HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 44639.2-2024 English PDF

US$1559.00 · In stock
Delivery: <= 9 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 44639.2-2024: Railway applications - Energy measurement system on board trains - Part 2: Energy measurement
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 44639.2-2024English1559 Add to Cart 9 days [Need to translate] Railway applications - Energy measurement system on board trains - Part 2: Energy measurement Valid GB/T 44639.2-2024

PDF similar to GB/T 44639.2-2024


Standard similar to GB/T 44639.2-2024

GB/T 6770   GB/T 36287   TB/T 3541.3   GB/T 44639.4   GB/T 44639.5   GB/T 44639.3   

Basic data

Standard ID GB/T 44639.2-2024 (GB/T44639.2-2024)
Description (Translated English) Railway applications - Energy measurement system on board trains - Part 2: Energy measurement
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard S34
Classification of International Standard 45.060
Word Count Estimation 78,759
Date of Issue 2024-09-29
Date of Implementation 2025-04-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 44639.2-2024: Railway applications - Energy measurement system on board trains - Part 2: Energy measurement


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 45.060 CCSS34 National Standard of the People's Republic of China Rail transit train power measurement system Part 2.Electrical energy measurement Part 2.Energy measurement trains-Part 2.Energymeasurement,MOD) Released on 2024-09-29 2025-04-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction V 1 Scope 1 2 Normative references 2 3 Terms, definitions, abbreviations and symbols 3 3.1 Terms and Definitions 3 3.2 Abbreviations 7 3.3 Symbols 7 4 General requirements 7 4.1 Overview 7 4.2 Electric energy measurement function 8 4.3 Sensor 10 4.4 Electric energy calculation function 20 5 Conformance Test 29 5.1 General Principles29 5.2 Experimental Framework 29 5.3 Design Review 30 5.4 Type inspection 31 5.5 Factory Inspection 48 Appendix A (Normative) EMF Configuration 51 Appendix B (Informative) EMF Accuracy Expression 55 Appendix C (Informative) Recalibration and its mechanism recommendations 61 Appendix D (Normative) External magnetic induction test 64 Appendix E (Informative) Durability Test 66 References 69

