Temple.
This standard replaces the standards previously issued as follows.
--- GB/T 6300-1986.
Submit the ship is the product finished documents
1 Scope
This standard specifies the ship completed products, should be submitted to the owner of the shipyard ship products finished documents (hereinafter referred to as the completion of file) entries
Head and requirements.
This standard applies to diesel-powered means of civilian ships, other vessels can refer to use.
2 completion project file
2.1 General
2.1.1 General arrangement
2.1.2 loading manual
2.1.3 grain loading manual
2.1.4 damage stability calculations
2.1.5 tilt test and load measurement report
2.1.6 Navigation test report
Figure 2.1.7 tank capacity
2.1.8 Tank measured deeply
Figure 2.1.9 Propeller
2.1.10 damage control plan
2.1.11 handling characteristics Figure
2.1.12 eye diagram
2.1.13 Ballast water management plan
2.1.14 Container stack Boxplots
2.1.15 refrigerated container layout
2.1.16 freeboard mark and calculations
Figure 2.1.17 danger zones
2.2 Hull
2.2.1 The basic structure of FIG.
2.2.2 midship sectional view
2.2.3 rudder horn, bow and stern shaft holder Figure
Figure 2.2.4 shell expansion
2.2.5 cargo Chart
2.2.6 coaming Chart
2.2.7 nacelle structure diagram (including casings, pump room, fan room, etc.)
Figure 2.2.8 bow structure (including anti-surfers, side walls, etc.)
2.2.9 Stern Chart
2.2.10 superstructure Chart
2.2.11 deckhouse Chart
2.2.12 chimney Chart
Figure 2.2.13 drydocking
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 6300-2007_English be delivered?Answer: Upon your order, we will start to translate GB/T 6300-2007_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 6300-2007_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 6300-2007_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay. Question 5: Should I purchase the latest version GB/T 6300-2007?Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 6300-2007 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.
|