|
US$239.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 41273-2022: Production process quality control - System model and architecture - Machining Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 41273-2022 | English | 239 |
Add to Cart
|
3 days [Need to translate]
|
Production process quality control - System model and architecture - Machining
| Valid |
GB/T 41273-2022
|
PDF similar to GB/T 41273-2022
Basic data | Standard ID | GB/T 41273-2022 (GB/T41273-2022) | | Description (Translated English) | Production process quality control - System model and architecture - Machining | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N19 | | Word Count Estimation | 12,130 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 41273-2022: Production process quality control - System model and architecture - Machining---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Production process quality control - System model and architecture - Machining
ICS 25.040.40
CCSN19
National Standards of People's Republic of China
Production Process Quality Control System Model and Architecture
Machining
Published on 2022-03-09
2022-10-01 Implementation
State Administration for Market Regulation
Released by the National Standardization Administration
directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 System Model 1
4.1 Overview 1
4.2 System Model Technical Requirements 2
5 Machining quality control5
5.1 Function overview5
5.2 Technical requirements for prior control 6
5.3 Technical requirements for in-process control 6
5.4 Technical requirements for post-event control 6
Reference 8
foreword
This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents"
drafted.
Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents.
This document is proposed by China Machinery Industry Federation.
This document is under the jurisdiction of the National Industrial Measurement Control and Automation Technical Committee (SAC/TC124).
This document is drafted by. Wuhan Marine Machinery Co., Ltd., Machinery Industry Instrumentation Comprehensive Technology and Economic Research Institute, Dongfeng Design
Research Institute Co., Ltd., Beihang University, Wuxi Vocational and Technical College, Mianyang Weibo Electronics Co., Ltd., Shandong Computing Center
Heart (National Supercomputing Jinan Center).
The main drafters of this document. Li Feng, Wang Chengcheng, Ruan Hui, He Yihai, Hua Lin, Tang Liping, Wang Kai, You Heping, Peng Zhenghong, Yang Yang, Wang Chunxi,
Yu Lei.
Production Process Quality Control System Model and Architecture
Machining
1 Scope
This document specifies the system model and quality control of the production process quality control system in the machining process.
This document is applicable to the planning, construction and use of quality control systems for machining processes in the field of discrete manufacturing, guidance related to machining
Process production enterprises carry out quality control.
2 Normative references
The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations
documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to
this document.
GB/T 37393-2019 General technical requirements for digital workshops
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Machining
The process of changing the dimensions or properties of a workpiece through a mechanical device.
Note. A form of manufacture in which manufacturing processes such as heat treatment, surface treatment, machining, painting, welding, assembly, casting, forging, blanking, 3D printing, etc.
3.2
production process
The whole process of turning raw materials into finished products.
[Source. GB/T 4863-2008, 3.1.9]
3.3
system model
For the description of the essential properties of a certain aspect of the system, in a certain form (such as words, symbols, charts, objects, mathematical formulas, etc.)
provide knowledge about the system.
4 System Model
4.1 Overview
Machining products are materials that are processed in a suitable environment, through personnel, equipment, and through a certain process according to a certain process method.
section to get the process output.
Machining production process quality control system is the information management system of machining process in production process quality control.
The quality control system model of the machining production process is the information on each operation process and data flow of the machining process quality control.
Integrated, workshop production process quality control model should meet the requirements of 10.4.1 in GB/T 37393-2019, production process quality control system
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 41273-2022_English be delivered?Answer: Upon your order, we will start to translate GB/T 41273-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 41273-2022_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 41273-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|