HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 39139.1-2020 English PDF

US$189.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 39139.1-2020: Shale gas - Environmental protection - Part 1: Pollution prevention and disposal methods for drilling operation
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 39139.1-2020English189 Add to Cart 3 days [Need to translate] Shale gas - Environmental protection - Part 1: Pollution prevention and disposal methods for drilling operation Valid GB/T 39139.1-2020

PDF similar to GB/T 39139.1-2020


Standard similar to GB/T 39139.1-2020

GB/T 9711   SY/T 6996   SY/T 10025   GB/T 29171   GB/T 34533   GB/T 39139.2   

Basic data

Standard ID GB/T 39139.1-2020 (GB/T39139.1-2020)
Description (Translated English) Shale gas - Environmental protection - Part 1: Pollution prevention and disposal methods for drilling operation
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard E12
Classification of International Standard 75.020
Word Count Estimation 10,158
Date of Issue 2020-10-11
Date of Implementation 2021-05-01
Regulation (derived from) National Standard Announcement No. 21 of 2020
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 39139.1-2020: Shale gas - Environmental protection - Part 1: Pollution prevention and disposal methods for drilling operation


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Shale gas - Environmental protection - Part 1.Pollution prevention and disposal methods for drilling operation ICS 75.020 E12 National Standards of People's Republic of China Shale Gas Environmental Protection Part 1.Pollution prevention and disposal methods of drilling operations 2020-10-11 released 2021-05-01 implementation State Administration for Market Regulation Issued by the National Standardization Management Committee

Table of contents

Foreword Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 Source control 1 4.1 Pre-drilling works 1 4.2 Selection of drilling operation mode 2 4.3 Raw material selection 2 5 Process control 2 5.1 Installation and removal 2 5.2 Drilling operations 2 5.3 Logging 3 5.4 Cementing 3 5.5 Logging 3 5.6 Midway test 4 5.7 Other operating requirements 4 6 Waste collection and treatment 4 6.1 Collection and treatment of drilling waste fluid 4 6.2 Water-based drilling cuttings collection and treatment 4 6.3 Collection and treatment of oily drill cuttings 5 6.4 Industrial waste collection and treatment 5 6.5 Collection and treatment of domestic garbage and sewage 5 6.6 Auxiliary equipment 6 7 Completion environmental protection requirements 6

Foreword

GB/T 39139 "Shale Gas Environmental Protection" is planned to be divided into several parts. This part is Part 1 of GB/T 39139. This section was drafted in accordance with the rules given in GB/T 1.1-2009. This part is under the jurisdiction of the National Natural Gas Standardization Technical Committee (SAC/TC244). Drafting organizations of this section. CNPC Chuanqing Drilling Engineering Co., Ltd., CNPC Engineering Technology Research Institute Co., Ltd., Sinopec Shengli Petroleum Engineering Co., Ltd., China Petroleum & Chemical Corporation Petroleum Engineering Technology Research Institute, Shaanxi Yanchang Petroleum (Group) Research Institute of Limited Liability Company, Sichuan Kehong Petroleum and Natural Gas Engineering Co., Ltd. of CNPC Engineering Services Co., Ltd. The main drafters of this section. Liu Shi, Huang Min, He Ji'an, Shu Chang, Wang Xianguang, Li Congjun, Xie Haitao, Xia Ye, Chen Haitao, Li Hui, Xiao Hong, Li Xiang, Xiao Bo, Wan Shuyu, Liu Dongfang, Si Xiaoming, Amway, Jiang Xuebin, Tan Shucheng, Peng Biqiang, Li Shenglin, Lu Yuan, Li Zirui, Dong Zewan, Jing Shuhui. Shale Gas Environmental Protection Part 1.Pollution prevention and disposal methods of drilling operations

1 Scope

This part of GB/T 39139 specifies the source control, process control, waste collection and treatment, and completion environmental protection requirements for shale gas drilling operations. This part is applicable to pollution prevention and disposal of onshore shale gas drilling operations.

2 Normative references

The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this document. For undated references, the latest version (including all amendments) applies to this document. GB/T 5005 Drilling fluid material specification GB 5085.6-2007 Identification Standard for Hazardous Waste Identification of Toxic Substance Content GB 8978 Integrated Wastewater Discharge Standard SY/T 5087 Safety specification for drilling sites in hydrogen sulfide environment SY/T 5466 Technical requirements for pre-drilling engineering and well site layout SY/T 5972 Drilling Rig Basic Selection SY/T 6629 Recommended Practice for Environmental Protection in Onshore Drilling Operations SY/T 6787 Environmental protection technical requirements for water-soluble oilfield chemicals SY/T 7301 Onshore oil and gas exploitation, comprehensive utilization of oily sludge resources and technical requirements for pollution control

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Batch drilling In the same well site, a drilling rig is used to drill the similar intervals of multiple wells in sequence, and then drill the next layer in sequence after cementing.

4 Source control

4.1 Pre-drilling works 4.1.1 Wellsite area 4.1.1.1 The area of the well site and the layout of the work area shall be implemented in accordance with the regulations of SY/T 5466, and the selection of the basic drilling rig shall be implemented in accordance with the regulations of SY/T 5972. 4.1.1.2 Set up the well site and camp in accordance with SY/T 6629 regulations. 4.1.2 Wellsite cleaning and diversion system 4.1.2.1 The foundation of wellsite drilling rigs and supporting equipment should meet.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 39139.1-2020_English be delivered?

Answer: Upon your order, we will start to translate GB/T 39139.1-2020_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 39139.1-2020_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 39139.1-2020_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.