HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 37529-2019 English PDF

US$519.00 ยท In stock
Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 37529-2019: Technical for climatic feasibility demonstration in master planning
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 37529-2019English519 Add to Cart 5 days [Need to translate] Technical for climatic feasibility demonstration in master planning Valid GB/T 37529-2019

PDF similar to GB/T 37529-2019


Standard similar to GB/T 37529-2019

GB/T 37254   GB/T 33673   GB/T 33679   GB/T 37525   GB/T 37523   

Basic data

Standard ID GB/T 37529-2019 (GB/T37529-2019)
Description (Translated English) Technical for climatic feasibility demonstration in master planning
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard A47
Classification of International Standard 07.060
Word Count Estimation 26,279
Date of Issue 2019-06-04
Date of Implementation 2019-06-04
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 37529-2019: Technical for climatic feasibility demonstration in master planning

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical for climatic feasibility demonstration in master planning ICS 07.060 A47 National Standards of People's Republic of China Urban master plan climate feasibility demonstration technology Published on.2019-06-04 Implementation of.2019-06-04 State market supervision and administration China National Standardization Administration issued

Content

Foreword III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Scope of argument 3 5 Demand research and data processing 4 6 Method of Argument 6 7 Content of argument 8 8 Report preparation 9 Appendix A (Normative Appendix) Indicator Calculation Method 10 Appendix B (informative appendix) Report main content example 18 Reference 20

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard was proposed by the China Meteorological Administration. This standard is under the jurisdiction of the National Climate and Climate Change Standardization Technical Committee (SAC/TC540). This standard was drafted. Beijing Meteorological Bureau, China Urban Planning and Design Institute, Hong Kong Chinese University, Xiamen University. The main drafters of this standard. Fang Xiaoyi, Cheng Wei, Du Wupeng, Liu Yonghong, Ren Xiyan, Ren Chao, Liu Yuyu, Dang Bing, Xing Pei, Zhang Shuo, Yang Ruozi, Ma Jingjin. Urban master plan climate feasibility demonstration technology

1 Scope

This standard stipulates the scope of argumentation, demand investigation and data processing, argumentation method, and argumentation of the climate feasibility demonstration of the urban master plan. The requirements for the preparation of the report. This standard is applicable to the urban feasibility planning climate feasibility demonstration in urban and rural planning, regional planning, special planning, and control detailed regulations. The climate feasibility study for urban design can also be used as reference.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article. Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB/T 27963-2011 Evaluation of climate comfort in human settlements QX/T 118-2010 Quality control of surface meteorological observation data

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Master planning Comprehensive deployment and implementation of urban nature, development goals, development scale, land use, spatial layout and various constructions in a given period of time Measures. [GB/T 50280-1998, definition 3.0.10] 3.2 Urban layout urbanlayout The spatial organization of urban land use structure and its form and status. [GB/T 50280-1998, definition 4.4.2] 3.3 Urban land-use Residential land, public facilities land, industrial land, storage land, and general use of diplomacy according to the main nature of land use in cities Land, road plaza land, municipal utility land, green space, special land, water and other land use. [GB/T 50280-1998, definition 4.3.1] 3.4 Climate feasibility argument climaticfeasibilitydemonstration Climate suitability, risk and possible impact on local climate for planning and construction projects that are closely related to climatic conditions Analysis and evaluation activities. 3.5 Wind energy windenergy The kinetic energy of air movement.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 37529-2019_English be delivered?

Answer: Upon your order, we will start to translate GB/T 37529-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 37529-2019_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 37529-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.