US$379.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 45658-2025: Railway applications - Traction power supply system AC 25 kV co-phase power supply device Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 45658-2025 | English | 379 |
Add to Cart
|
4 days [Need to translate]
|
Railway applications - Traction power supply system AC 25 kV co-phase power supply device
| Valid |
GB/T 45658-2025
|
PDF similar to GB/T 45658-2025
Standard similar to GB/T 45658-2025 TB/T 3111 GB/T 36287.1 GB/T 45659
Basic data | Standard ID | GB/T 45658-2025 (GB/T45658-2025) | | Description (Translated English) | Railway applications - Traction power supply system AC 25 kV co-phase power supply device | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | S81 | | Classification of International Standard | 29.280 | | Word Count Estimation | 18,136 | | Date of Issue | 2025-05-30 | | Date of Implementation | 2025-12-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 45658-2025: Railway applications - Traction power supply system AC 25 kV co-phase power supply device ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 29.280
CCSS81
National Standard of the People's Republic of China
Rail transit traction power supply system AC 25kV
Same phase power supply device
Released on 2025-05-30
2025-12-01 Implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Conditions of use 2
4.1 Environmental conditions 2
4.2 Operating voltage and frequency 2
5 General Requirements 2
6 Technical Requirements 2
6.1 Functional Requirements 2
6.2 Performance requirements 4
7 Test methods 5
7.1 General requirements 5
7.2 Negative sequence control function test 5
7.3 Reactive power compensation function test 6
7.4 Harmonic suppression function test 6
7.5 Safety interlock function test 6
7.6 Current control function test 7
7.7 Communication function test 7
7.8 Protection function test 7
7.9 Local/remote control function test 7
7.10 Manual/automatic compensation function test 7
7.11 Run monitoring function test 7
7.12 Power quality monitoring function test 7
7.13 Cooling function test 8
7.14 Clearance and creepage distance inspection 8
7.15 Dielectric strength test 8
7.16 Power control accuracy test 8
7.17 Dynamic performance test 8
7.18 Current harmonic total distortion test 8
7.19 Efficiency Test 8
7.20 Continuous operation test 9
7.21 Temperature rise test 9
7.22 Noise Test 9
7.23 Environmental testing 9
7.24 Electromagnetic compatibility test 9
8 Inspection Rules 10
8.1 Inspection categories 10
8.2 Factory Inspection 10
8.3 Type inspection 10
8.4 Overall inspection 10
8.5 Inspection items 10
9 Sign 11
9.1 Signage11
9.2 Nameplate 12
9.3 Identification 12
10 Packaging, transportation and storage 12
10.1 Packaging 12
10.2 Transportation12
10.3 Storage 12
Foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents"
Drafting.
Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents.
This document is proposed by the National Railway Administration.
This document is under the jurisdiction of the National Rail Transit Electrical Equipment and System Standardization Technical Committee (SAC/TC278).
This document was drafted by. Guangzhou Metro Group Co., Ltd., Southwest Jiaotong University, Guangzhou Metro Design and Research Institute Co., Ltd., Chengdu
Shanghua Electric Co., Ltd., Zhuzhou CRRC Times Electric Co., Ltd., China Railway Electrification Survey and Design Institute Co., Ltd., China Railway Fourth
China Railway Survey and Design Institute Group Co., Ltd., China Railway Electrification Bureau Group Co., Ltd., and China Railway First Survey and Design Institute Group Co., Ltd.
The main drafters of this document are. Zou Dong, Jin Shoujie, He Zhixin, Li Kunpeng, Li Qunzhan, Li Shuqian, Qiu Lebing, Chen Min, Wang Zicheng, Zhang Dongdong,
Huang Wenxun.
Rail transit traction power supply system AC 25kV
Same phase power supply device
1 Scope
This document specifies the use conditions, general requirements, technical requirements,
Test methods, inspection rules, marking, as well as packaging, transportation and storage.
This document is applicable to the same-phase power supply device used in the traction substation in the AC25kV traction power supply system of urban rail transit.
2 Normative references
The contents of the following documents constitute essential clauses of this document through normative references in this document.
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document.
GB/T 1094.4-2005 Power transformers Part 4.Lightning impulse and switching impulse tests for power transformers and reactors
Guidelines
GB/T 2423.1-2008 Environmental testing for electric and electronic products Part 2.Test methods Test A. Low temperature
GB/T 2423.2-2008 Environmental testing for electric and electronic products Part 2.Test methods Test B. High temperature
GB/T 2423.3-2016 Environmental testing Part 2.Test method Test Cab. Steady state damp heat test
GB/T 3768-2017 Acoustics Sound Pressure Method for Determination of Sound Power Level and Sound Energy Level of Noise Source Using Envelope Measurement Surface Above Reflecting Surface
Simple method
GB/T 3859.1-2013 General requirements for semiconductor converters and grid-commutated converters Part 1-1.Basic requirements specification
GB/T 13384 General technical requirements for packaging of electromechanical products
GB/T 13422-2013 Electrical test methods for semiconductor converters
GB/T 15543 Power quality three-phase voltage unbalance
GB/T 16927.1 High voltage test technology Part 1.General definitions and test requirements
GB/T 20626.1-2017 Special environmental conditions for plateau electrical and electronic products Part 1.General technical requirements
GB/T 20645-2021 Technical requirements for low-voltage electrical appliances for plateau use under special environmental conditions
GB/T 24338.6-2018 Rail transit electromagnetic compatibility Part 5.Emission and immunity of ground power supply devices and systems
GB/T 25387.2-2021 Full power converter for wind turbines Part 2.Test methods
GB/T 32350.1-2015 Insulation coordination for rail transit - Part 1.Basic requirements for electrical clearances and insulation of electrical and electronic equipment
Creepage distance
GB/T 32593-2016 Power electronic converters for substations of rail transit ground installations
GB 50150 Electrical equipment acceptance test standard for electrical installation engineering
TB/T 2805-2021 Insulation level of traction power supply equipment
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
co-phase power supply
Adjacent traction network power supply arms are powered by the same phase voltage.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 45658-2025_English be delivered?Answer: Upon your order, we will start to translate GB/T 45658-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 45658-2025_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 45658-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|