|
US$439.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 35683-2017: Specifications for steam turbines in conventional island of nuclear power plant (PWR) Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 35683-2017 | English | 439 |
Add to Cart
|
4 days [Need to translate]
|
Specifications for steam turbines in conventional island of nuclear power plant (PWR)
| Valid |
GB/T 35683-2017
|
PDF similar to GB/T 35683-2017
Basic data | Standard ID | GB/T 35683-2017 (GB/T35683-2017) | | Description (Translated English) | Specifications for steam turbines in conventional island of nuclear power plant (PWR) | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K54 | | Classification of International Standard | 27.040 | | Word Count Estimation | 22,239 | | Date of Issue | 2017-12-29 | | Date of Implementation | 2018-07-01 | | Regulation (derived from) | National Standards Bulletin 2017 No. 32 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 35683-2017: Specifications for steam turbines in conventional island of nuclear power plant (PWR) ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specifications for steam turbines in conventional island of nuclear power plant (PWR)
ICS 27.040
K54
National Standards of People's Republic of China
Nuclear power plant conventional island (PWR) turbine specification
Specifications forsteamturbinesinconventionalislandof
nuclearpowerplant (PWR)
2017-12-29 Posted
2018-07-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Guaranteed value 2
5 adjustment 3
6 operation and overhaul 4
7 parts 5
8 Foundations and buildings 8
9 to the pump drive 8
Turbine Assist System
11 meter 10
12 Protection System 11
13 vibration 13
14 noise 14
15 Test 14
16 Package Transportation and Installation 15
The design information that should be provided by the buyer 15
18 Supplier should provide design information 17
Steam turbine feed water heat 17
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard proposed by the China Electrical Equipment Industry Association.
This standard by the National Standardization Technical Committee steam turbine (SAC/TC172) centralized.
This standard was drafted unit. Shanghai Power Equipment Design Institute, Dongfang Electric Group Dongfang Turbine Co., Ltd., Harbin Steam Turbine
Machine factory limited liability company, Shanghai Electric Power Equipment Co., Ltd. Shanghai Steam Turbine Factory.
The main drafters of this standard. Li Yujie, Yuan Yongqiang, Yang Xiaohui, Ye Fen, Liang Feng, Cui Jianguo, Gao Hong, Qian Chen Lin.
Nuclear power plant conventional island (PWR) turbine specification
1 Scope
This standard specifies the nuclear power plant conventional island (PWR) turbine equipment warranty value, regulation, operation and maintenance, parts and other requirements.
This standard applies to the rated power of 300MW and above conventional island nuclear power plant (pressurized water reactor) condensing steam turbine. Power is less than 300MW
And non-condensable steam turbine nuclear power can refer to the implementation.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 3785.1 Electroacoustic sound level meter Part 1. Specification
Specification for steam turbines for stationary power generation GB/T 5578-2007
GB/T 6075.1 Mechanical vibration - Measurement on non-rotating parts - Evaluation of machine vibration - Part 1. General
GB/T 6075.2 mechanical vibration measurement on non-rotating parts to evaluate the vibration of the machine Part 2. More than 50MW power,
Rated speed 1500r/min, 1800r/min, 3000r/min, 3600r/min Land-mounted turbines and generators
GB/T 7441 Turbine and driven machinery issued by the measurement of space noise
GB/T 8117.1 Turbine thermal performance acceptance test procedures Part 1. Method A large condensing steam turbine high accuracy
test
GB/T 8117.2 Turbine thermal performance acceptance test procedures Part 2. Method B various types and sizes of turbine wide standard
Correct test
GB/T 11348.1 Rotating machinery - Measurement and assessment of radial vibration of shafts - Part 1. General
GB/T 11348.2 Mechanical vibration measurement on a rotating shaft Evaluation of machine vibration Part 2. Power greater than 50MW, rated
Working speed 1500r/min, 1800r/min, 3000r/min, 3600r/min Land-mounted steam turbine and generator
GB/T 22198 turbine speed control system acceptance test
3 Terms and definitions
GB/T 5578-2007 defined and the following terms and definitions apply to this document.
3.1
Nuclear Power Turbine nuclearpowerturbine
Using the steam generated at the nuclear island as a working fluid, the energy of the steam is converted into a rotary power machine that is a mechanical power.
3.2
The maximum calculation speed maximumcalculatedoverspeed
It is assumed that the speed may occur when the governor fails and the maximum speed is limited only by the overspeed trip device.
3.3
Summer continuous running power summercontinuousrating; SCR
In the provisions of the summer back pressure, the rated new steam parameters, reheat steam parameters and the water supply conditions, does not exceed the specified life,
Continuous power emitted at the generator terminals.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 35683-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 35683-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 35683-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 35683-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|