|
US$1799.00 · In stock Delivery: <= 10 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 44026-2024: Technical specification for prefabricated cabin type lithium ion battery energy storage system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 44026-2024 | English | 1799 |
Add to Cart
|
10 days [Need to translate]
|
Technical specification for prefabricated cabin type lithium ion battery energy storage system
| Valid |
GB/T 44026-2024
|
PDF similar to GB/T 44026-2024
Basic data | Standard ID | GB/T 44026-2024 (GB/T44026-2024) | | Description (Translated English) | Technical specification for prefabricated cabin type lithium ion battery energy storage system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F19 | | Classification of International Standard | 27.180 | | Word Count Estimation | 90,954 | | Date of Issue | 2024-05-28 | | Date of Implementation | 2024-12-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 44026-2024: Technical specification for prefabricated cabin type lithium ion battery energy storage system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 27:180
CCSF19
National Standards of People's Republic of China
Technical Specifications for Prefabricated Module Lithium-ion Battery Energy Storage System
energystoragesystem
2024-12-01 implementation
State Administration for Market Regulation
The National Standardization Administration issued
Table of Contents
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 Classification and coding 2
5 Normal working conditions 4
6 Appearance, dimensions and protection level 4
7 Functional Requirements 4
8 Performance requirements 6
9 Equipment and parts19
10 Test methods 21
11 Inspection Rules 65
12 Marking, packaging, transportation and storage 68
Appendix A (Informative) Typical Topology of Prefabricated Container Energy Storage System 70
Appendix B (Normative) Clearance and Creepage Distance 71
Appendix C (Normative) Equipment Symbols 75
Appendix D (Informative) Equipment and Components Statistics 77
Appendix E (Informative) Equipment and Component Specifications 78
Appendix F (Normative) Calculation method of active power control response time, regulation time and control deviation parameters 81
References 82
Foreword
This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for standardization work Part 1: Structure and drafting rules for standardization documents"
Drafting:
Please note that some of the contents of this document may involve patents: The issuing organization of this document does not assume the responsibility for identifying patents:
This document was proposed by the China Electricity Council:
This document is under the jurisdiction of the National Electric Energy Storage Standardization Technical Committee (SAC/TC550):
This document was drafted by: China Electric Power Research Institute Co:, Ltd:, Contemporary Amperex Technology Co:, Ltd:, Sungrow Power Supply Co:, Ltd:
Co:, Ltd:, BYD Auto Industry Co:, Ltd:, Zhejiang Huayun Clean Energy Co:, Ltd:, Hangzhou Gote Electronic Equipment Co:, Ltd:,
Beijing Goldwind Zero Carbon Energy Co:, Ltd:, China Energy Engineering Group Guangdong Electric Power Design Institute Co:, Ltd:, Beijing Haibosichuang Technology Co:, Ltd:
Co:, Ltd:, Wuhan Yiwei Energy Storage Co:, Ltd:, Huawei Digital Energy Technology Co:, Ltd:, Shanghai Electrical Equipment Testing Institute, Guangzhou Zhiguang Energy Storage
Technology Co:, Ltd:, CIMC Energy Storage Technology Co:, Ltd:, China Energy Group New Energy Technology Research Institute Co:, Ltd:, China Huadian Science and Industry Group
Co:, Ltd:, Tianjin Lishen New Energy Technology Co:, Ltd:
The main drafters of this document are: Guan Yibiao, Qu Zhanzhan, Liu Hao, Xu Jinmei, Zhou Jianjie, Wang Junli, Xu Junjie, Dong Dong, Wang Hao, Zhang Xu, Zhou Yu,
Guo Cuijing, Lin Jiubiao, Li Ke, Hu Juan, Li Xinqiang, Shi Benxing, Fu Shengming, Yu Shijiang, Chen Xiang, Zhang Zhiyuan, Li Yanhong, Jin Yi, Gao Fei, Li Xinshu,
Wang Huanling:
Technical Specifications for Prefabricated Module Lithium-ion Battery Energy Storage System
1 Scope
This document specifies the appearance, dimensions and protection of the prefabricated cabin lithium-ion battery energy storage system (hereinafter referred to as the "prefabricated cabin energy storage system"):
The levels, equipment and components, functional requirements and performance requirements are described, and the corresponding test methods are specified, including classification and coding, normal working conditions, inspection
Inspection rules, marking, packaging, transportation and storage, etc:
This document applies to the design of prefabricated cabin energy storage systems with a rated power of not less than 100kW and a rated energy of not less than:200kW·h:
Design, manufacture, test, inspection, operation, maintenance and overhaul:
2 Normative references
The contents of the following documents constitute the essential clauses of this document through normative references in this document:
For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to
This document:
GB/T 1094:1 Power transformers Part 1: General
GB/T 1094:11 Power transformers Part 11: Dry-type transformers
GB/T 2423:4 Environmental testing for electric and electronic products Part 2: Test method Test Db: Cyclic damp heat (12h 12 cycles)
GB/T 3836:1 Explosive atmospheres Part 1: General requirements for equipment
GB/T 4208 Enclosure protection grade (IP code)
GB/T 6067:1 Safety regulations for lifting machinery Part 1: General
GB/T 6113:104 Specification for radio disturbance and immunity measuring equipment and methods Part 1-4: Radio disturbance and immunity
Antennas and test sites for radiated disturbance measurements of measurement equipment
GB/T 7251:1 Low voltage switchgear and controlgear Part 1: General
GB 8624 Classification of combustion performance of building materials and products
GB/T 10228 Technical parameters and requirements for dry-type power transformers
GB/T 12325 Power quality supply voltage deviation
GB/T 12326 Power quality voltage fluctuation and flicker
GB 12514:1 Fire protection interface Part 1: General technical requirements for fire protection interfaces
GB/T 14549 Power quality - Harmonics in public power grids
GB/T 15543 Power quality three-phase voltage unbalance
GB/T 16895:6 Low voltage electrical equipment Part 5-52: Selection and installation of wiring systems for electrical equipment
GB/T 16927:2 High voltage test technology Part 2: Measurement system
GB/T 16935:1 Insulation coordination for equipment in low voltage systems Part 1: Principles, requirements and tests
GB/T 17626:2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626:3 Electromagnetic compatibility test and measurement technology Radio frequency electromagnetic field radiation immunity test
GB/T 17626:4 Electromagnetic compatibility test and measurement technology Electrical fast transient pulse group immunity test
GB/T 17626:5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626:6 Electromagnetic compatibility test and measurement technology - Immunity to conducted disturbances induced by radio frequency fields
GB/T 19582 (all parts) Industrial automation network specification based on Modbus protocol
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 44026-2024_English be delivered?Answer: Upon your order, we will start to translate GB/T 44026-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 6 ~ 10 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 44026-2024_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 44026-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|