HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 35729-2017 English PDF

US$199.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 35729-2017: Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 35729-2017English199 Add to Cart 3 days [Need to translate] Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant Valid GB/T 35729-2017

PDF similar to GB/T 35729-2017


Standard similar to GB/T 35729-2017

DL/T 345   DL/T 805.4   DL/T 435   GB/T 35731   GB/T 35721   

Basic data

Standard ID GB/T 35729-2017 (GB/T35729-2017)
Description (Translated English) Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F23
Classification of International Standard 27.100
Word Count Estimation 10,123
Date of Issue 2017-12-29
Date of Implementation 2018-07-01
Regulation (derived from) National Standards Bulletin 2017 No. 32
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 35729-2017: Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Code of practice for maintenance and test of digital electro-hydraulic control system of steam turbine in fossil fuel power plant ICS 27.100 F23 National Standards of People's Republic of China Thermal power plant steam turbine digital electro - hydraulic control system Operation, maintenance and test technical regulations 2017-12-29 Posted 2018-07-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released Directory Preface Ⅰ 1 Scope 1 2 Normative references 1 3 Terms and definitions 1 4 overhaul 2 4.1 Preparation before maintenance 2 4.2 blackout maintenance 2 4.3 after power overhaul 3 5 Test 4 5.1 before starting the static test and technical requirements 4 5.2 start-up phase of dynamic test and technical requirements 5 6 operation and maintenance 7 6.1 Routine Maintenance 7 6.2 regular maintenance and testing 7

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard proposed by the China Electricity Council. This standard by the National Power Station Process Monitoring and Information Standardization Technical Committee (SAC/TC376) centralized. This standard was drafted unit. Zhejiang Datang Usha power generation limited liability company, State Grid Zhejiang Electric Power Company Electric Power Research Institute, Nanjing Section far from Automation Co., Ltd. Zhejiang Zhejiang Wenzhou Power Generation Co., Ltd., Zhejiang Energy Group Co., Ltd., Zhejiang, Zhejiang Wah Energy Co., Ltd., Inner Mongolia Datang International Tuoketuo Power Generation Co., Ltd., Shenhua Zhejiang Guohua Zheneng Power Generation Co., Ltd. The main drafters of this standard.Wang De warehouse, Wang Huiqin, Zhang Bao, Liu Yucheng, Luo Xingyu, Feng Bo, Ding Junhong, Fan Haidong, Yu Gang, Gu Zhenghao, Chen Lei, Bao Jianhan, Cheng Baoqing, Wang Hui. Thermal power plant steam turbine digital electro - hydraulic control system Operation, maintenance and test technical regulations

1 Scope

This standard specifies the thermal power plant steam turbine digital electro-hydraulic control system (DEH) overhaul, test and operation of the content, methods and Technical requirements should be met. This standard applies to thermal power plant in-service units using distributed control system (DCS) consisting of DEH. Other types of steam turbine electricity Hydraulic control system can also refer to the implementation.

2 Normative references

The following documents are indispensable for the application of this document. For dated references, only the dated version applies to this document. For undated references, the latest edition (including all amendments) applies to this document. Thermal power station monitoring system terminology GB/T 30370 thermal power unit primary frequency performance test and acceptance guidelines DL/T 656 Thermal Power Plant Turbine Control System Acceptance Test Procedures Test guideline for steam turbine governing system Thermal power plant thermal industrial automation system maintenance operation and maintenance of technical regulations DL/T 1270 Thermal Power Generation Project Load Rejection Test Guideline 711

3 Terms and definitions

GB/T 26863-2011 defined and the following terms and definitions apply to this document. For ease of use, the following list is repeated GB/T 26863-2011 some of the terms and definitions. 3.1 Unequal speed droop Steam turbine control system static characteristic curve slope. Usually the corresponding empty load and full load speed difference and rated speed ratio Percentage to indicate. [GB/T 26863-2011, Definition 6.29.4.15] 3.2 Primary frequency control primarycontrolofthespeedofgeneratingsets; primaryfrequencycontrol; PFC Each prime mover governor to adjust the speed of each generator, so that the drive torque varies with the system frequency. [GB/T 26863-2011, Definition 6.29.1.5] 3.3 Intake mode conversion FA/PAtransfer According to the operating mode (constant pressure, sliding pressure) and load changes in the request, change the steam turbine control valve opening mode, so that the turbine throttle Section (full steaming) or nozzle adjustment (partial steaming). [GB/T 26863-2011, Definition 6.29.4.12]