|
US$279.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 35699-2017: Specification for power station control system of ship Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 35699-2017 | English | 279 |
Add to Cart
|
3 days [Need to translate]
|
Specification for power station control system of ship
| Valid |
GB/T 35699-2017
|
Standard similar to GB/T 35699-2017 GB/T 11633 GB/T 28561
Basic data | Standard ID | GB/T 35699-2017 (GB/T35699-2017) | | Description (Translated English) | Specification for power station control system of ship | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | U62 | | Classification of International Standard | 47.020.60 | | Word Count Estimation | 14,122 | | Date of Issue | 2017-12-29 | | Date of Implementation | 2018-07-01 | | Regulation (derived from) | National Standards Bulletin 2017 No. 32 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 35699-2017: Specification for power station control system of ship---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification for power station control system of ship
ICS 47.020.60
U62
National Standards of People's Republic of China
Ship power station monitoring system technical conditions
2017-12-29 Posted
2018-07-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard proposed by China Shipbuilding Industry Corporation.
This standard by the National Ship Electrical and Electronic Equipment Standardization Technical Committee (SAC/TC531) centralized.
This standard was drafted by China Shipbuilding Industry Corporation 740th Institute, China Shipbuilding Industry Corporation seventh Institute, on
Hai Zhongke Electric (Group) Co., Ltd., China Ship Power Equipment Co., Ltd.
The main drafters of this standard. Wang Shuofeng, Yang Zi Long, Yin Fei, Luneng Zhong, Li Chong, Dong Qiu Su, Lu Heng.
Ship power station monitoring system technical conditions
1 Scope
This standard specifies the ship power station monitoring system technical requirements, test methods, inspection rules and signs, packaging, storage and so on.
This standard applies to the design, manufacture and testing of steel marine vessel exchange station monitoring system (hereinafter referred to as monitoring system), offshore facilities
Inland river power plant monitoring system can refer to the requirements of this standard.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 191 Packaging - Pictorial signs
GB/T 13306 signs
GB/T 2423.1 Environmental testing for electric and electronic products Part 2. Test methods Test A. Low temperature
GB/T 2423.2 Environmental testing for electric and electronic products Part 2. Test methods Test B. High temperature
GB/T 2423.4 Environmental testing for electric and electronic products Part 2. Test methods Test Db. Alternating hot and humid (12h 12h cycle
ring)
GB/T 2423.10 Environmental testing for electric and electronic products Part 2. Test methods Test Fc. Vibration (sinusoidal)
GB/T 28561 marine electrical equipment album control and measuring instruments
Rules for Classification of Sea-going Steel Ships (China Classification Society,.2015)
3 definitions and terms
The following terms and definitions apply to this document.
3.1
Manual mode manualmode
All control commands are issued manually, the control process by the manual mode.
3.2
Semi-automatic mode semi-automaticmode
Control instructions issued by the artificial control of the process by the control system to set the program to complete the mode.
3.3
Automatic mode automaticmode
Control commands issued by the control system according to the set program, the control process by the control system according to the set program to complete the mode.
3.4
Grid power margin powerreserve
The sum of the rated power of the gensets connected to the grid minus the grid load power.
3.5
Standby crew standbyunit
Already have the start-up conditions, and will start and stop the remote control transferred to the monitoring system control generator.
|