HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (12 Oct 2025)

GB/T 41519-2022 English PDF

US$189.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 41519-2022: Requirements for water resource protection during shale gas development
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 41519-2022English189 Add to Cart 3 days [Need to translate] Requirements for water resource protection during shale gas development Valid GB/T 41519-2022

PDF similar to GB/T 41519-2022


Standard similar to GB/T 41519-2022

GB/T 26982   GB/T 19492   GB 36170   

Basic data

Standard ID GB/T 41519-2022 (GB/T41519-2022)
Description (Translated English) Requirements for water resource protection during shale gas development
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard E20
Word Count Estimation 9,977
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 41519-2022: Requirements for water resource protection during shale gas development

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Requirements for water resource protection during shale gas development ICS 75.010 CCSE20 National Standards of People's Republic of China Requirements for water resources protection during shale gas development Published on 2022-04-15 2022-11-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Water intake requirements 1 5 Water requirements2 6 Wastewater Disposal Requirements 2 7 Water Pollution Prevention and Control Requirements 2 8 Monitoring requirements4 Reference 5

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed and managed by the National Natural Gas Standardization Technical Committee (SAC/TC244). This document is drafted by. China National Petroleum Corporation Southwest Oil and Gas Field Branch, China National Petroleum Corporation Chuanqing Drilling Engineering Co., Ltd. Co., Ltd., Sinopec Chongqing Fuling Shale Gas Exploration and Development Co., Ltd., Shaanxi Yanchang Petroleum (Group) Co., Ltd., Southwest Petroleum University. The main drafters of this document. Zhu Jin, Li Jing, Liu Chunyan, Wang Xingrui, Li Wei, Hu Jinyan, Chen Tianxin, Wang Long, Xiang Qigui, Dai Zhong, Huang Lingling, Xie Haitao, Xia Xubo, Fang Xiaojun, Li Hui, Liu Wenshi. Requirements for water resources protection during shale gas development

1 Scope

This document specifies the requirements for water intake, water use, waste water disposal, water pollution prevention and control, and monitoring in the process of shale gas development. This document is applicable to the protection of water resources in shale gas pre-drilling engineering, drilling (completion) engineering, fracturing engineering, gathering and transportation engineering and other processes.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB 3838 Environmental Quality Standard for Surface Water GB 8978 Integrated Wastewater Discharge Standard GB/T 14848 Groundwater Quality Standard GB 18597 Hazardous Waste Storage Pollution Control Standard GB 18599 General Industrial Solid Waste Storage and Landfill Pollution Control Standard GB/T 31033 Technical Specification for Oil and Gas Drilling Well Control GB 50013 Design Standard for Outdoor Water Supply GB/T 50934 Technical Specification for Anti-seepage of Petrochemical Engineering HJ/T 91 Technical Specification for Surface Water and Sewage Monitoring HJ164 Technical Specification for Groundwater Environmental Monitoring HJ610 Environmental Impact Assessment Technical Guidelines Groundwater Environment HJ819 General Principles of Technical Guidelines for Self-monitoring of Pollutants HJ2025 Technical Specifications for Hazardous Waste Collection, Storage and Transportation

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 flowbackfluids Fracturing fluid that flows back to the surface after the hydraulic fracturing operation.

4 Requirements for water intake

4.1 Water intake for shale gas development should follow the principles of rational utilization, economical use, and effective protection, and conform to the comprehensive planning of river basins or regions and special plans such as water resource protection plans, and comply with approved water allocation plans or agreements. 4.2 The water source can be selected from surface water, urban reclaimed water, water supply from water projects, and urban tap water. 4.3 When the construction unit directly draws surface water (water from rivers and lakes), it shall apply for a water drawing permit. 4.4 The type of water intake structures should be based on the water intake volume and water quality requirements, combined with the river bed topography and geology, river bed erosion and deposition, water depth and water level variation,

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 41519-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 41519-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 41519-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 41519-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.