HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 42321-2023 English PDF

US$579.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 42321-2023: Additional requirements for internal arc classified pole-mounted metal-enclosed switchgear for rated voltages above 3.6 kV and up to and including 40.5 kV
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 42321-2023English579 Add to Cart 5 days [Need to translate] Additional requirements for internal arc classified pole-mounted metal-enclosed switchgear for rated voltages above 3.6 kV and up to and including 40.5 kV Valid GB/T 42321-2023

PDF similar to GB/T 42321-2023


Standard similar to GB/T 42321-2023

GB/T 11022   GB/T 38328   GB/T 30092   GB/T 45932   GB/Z 15166.8   

Basic data

Standard ID GB/T 42321-2023 (GB/T42321-2023)
Description (Translated English) Additional requirements for internal arc classified pole-mounted metal-enclosed switchgear for rated voltages above 3.6 kV and up to and including 40.5 kV
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K43
Classification of International Standard 29.130.10
Word Count Estimation 30,336
Date of Issue 2023-03-17
Date of Implementation 2023-10-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 42321-2023: Additional requirements for internal arc classified pole-mounted metal-enclosed switchgear for rated voltages above 3.6 kV and up to and including 40.5 kV


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS29:130:10 CCSK43 National Standards of People's Republic of China 3:6kV~40:5kV with internal arc category Additional requirements for pole-mounted metal-enclosed switchgear andincluding52kV, MOD) 2023-03-17 release 2023-10-01 implementation State Administration for Market Regulation Released by the National Standardization Management Committee

table of contents

Preface III Introduction V 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Normal and special conditions of use3 5 rating 3 5:1 Overview 3 5:2 Rated Internal Arc Category (IAC) 3 6 Design and structure 4 6:1 Nameplate 4 6:2 Internal arc faults 4 6:3 Housing 5 7 Type test 6 7:1 General 6 7:2 Internal arc type test 7 8 Guidelines for Selection of Switchgear 15 8:1 Overview 15 8:2 Internal arc faults 15 9 Documents provided with the order, tender and inquiry 18 Appendix A (Informative) The structural changes of this document compared with IEC 62271-214:2019 19 Appendix B (Normative) Confirmation of Samples 21 B:1 General 21 B:2 Information 21 B:3 Pattern 21 Reference 23 Figure 1 Example of structural arrangement of three-phase enclosures and compartments 5 Figure 2 Example of single-phase enclosure and compartment structure layout 6 Figure 3 Test arrangement of pole-mounted switchgear8 Figure 4 Level indicator 9 Figure 5 Flowchart for determining arc ignition based on product structure13 Table 1 Nameplate information 4 Table 2 Internal failure test parameters according to the structure of the enclosure and compartment12 Table 3 Location and cause of internal faults and examples of measures to reduce the probability of internal arc faults16 Table 4 The single-phase-to-ground arc fault current determined according to the grid neutral point grounding condition17 Table A:1 Comparison between this document and IEC 62271-214:2019 structure number 19 Table B:1 Confirm the pattern and content of the test product 21

foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting: This document is modified to adopt IEC 62271-214:2019 "High Voltage Switchgear and Controlgear Part 214: 1kV~52kV Column Internal arc ratings for the installation of metal-enclosed switchgear and controlgear: The technical differences between this document and IEC 62271-214:2019 and the reasons are as follows: a) Modify the voltage range from 1kV~52kV to 3:6kV~40:5kV, and modify 60Hz and below to 50Hz and above (see Chapter 1) to adapt to the actual situation in our country; b) The reference to GB/T 3906-2020 (see Chapter 3) is added to meet the actual requirements of our country; c) The term "switchgear" (see 3:1) has been added for a better understanding of this document; d) The term "functional unit" (see 3:1:3 of IEC 62271-214:2019) was deleted to avoid confusion with the term "functional unit" used in other standards unit" definition; e) In the conditions of use, change "covered by relevant IEC standards" to "covered by GB/T 11022-2020" (see Chapter 4), with a higher Regulate the scope of application of the products regulated by the standard to avoid ambiguity caused by wrong references; f) Deleted rated voltage (see 5:1 and 5:2 of IEC 62271-214:2019), rated frequency (see 5:1 and 5:2 of IEC 62271-214:2019 5:1 and 5:4) and other two ratings that are not closely related to the internal arc category of pole-mounted metal-enclosed switchgear should be avoided: Conflict and duplication of product standards; g) Delete the rated insulation level (see 5:3 of IEC 62271-214:2019), this rating does not apply to this document and does not need to be attached add requirements for inclusion; h) The duration of the single-phase-to-earth arc fault is added to the requirements specified by the manufacturer (see 5:2:4), in order to maintain consistency with other product standards consistent; i) The marking requirements for the rated approach distance are added, and the single-phase and three-phase fault current rating marking requirements (see 6:2) are combined to Alignment with other product standards; j) The requirement that the layout distance should be included in the test layout diagram (see 7:1:3) is added to standardize the actual operation of the laboratory; k) The geometric center of the test object is added as the layout center of the indicator, and the convenient test height is recommended to be 0:5m~2m (see 7:2:3), to guide the laboratory to carry out the type test; l) Change the peak current should not be lower than 90% of the peak value of the rated short-circuit current to not be lower than the peak value of the rated short-circuit current (see 7:2:6:3:2), to be consistent with GB/T 3906; m) "Factory test" (see Chapter 8 of IEC 62271-214:2019) is deleted, and the contents of this chapter are not applicable to metal enclosures installed on columns switchgear internal arc category; n) The relevant requirements in the selection guidelines need to consider the description of laws and user safety manuals (see 8:1); o) The specified minimum installation height is the rated proximity distance declared by the manufacturer plus 2m (see 8:2:4) to regulate the installation of equipment, increasing safety; p) Adjust Note 2 in Table 4 to the text content (see 8:2:6); q) Delete "Transportation, storage, installation, operation and maintenance rules" (see Chapter 11 of IEC 62271-214:2019), "Safety" (see Chapter 12 of IEC 62271-214:2019), "The impact of products on the environment" (see Chapter 13 of IEC 62271-214:2019), etc: Install the metal-enclosed switchgear on the column with the chapters that are not closely related to the internal arc category, so as to avoid conflicts and repetitions with related product standards: The following editorial changes have been made to this document: ---In order to be consistent with my country's technical standard system, the name of the standard was changed to "3:6kV~40:5kV pole-mounted safety with internal arc category Additional requirements for installation of metal-enclosed switchgear"; --- Deleted the note describing common names such as "high voltage" and "medium voltage" (see Chapter 1 of IEC 62271-214:2019); --- Deleted the description of the term database address (see Chapter 3 of IEC 62271-214:2019); --- Delete the reference in Table 2 (see 5:101:2 of IEC 62271-214:2019); --- Split the original Figure 1 (see 6:102 of IEC 62271-214:2019) into Figure 1 and Figure 2 (see 7:3) according to the number of phases to comply with GB/T 1:1 Requirements; Change the components in Figure 1d) to components whose main circuits are covered with solid insulation to meet the actual product conditions in our country; --- Redraw the test layout of the switchgear on the pole according to the principle of engineering drawing (see 7:2:3); ---Add Appendix A (informative) to the structural changes of this document compared with IEC 62271-212:2016: Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed by China Electrical Equipment Industry Association: This document is under the jurisdiction of the National High Voltage Switchgear Standardization Technical Committee (SAC/TC65): This document is drafted by: Xi'an High Voltage Apparatus Research Institute Co:, Ltd:, Qingdao Ocean Electric Equipment Testing Co:, Ltd:, Xi'an High Voltage Electrical Appliance Research Institute Changzhou Co:, Ltd:, China Electric Power Research Institute Co:, Ltd:, Yingweilong (Guangdong) Electric Co:, Ltd:, Schneider Electric Gas (China) Co:, Ltd:, State Grid Hebei Electric Power Co:, Ltd: Electric Power Research Institute, State Grid Jiangsu Electric Power Co:, Ltd: Electric Power Research Institute, Shanghai Electric Transmission and Distribution Test Center Co:, Ltd:, State Grid Liaoning Electric Power Co:, Ltd: Electric Power Research Institute, Cooper (Ningbo) Electric Co:, Ltd: Co:, Ltd:, State Grid Shanxi Electric Power Company Electric Power Research Institute, Xiamen University of Technology, State Grid Sichuan Electric Power Company Electric Power Research Institute, Liao Ning High Voltage Electrical Products Quality Inspection Co:, Ltd:, Liaoning Dongke Electric Power Co:, Ltd:, Suzhou Electrical Appliance Science Research Institute Co:, Ltd:, ABB (China) Co:, Ltd:, Shenzhen Electric Research Institute, Pinggao Group Co:, Ltd:, Yunnan Power Grid Co:, Ltd: Electric Power Research Institute, Risheng Group Co:, Ltd:, Beijing Cree Distribution Automation Co:, Ltd:, Jiangsu Daquan High Voltage Switch Co:, Ltd:, Shandong Taikai Vacuum Switch Co:, Ltd:, Xi'an Xidian High Voltage Switchgear Co:, Ltd:, Xidian Baoji Electric Co:, Ltd:, Shuangjie Electric Hefei Co:, Ltd:, Qingdao Yihe Electric Group Co:, Ltd:, Shandong Taikai Complete Electric Co:, Ltd:, Shandong Taikai High Voltage Switch Co:, Ltd:, Henan Senyuan Electric Co:, Ltd:, Shijiazhuang Kelin Electric Equipment Co:, Ltd:, Tianyi Electric Co:, Ltd:, Jiangsu Jinyou Electric Co:, Ltd:, Jiang Su Jinyou Intelligent Electric Co:, Ltd:, Huayi Electric Co:, Ltd:, Fuzhou Tianyu Electric Co:, Ltd:, Huiwang Electric Co:, Ltd:, Guangzhou Dongzhengchao Electric Co:, Ltd:, Ningbo Tianzhi Electric Technology Co:, Ltd:, Asia Power Equipment (Shenzhen) Co:, Ltd:, Yantai East Weston Electric Co:, Ltd: Power Equipment Co:, Ltd:, Fujian China Network Switch Co:, Ltd:, Jiangsu Rugao High Voltage Electrical Appliance Co:, Ltd:, Ningbo Shunli High Voltage Switch Technology Co:, Ltd: Company, Tianjin Pinggao Intelligent Electric Co:, Ltd:, Shenzhen Qihui Electric Co:, Ltd:, Xu Jideli Shier Electric Co:, Ltd: The main drafters of this document: Liu Haojun, Zhang Zixiao, Zhang Haifeng, Tian Enwen, Li Jiang, Feng Ying, Tan Yan, Zhang Changchun, Zhang Zhenqian, Wang Hao, Lei Xiaoqiang, Wang Haoqing, Guo Qiang, Li Zheyuan, Wang Le, Pang Xianhai, Zhang Min, Xiao Hanyan, Zhu Renchen, Wang Feiming, Liu Chengxue, Li Guodong, Dai Dongyun, Li Ling, Jia Zhijie, Zhao Jingbo, Wang Jinhui, Liu Guangwei, Zhang Chongle, Luan Hailong, Wang Zhian, Xiao Minying, Wang Xiangke, Shao Li, Shi Weijian, Ye Zubiao, Wang Hua, Qin Chengwei, Liu Huanguo, Gu Wangrong, Qiao Dong, Wang Cunfu, Liang Jianfeng, Kong Xiangchong, Wang Xinjun, Wang Feng, Liu Huike, Gu Lili, Wei Kai, Cai Ping, Duan Hongmin, Liu Jinchao, Wei Meihua, Li Qingping, Chen Yang, Lin Fangbin, Wang Bangtian, Qiu Zhiren, Zhou Zhenye, Chen Yanliang, Wu Hanrong, Lin Fuming, Guo Genghe, Lou Qingyu, Wang Jiping, Chen Jinghui, Zhao Bin, Xu Tiancong, Chen Limin, Yu Hongyu, Deng Yonghui, Wu Xiaozhao:

