US$249.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41512-2022: Distributed wind energy generation systems Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 41512-2022 | English | 249 |
Add to Cart
|
3 days [Need to translate]
|
Distributed wind energy generation systems
| Valid |
GB/T 41512-2022
|
PDF similar to GB/T 41512-2022
Basic data Standard ID | GB/T 41512-2022 (GB/T41512-2022) | Description (Translated English) | Distributed wind energy generation systems | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F11 | Word Count Estimation | 12,180 | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41512-2022: Distributed wind energy generation systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Distributed wind energy generation systems
ICS 27.180
CCSF11
National Standards of People's Republic of China
Decentralized wind turbines
Published on 2022-07-11
2023-02-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 2
4 Technical requirements 2
4.1 Basic requirements 2
4.2 Structural components 2
4.3 Control system 3
4.4 Mechanical system 4
4.5 Electrical system 4
4.6 Grid-connected adaptive design 5
4.7 Health, Safety and Environmental Protection Design 5
5 Test method 5
6 Inspection Rules 6
6.1 Inspection Category 6
6.2 Inspection Regulations 6
6.3 Inspection items 6
7 Packaging and Shipping 6
8 Installation, commissioning and operation and maintenance 7
8.1 Installation and debugging 7
8.2 Operation and maintenance 7
Reference 8
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed by China Machinery Industry Federation.
This document is under the jurisdiction of the National Wind Power Standardization Technical Committee (SAC/TC50).
This document is drafted by. Beijing Jianheng Certification Center Co., Ltd., China Academy of Agricultural Mechanization Science Hohhot Branch Co., Ltd.
Company, Envision Energy Co., Ltd., Xinjiang Goldwind Technology Co., Ltd., China Shipbuilding Industry Corporation Haizhuang Wind Power Co., Ltd., Zhejiang Yun
Dafeng Power Co., Ltd., Vestas Wind Technology (China) Co., Ltd., Shanghai Electric Wind Power Group Co., Ltd., CRRC Zhuzhou
Electric Locomotive Research Institute Co., Ltd., Dongfang Electric Wind Power Co., Ltd., Guodian United Power Technology Co., Ltd., Beijing Qianyuan Wind Power Technology Co., Ltd.
Co., Ltd., China Power Investment Power Engineering Co., Ltd., Mingyang Smart Energy Group Co., Ltd., CECEP Wind Power Co., Ltd., Hunan Electric Wind Power Co., Ltd.
Energy Co., Ltd., Beijing Enterprises Clean Energy Group Co., Ltd., Longyuan Power Group Co., Ltd., Guangdong Wind Power Co., Ltd., China
Yangtze Three Gorges Group Co., Ltd., Jiangxi Lixin Testing Technology Co., Ltd., Huaneng New Energy Co., Ltd., Guangdong Yudean Zhanjiang Wind Power Co., Ltd.
Electricity Co., Ltd., Inner Mongolia University of Technology, International Copper Association.
The main drafters of this document. Cai Jifeng, Wang Jianping, Ren Jun, Zhu Hongdong, Jing Shuang, Cai Meiyuan, Zhou Minqiang, Chen Qiang, Chang Chunyang, Shengke, Zeng Dong,
Yuan Ling, Zhao Zhibin, Zhuang Yan, Deng Yi, Yin Lei, Wu Linxia, Zeng Xingguo, Han Jun, Liu Junqi, Liu Donghai, Zhang Xueli, Tang Peng, Zhang Long, Li Guoqing,
He Kaihua, Meng Keqilao, Wang Dagang, Wang Baogui, Yang Zhiqian, Liu Ting.
Decentralized wind turbines
1 Scope
This document specifies the technical requirements, test methods and operation and maintenance requirements for decentralized wind turbines.
This document applies to horizontal axis grid-connected distributed wind turbines.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB/T 1094.16 Power Transformers Part 16.Transformers for Wind Power Generation
GB/T 2900.53 Electrical terminology for wind turbines
GB/T 3906 3.6kV~40.5kV AC metal-enclosed switchgear and control equipment
GB/T 5226.1 Mechanical and Electrical Safety Mechanical and Electrical Equipment Part 1.General Specifications
GB/T 12326 Power Quality Voltage Fluctuation and Flicker
GB/T 14549 Power Quality Harmonics of Public Grid
GB/T 15543 Power Quality Three-phase Voltage Unbalance
GB/T 18451.1 Design Requirements for Wind Turbines
GB/T 18451.2 Wind Turbine Power Characteristics Test
GB/T 18802.11 Low-voltage surge protector (SPD) Part 11.Performance requirements and performance requirements of surge protectors for low-voltage power systems
experiment method
GB/T 19072 Wind Turbine Tower
GB/T 19073 wind turbine gearbox design requirements
GB/T 19568 Specification for Assembly and Installation of Wind Turbines
GB/T 19960.2 Wind Turbine Part 2.General Test Methods
GB/T 19963 Technical Regulations for Wind Farm Access to Power System
GB/T 20319 Code for acceptance of wind turbines
GB/T 20320 Wind Turbine Power Quality Measurement and Evaluation Method
GB/T 22516 Wind Turbine Noise Measurement Method
GB/T 24337 Power Quality Harmonics Between Public Grids
GB /Z 25320.7 Power System Management and Its Information Exchange Data and Communication Security Part 7.Network and System Management
(NSM) Data Object Model
GB/T 25383 Wind turbine blades for wind turbines
GB/T 25384 Wind Turbine Wind Turbine Blade Full Size Structural Test
GB/T 25385 Wind Turbine Operation and Maintenance Requirements
GB/T 33593 Distributed power grid-connected technical requirements
GB/T 33629 Wind Turbine Lightning Protection
GB/T 35792 Wind Turbine Qualification Test and Certification
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41512-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41512-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41512-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41512-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|