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is part 2 of GB/T 44639 "Electric Energy Measurement System for Rail Transit Trains". Lower part. --- Part 1.General; --- Part 2.Electrical energy measurement; --- Part 3.Data processing; --- Part 4.Communications; --- Part 5.Conformance test; --- Part 6.Requirements other than billing. This document is modified to adopt IEC 62888-2.2018 "Rail transit train power measurement system Part 2.Power measurement". This document has made the following structural adjustments compared to IEC 62888-2.2018. --- Appendix A corresponds to Appendix B of IEC 62888-2.2018; --- Appendix B corresponds to Appendix C of IEC 62888-2.2018; --- Appendix C corresponds to Appendix D of IEC 62888-2.2018; --- Appendix D corresponds to Appendix A of IEC 62888-2.2018. The technical differences between this document and IEC 62888-2.2018 and the reasons are as follows. ---Replace IEC 60085 (see 4.3.3.3, 4.3.4.2, 4.4.3.5) with the normative reference GB/T 11021 to adapt to my country's technology Conditions, increase operability; --- Replace IEC 60068-2-1 (see 5.4.2.4) with the normative reference GB/T 2423.1 to adapt to my country's technical conditions, and add Operability; --- Replace IEC 60068-2-30 (see 5.4.2.6) with the normative reference GB/T 2423.4 to adapt to my country's technical conditions, and add Increase operability; --- Replace IEC 60121 (see 5.4.3.11.1) with the normative reference GB/T 3954 to adapt to my country's technical conditions and increase Operability; --- Replace IEC 60529 (see 5.4.2.3) with the normative reference GB/T 4208 to adapt to my country's technical conditions and increase operability Sex; --- Replace IEC 60028 (see 5.4.3.11.1) with the normative reference GB/T 5585.1 to adapt to my country's technical conditions, and add Operability; --- Replace IEC 61000-4-2 (see 5.4.4.5.3) with the normative reference GB/T 17626.2 to adapt to my country's technical conditions, and add Increase operability; --- Replace IEC 61000-4-3 (see 5.4.4.5.4) with the normative reference GB/T 17626.3 to adapt to my country's technical conditions, and add Increase operability; --- Replace IEC 61000-4-4 (see 5.4.4.5.5) with the normative reference GB/T 17626.4 to adapt to my country's technical conditions, and add Increase operability; --- Replace IEC 61000-4-5 (see 5.4.4.5.7) with the normative reference GB/T 17626.5 to adapt to my country's technical conditions, and add Increase operability; --- Replace IEC 61000-4-6 (see 5.4.4.5.6) with the normative reference GB/T 17626.6 to adapt to my country's technical conditions, and add Increase operability; --- Replace IEC 61869 with the normative reference GB/T 20840 (all parts) (see 4.3.2.1, 4.3.2.2.1, 5.4.2.11.1, --- Replace IEC 62497-1 with the normative reference GB/T 32350.1 (see 4.3.2.2.1, 4.3.2.2.2, 5.3.2.5, 5.4.2.11.1, --- Deleted the following information. "If EMF is included as a function of traction equipment or auxiliary equipment, there is no need to classify the equipment type. Marking. " (see 4.2.1.3 of IEC 62888-2.2018) to meet the requirements of Class 1 electrical energy measurement; --- Deleted the description of "other voltages may be agreed upon by the parties concerned." in the rated voltage (see 4.2.2.1 of IEC 62888-2.2018) to Adapt to the technical conditions of our country; --- Deleted the description of "other frequencies may be agreed upon by the parties concerned" in the rated frequency (see 4.2.2.3 of IEC 62888-2.2018) to Adapt to the technical conditions of our country; --- Changed "Continuous magnetic induction from external sources", "Radio frequency electromagnetic field 30kHz~2GHz", "Conducted interference induced by radio frequency field 150kHz~ 80MHz” and “external magnetic induction at the reference frequency”, the reference values of the influencing quantities are changed from “equal to zero” to “environmental electromagnetic Field” (see Table 1, Table 1 of IEC 62888-2.2018) to adapt to practical applications; --- Deleted the requirements for frequencies of 16.7 Hz and 60 Hz (see 4.3.2.3.4, Table 18, 5.4.4.4.3 of IEC 62888-2.2018) because There is no 16.7Hz and 60Hz power supply standard in my country; --- Deleted the description of analog sensors "The rated value shall be determined by agreement between the supplier and the purchaser." (see IEC 62888-2.2018 4.3.3.1.2) to adapt to my country's national conditions; --- Changed the functional random vibration test requirements to vibration test requirements (see 5.4.2.8, 5.4.2.8 of IEC 62888-2.2018) to Consistent with GB/T 25119-2021 requirements; --- Changed the electromagnetic compatibility requirement to "During the test, the ECF should not show any temporary degradation, loss of function or loss of performance." (See 4.4.7.1.3, 4.4.7.1.4, 4.4.7.1.3, 4.4.7.1.4 of IEC 62888-2.2018) to be consistent with GB/T 24338.4-2018 Requires consistency; --- Changed the test site ambient temperature range to between 5°C and 40°C (see 5.4.3.10, 5.4.3.11.1, 5.4.4.2.2, IEC 62888-2.2018 5.4.3.10, 5.4.3.11.1, 5.4.4.2.2) to adapt to my country's national conditions; --- Changed the requirement of "A.8 EMF without VMF" to "if applicable" (see A.8, B.8 of IEC 62888-2.2018) to apply Should be applied in practice. The following editorial changes were made to this document. --- Deleted the standard description of the frequency variation range (see Table 18 of IEC 62888-2.2018), because the frequency specified in the national standard The rate range does not match the actual usage of the equipment; --- Deleted the European description of frequency change control (see footnote c of Table 18 of IEC 62888-2.2018) and changed the traction unit Description of the operating frequency variation range (see footnote c of Table 18, footnote c of Table 18 of IEC 62888-2.2018) to adapt to my country's national conditions; --- Deleted the description of the relevant guidelines for heat and fire resistance tests in European countries (see Note 5.4.2.7 of IEC 62888-2.2018); --- Added the reference standard description of AC active power under harmonic conditions (see B.4.1) to adapt to practical applications. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed by the National Railway Administration. This document is under the jurisdiction of the National Rail Transit Electrical Equipment and System Standardization Technical Committee (SAC/TC278). This document was drafted by. Zhuzhou CRRC Times Electric Co., Ltd., China Railway Inspection and Certification Zhuzhou Traction Electrical Equipment Inspection Station Co., Ltd. CRRC Nanjing Puzhen Co., Ltd., CRRC Zhuzhou Electric Locomotive Co., Ltd., CRRC Qingdao Sifang Locomotive Co., Ltd., Guangzhou Metro Group Co., Ltd. and Shanghai Shentong Metro Group Co., Ltd. The main drafters of this document are. Luo Yunfei, Wu Bin, Sun Minjie, Wang Aiwu, Wang Lei, Yu Jin, Chen Si, and Zhou Qiaolian.

