Guide for the planning and design of the rural photovoltaic power station cluster connected to power grid
| Valid |
GB/T 36117-2018
|
PDF similar to GB/T 36117-2018
Basic data | Standard ID | GB/T 36117-2018 (GB/T36117-2018) | | Description (Translated English) | Guide for the planning and design of the rural photovoltaic power station cluster connected to power grid | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F12 | | Classification of International Standard | 27.160 | | Word Count Estimation | 10,159 | | Date of Issue | 2018-03-15 | | Date of Implementation | 2018-10-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 36117-2018: Guide for the planning and design of the rural photovoltaic power station cluster connected to power grid ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide for the planning and design of the rural photovoltaic power station cluster connected to power grid
ICS 27.160
F12
National Standards of People's Republic of China
Photovoltaic power station cluster access grid planning
Design Guidelines
Published by.2018-03-15
2018-10-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Administration released
Directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Basic regulations 1
5 Access System Analysis 2
6 Access System Planning 3
Appendix A (informative annex) Photovoltaic power station cluster type diagram 5
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuing agency of this document does not assume responsibility for identifying these patents.
This standard is proposed by the China Electricity Council.
This standard is under the jurisdiction of the National Microgrid and Distributed Power Grid Standardization Technical Committee (SAC/TC564).
This standard was drafted by. China Electric Power Research Institute Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd. Jiaxing Power Supply Company, State Grid Lake
North Electric Power Co., Ltd., State Grid Anhui Power Co., Ltd., Tianjin University, Hefei University of Technology, Nanjing Green Energy Research Institute Limited
the company.
The main drafters of this standard. Sheng Wanxing, Yan Lingfeng, Wu Ming, Liu Haitao, Yu Hui, Ji Yu, Jin Wei, Hou Yiming, Guo Li, Bi Rui, Xu Wei,
Gu Wenbing, Xie Hui, Pan Jing, Chen Feng, Li Dongsen, Song Huizhong, Lu Hao, Wang Liufang, Chen Wei, Li Wei, An Siqing, Xu Bin, Zheng Nan, Hou Xiaogang, Zhang Hao,
Zhao Yuyong, Li Yunbing, Shi Haifeng.
Photovoltaic power station cluster access grid planning
Design Guidelines
1 Scope
This standard stipulates the basic principles for the planning and design of photovoltaic power station cluster access network planning, access system analysis and access system planning.
And other technical requirements.
This standard is applicable to the planning and design of a grid-connected photovoltaic power generation station cluster with a voltage rating of 10 kV and below.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 12325 Power Quality Supply Voltage Deviation
GB/T 12326 power quality voltage fluctuations and flicker
GB/T 14549 Power Quality Public Power Network Harmonic
GB/T 15543 power quality three-phase voltage imbalance
GB/T 24337 Power Quality Harmonics Between Utility Grids
GB/T 29319 Photovoltaic Power Generation System Access Distribution Network Technical Regulations
GB/T 36115 Technical Guidelines for Accurate Poverty Alleviation of Village Photovoltaic Power Plants
GB/T 36116 Functional requirements for cluster control system of photovoltaic power stations in towns and villages
GB/T 36119 Guidelines for the Management and Evaluation of Accurate Poverty Alleviation Village PV Power Plants
DL/T 5729 Technical Guidelines for Planning and Designing Distribution Networks
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Village photovoltaic power station cluster ruralphotovoltaicstationcluster
Geographical proximity, and through the distribution line to a plurality of villages and towns of the same 35kV or 110 (66) kV substation photovoltaic power generation
Station collection.
4 Basic regulations
4.1 The planning of PV power station clusters in villages and towns shall be based on local poverty alleviation plans, and national economic development plans and energy development plans at all levels.
Renewable energy development planning, overall land use planning, environmental protection and local distribution network planning are coordinated.
4.2 The planning of photovoltaic power plant clusters in villages and towns should follow the principle of giving priority to social benefits, giving priority to satisfying the overall benefits of photovoltaic power stations in villages and towns, and
Compare multiple projects.
4.3 The planning and design of photovoltaic power station clusters in villages and towns should proceed from the overall situation and take overall consideration, in accordance with the planning and construction scale, project characteristics, and development plans.
Reasonably determine the access plan with the conditions of the distribution network.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36117-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36117-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 36117-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36117-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|