HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (11 Oct 2025)

GB/T 44125.2-2024 English PDF

US$599.00 · In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 44125.2-2024: Railway applications - Calculation of braking performance(stopping, slowing and stationary braking) - Part 2: General algorithms utilizing step by step calculation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 44125.2-2024English599 Add to Cart 5 days [Need to translate] Railway applications - Calculation of braking performance(stopping, slowing and stationary braking) - Part 2: General algorithms utilizing step by step calculation Valid GB/T 44125.2-2024

PDF similar to GB/T 44125.2-2024


Standard similar to GB/T 44125.2-2024

TB/T 3139   GB/T 37423   GB/T 5599   GB/T 45308   GB/T 28791   GB/T 44125.1   

Basic data

Standard ID GB/T 44125.2-2024 (GB/T44125.2-2024)
Description (Translated English) Railway applications - Calculation of braking performance(stopping, slowing and stationary braking) - Part 2: General algorithms utilizing step by step calculation
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard S30
Classification of International Standard 45.060
Word Count Estimation 30,321
Date of Issue 2024-05-28
Date of Implementation 2024-12-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 44125.2-2024: Railway applications - Calculation of braking performance(stopping, slowing and stationary braking) - Part 2: General algorithms utilizing step by step calculation


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 45:060 CCSS30 National Standards of People's Republic of China Braking performance calculations for railway applications (stopping, deceleration and Static braking) Part 2: Step-by-step calculation method (ISO :20138-2:2019,MOD) Released on 2024-05-28 2024-12-01 implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Symbols and units of measurement 1 5 General explanation of the step-by-step calculation 3 6 Notes on calculation of stopping/deceleration distance and deceleration 5 7 Static brake 7 Appendix A (Normative) Parking and deceleration braking calculation process 8 Appendix B (Informative) Calculation of deceleration force (non-static) 9 Appendix C (Informative) Braking Calculation Example 12 Reference 24

Foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents" Drafting: This document is Part 2 of GB/T 44125 "Calculation of braking performance for railway applications (parking, deceleration and static braking)": GB/T 44125 has published the following parts: --- Part 1: Average calculation method; --- Part 2: Step-by-step calculation method: This document is modified to adopt ISO :20138-2:2019 "Calculation of braking performance for railway applications (parking, deceleration and static braking) Part 2 "Step-by-step calculation method": This document has the following structural adjustments compared to ISO :20138-2:2019: --- Changed the table in Appendix C: The original input data table is divided into train input data table and vehicle input data table, and the numbers are repeated in sequence: New sorting (see Appendix C): The technical differences between this document and ISO :20138-2:2019 and their reasons are as follows: --- Replaced ISO :20138-1:2018 with the normative reference GB/T 44125:1 (see 5:1, 5:2, 5:3:4, 5:4:1, 6:3, 6:4:1, 6:5:4, 6:5:8, 6:6:2, Chapter 7), the consistency between the two documents is modified to adapt to my country's technical conditions, increase Operability: The following editorial changes were made to this document: --- Deleted the terminology database description in ISO :20138-2:2019 (see Chapter 3); --- Changed the variable a in Table 1 and formula (12) to ains (see Chapter 4, 5:4:2); --- Changed the unit of ramp inclination angle (°) in Table C:3 to rad (see C:1:2): --- Changed the pressure unit "bar" to "kPa" in Table C:2 of ISO :20138-2:2019 (see Table C:3): Please note that some of the contents of this document may involve patents: The issuing organization of this document does not assume the responsibility for identifying patents: This document is proposed and coordinated by the National Railway Administration: This document was drafted by: China Academy of Railway Sciences Group Co:, Ltd: Locomotive and Rolling Stock Research Institute, China Academy of Railway Sciences Group Co:, Ltd: CRRC Qingdao Sifang Rolling Stock Research Institute Co:, Ltd:, CRRC Tangshan Locomotive and Rolling Stock Co:, Ltd:, CRRC Changchun Railway Vehicles Co:, Ltd: Datong Railway Vehicles Co:, Ltd:, CRRC Qingdao Sifang Locomotive and Rolling Stock Co:, Ltd:, CRRC Zhuzhou Electric Locomotive Co:, Ltd:, CRRC Qiqihar EL VEHICLES LIMITED: The main drafters of this document are: Jin Zhe, Jin Yuzhi, Song Rui, Cai Tian, Chen Meng, Shi Zhewen, Liu Zhonghua, Qiao Feng, Xu Li, Zhang Liguo, Li Dan, Lu Zhengtao:

Introduction

The International Organization for Standardization Railway Application Technical Committee (ISO /TC269) has developed the braking performance calculation (parking, deceleration and static braking) Standards for dynamics: average calculation method and step-by-step calculation method, used for calculation of braking distance, deceleration, power and energy of railway vehicles: The calculation method of braking performance is in line with China's national conditions and in line with international standards: GB/T 44125 "Calculation of braking performance for railway applications (parking, Deceleration and Static Braking)》, which is planned to consist of two parts: --- Part 1: Average calculation method: The purpose is to use a general algorithm and formula with average value input to calculate all types of trains and The stopping or deceleration distance of a single rolling stock and the corresponding braking power and energy for the corresponding braking distance: --- Part 2: Step-by-step calculation method: The purpose is to use a general algorithm and formula with instantaneous value input to calculate all types of trains and The stopping or deceleration distance of a single rolling stock and the corresponding braking power and energy for the corresponding braking distance: Braking performance calculations for railway applications (stopping, deceleration and Static braking) Part 2: Step-by-step calculation method

1 Scope

This document specifies the calculation of the braking system stopping/decelerating distance and the braking power and A general algorithm for energy and other braking performance: This document applies to the calculation of the braking forces generated by common types of braking systems: This document is not applicable to the calculation of parking brake distances in conditions exceeding the available adhesion level (wheel slip): Note 1: This document does not specify specific acceptance criteria such as pass/fail: NOTE 2 This document is not intended as a design guide for the selection of braking systems, nor does it specify performance requirements for braking systems: NOTE 3 If other types of braking systems are used, such as new equipment or new types of equipment, other methods of calculating braking force are used:

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document: For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document: GB/T 44125:1 Calculation of braking performance for railway applications (parking, deceleration and static braking) Part 1: Average calculation method (GB/T 44125:1-2024, ISO :20138-1:2018, MOD)

3 Terms and definitions

The following terms and definitions apply to this document: 3:1 Slowing distance slowing distance The distance traveled from the initial braking request to the final speed vfin: Note: When the final speed vfin=0m/s, the deceleration distance is also called the parking braking distance: 3:2 deceleration time slowingtime The time elapsed from the initial braking request to the final speed vfin being reached: Note: When the final speed vfin=0m/s, the deceleration time is also called parking brake time:

4 Symbols and units of measurement

The symbols and units of variables used in this document shall comply with the requirements of Table 1 and GB/T 44125:1:

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 44125.2-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 44125.2-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 44125.2-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 44125.2-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.