Introduction

According to the requirements of the high-voltage switchgear standard system, the product standard will only consider the equipment with closed terminals, and will Part of the IAC category of enclosed switchgear is separated, so this document is formulated: This document is consistent with the standard system of high voltage switchgear related to other product standards: 3:6kV~40:5kV with internal arc category Additional requirements for pole-mounted metal-enclosed switchgear

1 Scope

This document specifies the terms and definitions, ratings, design and construction of pole-mounted metal-enclosed switchgear with an internal arc category: Additional requirements such as structure, type test and selection guidelines: This document applies to the installation of metal-enclosed switchgear on columns with a rated voltage of 3:6kV~40:5kV and a frequency of 50Hz or less: This document applies to three-phase, two-phase and single-phase equipment with open terminals: Its housing may contain fixed and movable parts and may be filled with Fluid (liquid or gas) for insulation: The metal-enclosed switchgear installed on the pole, on the basis of conforming to the respective product standards, the relevant provisions of its internal arc category meet the requirements of this Documentation required: This document does not exclude other equipment that may be contained within the same enclosure: In this case, it is necessary to consider the effect of the device on any switchgear any possible impact:

2 Normative references

The contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document: GB/T 2900:20-2016 Electrotechnical Terminology High Voltage Switchgear and Controlgear (IEC 60050-441:1984, MOD) Note: There is no technical difference between the referenced content of GB/T 2900:20-2016 and the referenced content of IEC 60050-441:1984: GB/T 2900:83-2008 Electrotechnical terms Electric and magnetic devices (IEC 60050-151:2001, IDT) GB/T 3906-2020 3:6kV~40:5kV AC metal-enclosed switchgear and controlgear (IEC 62271-200: 2011, MOD) GB/T 11022-2020 Common technical requirements for high-voltage AC switchgear and control equipment standards (IEC 62271-1:2017, MOD) Note: There is no technical difference between the referenced content of GB/T 11022-2020 and the referenced content of IEC 62271-1:2017:

3 Terms and Definitions

GB/T 2900:20-2016, GB/T 2900:83-2008, GB/T 3906-2020 and GB/T 11022-2020 and the following terms and definitions apply to this document: 3:1 Switchgear switchgear Mainly used for switchgear related to power generation, transmission, distribution and power conversion and its combination with control, measurement, protection and regulation equipment Combination, including the final assembly consisting of these devices and equipment and associated internal connections, accessories, housings and supports: [Source: GB/T 2900:20-2016, 3:2]

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 42321-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 42321-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 42321-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 42321-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.