US$599.00 ยท In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 37779-2019: Implementation guidance for energy management system in data centers Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 37779-2019 | English | 599 |
Add to Cart
|
5 days [Need to translate]
|
Implementation guidance for energy management system in data centers
| Valid |
GB/T 37779-2019
|
PDF similar to GB/T 37779-2019
Standard similar to GB/T 37779-2019 GB 37483 GB 37480 GB 37484 GB 19762 GB 17167
Basic data | Standard ID | GB/T 37779-2019 (GB/T37779-2019) | | Description (Translated English) | Implementation guidance for energy management system in data centers | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 30,327 | | Date of Issue | 2019-08-30 | | Date of Implementation | 2020-03-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 37779-2019: Implementation guidance for energy management system in data centers---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Implementation guidance for energy management system in data centers
ICS 27.010
F01
National Standards of People's Republic of China
Data Center Energy Management System Implementation Guide
Published on.2019-08-30
2020-03-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
Introduction IV
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Energy Management System 2
4.1 General 2
4.2 Management responsibilities 2
4.3 Energy Policy 3
4.4 Planning 3
4.5 Implementation and operation 10
4.6 Inspection and Correction 16
4.7 Management Review 16
Appendix A (informative) Data Center Energy Management System Planning Example 17
Appendix B (informative) Data center energy efficiency calculation example 24
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard was proposed by the Department of Resource Conservation and Environmental Protection of the National Development and Reform Commission and the Department of Energy Conservation and Comprehensive Utilization of the Ministry of Industry and Information Technology.
This standard is under the jurisdiction of the National Energy Foundation and Management Standardization Technical Committee (SAC/TC20).
This standard was drafted. China National Institute of Standardization, China Telecom Post and Telecommunications Consulting and Design Institute Co., Ltd., Shanghai Data Port Co., Ltd.
Inspur Electronic Information Industry Co., Ltd., Zhongneng Shensi (Beijing) Energy Saving Technology Co., Ltd., Baidu Online Network Technology (Beijing) Co., Ltd.
Division, China Institute of Metrology, Intel (China) Co., Ltd., Schneider Electric Information Technology (China) Co., Ltd., China Architectural Design
Research Institute Co., Ltd., China Electronic Systems Engineering Second Construction Co., Ltd., Shandong Maigang Data System Co., Ltd., Shandong Province Standardization Research
Research Institute.
The main drafters of this standard. Wang Wei, Li Hongxia, Wang Haifeng, Zhao Jiang, Wang Wei, Peng Yuanbo, Wu Hao, Yi Ming, Li Shuguang, Lao Yimin, Shen Tianhong,
Zhang Baoguo, Xiong Shaodong, Pan Wei, Ma Yibo, Hou Yu.
Introduction
This standard is the implementation guide of GB/T 23331-2012 in the data center, which aims to guide the establishment, implementation, maintenance and implementation of data center specifications.
Improve its energy management system and continuously improve its energy performance. This standard is based on GB/T 29456-2012, according to the data center
The characteristics of planning, construction and operation and maintenance have been highlighted in the process of planning, implementing and inspecting the implementation of the energy management system in the data center.
This standard refers to the energy system of the data center as shown in Figure 1, which mainly includes.
---ICT equipment. equipment used for computing, communication, storage, etc.;
---Air conditioning system. including refrigeration unit, cooling capacity distribution system, etc.;
---ICT equipment power system. including UPS, column head cabinet, etc.;
---Other auxiliary systems. except for ICT equipment, air conditioning systems, ICT equipment power systems, such as power distribution systems, lighting
Systems, monitoring systems, building automation systems, self-contained power supplies, associated renewable energy facilities, cogeneration facilities, etc.
Figure 1 Schematic diagram of the energy system of the data center
Note. Data center energy can include different forms, such as electricity, gas, fuel, external cold and heat sources, etc.; can have different sources, such as from the public grid, number
According to the center's own power supply, external gas pipeline network, municipal water pipe network, auxiliary renewable energy facilities, cold and heat electricity triple supply system, data center construction
Building air conditioning systems, etc.; residual energy can have different output destinations, such as recycling within the system boundary or sending it outside the system boundary
Other users use it. In the case of system residual energy recovery, if the residual energy is utilized within the system boundary, the corresponding input energy amount EIN will
Reduction, the energy efficiency improvement effect is reflected in the reduction of EIN; if the residual energy output is outside the boundary range and is used by other users, the output boundary of the part is
The residual energy outside is called EOUT.
Data Center Energy Management System Implementation Guide
1 Scope
This standard proposes the systematic establishment, implementation, maintenance and improvement of its energy management system in accordance with GB/T 23331-2012.
Guidance recommendations.
This standard applies to all types of fixed data centers, mobile data centers can refer to implementation.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 7119 Water-saving Enterprise Evaluation Guidelines
GB/T 12497 three-phase asynchronous motor economic operation
GB/T 13234 energy consumption calculation method
GB/T 13462 power transformer economic operation
GB/T 15316 Energy Conservation Monitoring Technology General
GB/T 15910 thermal transmission system energy saving monitoring
GB 17167 General rules for the provision and management of energy metering units
GB 19762 Clear water centrifugal pump energy efficiency limit value and energy saving evaluation value
GB/T 23331-2012 Energy Management System Requirements
GB/T 29456-2012 Energy Management System Implementation Guide
GB/T 31347 Energy Measurement and Verification Technology Requirements Communication Room Project
GB 50034 Architectural Lighting Design Standard
GB 50174 Data Center Design Specification
GB 50189 Public building energy-saving design standards
GB 50411 Construction Energy Conservation Engineering Construction Quality Acceptance Specification
GB 50462 Data Center Infrastructure Construction and Acceptance Specifications
GB 50710 Electronic Engineering Energy Saving Design Specification
JR/T 0011 Bank Centralized Data Center Specification
SL604 Water Conservancy Data Center Management Regulations
YD/T 2442 Internet data center resource occupancy, energy efficiency and emission technical requirements and evaluation methods
YD/T 2542 Telecommunications Internet Data Center (IDC) General Technical Requirements
YD/T 2543 Telecom Internet Data Center (IDC) energy consumption assessment method
YD5193 Internet Data Center (IDC) Engineering Design Specification
YD5194 Internet Data Center (IDC) Engineering Acceptance Specification
3 Terms and definitions
The following terms and definitions as defined in GB/T 23331-2012 apply to this document.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 37779-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 37779-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 37779-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 37779-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|