|
US$279.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 36028.2-2018: Shore-to-ship power supply system technical conditions -- Part 2: Low voltage connection Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 36028.2-2018 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Shore-to-ship power supply system technical conditions -- Part 2: Low voltage connection
| Valid |
GB/T 36028.2-2018
|
Standard similar to GB/T 36028.2-2018 GB/T 36028.1
Basic data | Standard ID | GB/T 36028.2-2018 (GB/T36028.2-2018) | | Description (Translated English) | Shore-to-ship power supply system technical conditions -- Part 2: Low voltage connection | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | R45 | | Classification of International Standard | 03.220.40 | | Word Count Estimation | 14,123 | | Date of Issue | 2018-03-15 | | Date of Implementation | 2018-10-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 36028.2-2018: Shore-to-ship power supply system technical conditions -- Part 2: Low voltage connection ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Shore-to-ship power supply system technical conditions--Part 2. Low voltage connection
ICS 03.220.40
R45
National Standards of People's Republic of China
Technical conditions for shore power systems at ports of entry
Part 2. Low-voltage power supply
Part 2.Lowvoltageconnection
Published by.2018-03-15
2018-10-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Administration released
Directory
Preface III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 Structure 1
5 General requirements 2
6 Technical requirements 3
7 Inspection 4
Appendix A (Informative Appendix) Typical low-voltage power supply control system for shore-based power systems
Appendix B (Informative Appendix) Typical Port Connections
Reference 9
Foreword
GB/T 36028 "Technical conditions for shore-to-shore ship systems" is divided into two parts.
--- Part 1. High-voltage power supply;
---Part 2. Low-voltage power supply.
This part is Part 2 of GB/T 36028.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
This section was proposed by the Ministry of Transport of the People's Republic of China.
This part is under the jurisdiction of the National Port Standardization Technical Committee (SAC/TC530).
This section was drafted by. Ministry of Transport Ministry of Water Transportation.
The main drafters of this section. Yang Rui, Gu Qun, Liu Qingguo, Zhang Wei, Zhu Xi, Liang Ke, Ding Qian, Fan Chuirong, Yang Chengzhi, Zhang Yubo.
Technical conditions for shore power systems at ports of entry
Part 2. Low-voltage power supply
1 Scope
This part of GB/T 36028 stipulates the structure, general requirements, and technical requirements for the low-voltage power supply (low-pressure shipboarding) of the shore power system for ships in Hong Kong.
And inspection.
This section applies to the port low-voltage power supply form of shore-based ship shore power system.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 4208 enclosure protection (IP code)
GB/T 7251.1 Low-voltage switchgear and control equipment Part 1. General
GB/T 11918 (all parts) Industrial plugs and sockets and couplers
GB/T 14549 Power Quality Public Power Network Harmonic
GB/T 16934 energy metering cabinet
GB/T 36028.1 Technical conditions for shore power systems for ships in Hong Kong Part 1. High voltage power supply
GB/T 50065 Grounding Design Specification for AC Electrical Installations
GB 50150 Electrical Equipment Installation Engineering Electrical Equipment Transfer Test Standard
3 Terms and definitions
The terms and definitions defined in GB/T 36028.1 and the following apply to this document.
3.1
Low voltage connection
The ship's shore power system provides power supply methods for vessels that rely on the port for a voltage of no more than AC1000V.
3.2
Power off switch shoreandshipconnectionpoweroff
In the state where the ship's load power supply is interrupted, the switch between shore power and ship power is completed.
4 Structure
4.1 Ship shore power systems include shore power supplies, electrical boxes, connectors, cables and cable reels.
4.2 Radial and trunk power supply should be adopted, and the output should be three-phase three-wire system.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 36028.2-2018_English be delivered?Answer: Upon your order, we will start to translate GB/T 36028.2-2018_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 36028.2-2018_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 36028.2-2018_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|