Introduction

Energy efficiency is essential to meet the challenges of supporting energy policies, protecting the environment and conserving natural resources. Energy efficiency, especially the standardization of overall energy efficiency of rail transit vehicles, has attracted great attention from the rail transit industry, and relevant standards are being gradually formulated. The main contents include the definition and boundary of energy efficiency, influencing factors, test methods, etc. GB/T 44639 "Electric Energy Measurement for Rail Transit Trains" The "Electricity Measurement System" aims to standardize the process of obtaining train power data and ensure the reliability of the data. It consists of six parts. --- Part 1.General. The purpose is to specify the system-level requirements of the energy measurement system and to implement one or more General requirements for equipment with multiple functions. --- Part 2.Electric energy measurement. The purpose is to specify the requirements for the electric energy measurement function for measuring the electric energy consumed and regenerated by the traction unit. And the requirements for the voltage measurement function, current measurement function and electric energy calculation function that constitute the electric energy measurement function. --- Part 3.Data processing. The purpose is to specify the data processing system and ground data collection service in the electric energy measurement system requirements. --- Part 4.Communications. The purpose is to specify the requirements for on-board data communication services and vehicle-to-ground communication services of the energy measurement system. These communication services enable data to be transferred between functions within the energy measurement system, between the energy measurement system and other on-board units, and between data Handles exchanges between the system and ground servers. --- Part 5.Conformance test. The purpose is to specify the consistency test of new energy measurement systems installed on traction units Arrangements, and conformance testing procedures for replacement of equipment and auxiliary components. --- Part 6.Requirements other than billing. The purpose is to clarify the requirements for energy consumption benchmark testing, daily energy consumption monitoring, and technology research and development. Able to measure the specific requirements of the system. The functional structure, main sub-functions and data flow of the train power measurement system are shown in Figure 1. Figure 1 Schematic diagram of EMS functional structure and data flow Rail transit train power measurement system Part 2.Electrical energy measurement

1 Scope

This document specifies the requirements for the energy measurement functions in an energy measurement system for measuring energy directly taken from and/or Electrical energy fed back to the traction grid system. This document specifies the current measurement function (e.g. current sensor), voltage measurement function (e.g. voltage sensor) and energy calculation function (e.g. energy meter), as well as the consistency of voltage measurement function, current measurement function, energy calculation function and complete energy measurement function Testing requirements. This document specifies the metrological requirements for Level 1 electrical energy measurement systems. This document applies to Level 1 electrical energy measurement systems. The data flow between the functional blocks of the electric energy measurement function and the connection relationship between the functional blocks are shown in Figure 2. Figure 2 Electric energy measurement function structure diagram

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 44639.2-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 44639.2-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 9 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 44639.2-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 44639.2-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.