HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 35150.5-2024 English PDF

US$359.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 35150.5-2024: Technical requirements of dry process cement production complete equipment - Part 5: Dedusting system
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 35150.5-2024English359 Add to Cart 4 days [Need to translate] Technical requirements of dry process cement production complete equipment - Part 5: Dedusting system Valid GB/T 35150.5-2024

Standard similar to GB/T 35150.5-2024

GB/T 35150.6   GB/T 35150.7   GB/T 35150.4   

Basic data

Standard ID GB/T 35150.5-2024 (GB/T35150.5-2024)
Description (Translated English) Technical requirements of dry process cement production complete equipment - Part 5: Dedusting system
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard Q92
Classification of International Standard 91.110
Word Count Estimation 18,182
Date of Issue 2024-11-28
Date of Implementation 2025-06-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 35150.5-2024: Technical requirements of dry process cement production complete equipment - Part 5: Dedusting system


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements of dry process cement production complete equipment - Part 5.Dedusting system Technical requirements for complete equipment for new dry process cement production Part 5.Dust removal systems Technical requirements of dry process cement production complete equipment- Part 5.Dedusting system ICS 91.110 CCS Q 92 National Standard of the People's Republic of China Released on 2024-11-28 2025-06-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface ... Ⅲ Introduction Ⅳ 1 Scope ... 1 2 Normative references ... 1 3 Terms and Definitions 2 4 Classification and composition ... 3 4.1 Classification ... 3 4.2 Composition ... 3 5 Technical requirements ... 3 5.1 General requirements 3 5.2 Performance Requirements 4 5.3 Process dust removal system ... 4 5.4 Single-machine dust removal system ... 6 5.5 Electrical and control equipment ... 6 6 Safety and Environmental Protection ... 6 6.1 Security ... 6 6.2 Environmental Protection 7 7 Installation acceptance and commissioning ... 7 7.1 Installation Acceptance ... 7 7.2 Debugging ... 7 8 Performance Test ... 8 9 Delivery Documents ... 8 Appendix A (Normative) Performance Test Methods ... 9 A.1 Test Boundaries 9 A.2 Test conditions 9 A.3 Test Requirements 9 A.4 Performance Test Content 9 A.5 Data Processing 10

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting is required. This document is part 5 of GB/T 35150 "Technical requirements for complete sets of equipment for the production of new dry process cement". GB/T 35150 has been issued The following parts were published. Part 1.Raw meal preparation systems; - Part 2.Firing system; - Part 3.Cement preparation systems; - Part 4.Cement kiln co-processing systems; Part 5.Dust removal systems; Part 6.Desulfurization system; - Part 7.Denitrification Systems. - Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed by China Building Materials Federation. This document is under the jurisdiction of the National Technical Committee for Standardization of Building Materials and Equipment (SAC/TC 465). This document was drafted by. Tianjin Cement Industry Design and Research Institute Co., Ltd., Tangshan Jidong Equipment Engineering Co., Ltd., Chengdu Lijun Industrial Co., Ltd., Yancheng Institute of Technology, China Building Materials Machinery Industry Association, Yancheng Lanfeng Environmental Engineering Technology Co., Ltd., Huaji Environmental Bao (Wuhan) Co., Ltd., Shanghai Bag Dust Collection Accessories Co., Ltd., Xi'an Longjing Environmental Protection Technology Co., Ltd., Jiehua Holdings Co., Ltd. Co., Ltd., Jiangsu Anda Environmental Protection Technology Co., Ltd. The main drafters of this document are. Peng Mingde, Fan Daorong, Li Zhijun, Liu Baoliang, Yu Haobo, Wang Yumin, Zuo Hongchuan, Zhou Lei, Yang Xiaohong, Wang Jiadong, Wang Daolong, Zhang Baolin, Liu Pingcheng, Jiang Mengjie, Qu Heye, Gu Liding, Zhu Jian, Li Hongbo, Qu Xiaoyan, and Zhang Hong.

Introduction

The new dry process cement production technology is based on the suspension preheating and pre-decomposition technology, which uses the existing technologies in thermal engineering, powder engineering, fluid mechanics, etc. The comprehensive technology of cement production adopts modern scientific theories and technologies, and uses computers and network information technology. The complete set of equipment consists of relatively independent The independent process system equipment mainly includes raw material crushing and homogenization, raw material preparation, fuel preparation, cement kiln co-processing, clinker burning, Cement preparation, dust removal, desulfurization, denitrification, process control, packaging and shipping system equipment. At present, my country's cement equipment and technology have reached the international advanced level, but the complete set of equipment based on system solutions is facing With the expansion of domestic cement equipment exports and engineering general contracting, the systematic support of complete sets of equipment is urgently needed. The demand for standards is also gradually increasing. The purpose of formulating the standards for new dry process cement complete sets of equipment is to improve the user-oriented cement complete sets of equipment standards. The system provides technical support for the high-quality development of the cement industry, better guides the industry to develop in the direction of green, low-carbon, and intelligent manufacturing, and supports Support the export of complete sets of cement equipment in my country. This document is used to remove solid particles from dusty gases during cement production to ensure that the emission standards for atmospheric pollutants are met. The formulation provides technical support for the green, low-carbon and high-quality development of the cement industry, and coordinates with other series of standards. GB/T 35150 is planned to consist of seven parts. Part 1.Raw meal preparation system. The purpose is to standardize the equipment structure of the raw meal preparation system in the new dry process cement production complete equipment. completion, technical requirements, safety and environmental protection requirements, installation acceptance, commissioning and performance testing and delivery documents. Part 2.Firing system. The purpose is to standardize the equipment composition, technology and Requirements, safety and environmental protection requirements, installation acceptance, commissioning and performance testing and delivery documents. Part 3.Cement preparation system. The purpose is to standardize the equipment structure of the cement preparation system in the new dry process cement production complete equipment. completion, technical requirements, safety and environmental protection, installation acceptance and commissioning, performance testing and delivery documents. Part 4.Cement kiln co-processing system. The purpose is to standardize the cement kiln co-processing system in the new dry process cement production equipment. System equipment composition and performance indicators, technical requirements, safety and environmental protection, installation acceptance, commissioning and performance testing and delivery document. Part 5.Dust removal system. The purpose is to standardize the equipment classification, structure and function of the dust removal system in the new dry process cement production equipment. completion, technical requirements, safety and environmental protection, installation acceptance and commissioning, performance testing and delivery documents. Part 6.Desulfurization system. The purpose is to standardize the equipment classification, structure and function of the desulfurization system in the new dry process cement production equipment. completion, technical requirements, safety and environmental protection, installation acceptance and commissioning, performance testing and delivery documents. Part 7.Denitration system. The purpose is to standardize the equipment classification, structure and function of the denitration system in the new dry process cement production equipment. completion, technical requirements, safety and environmental protection, installation acceptance and commissioning, performance testing and delivery documents. Technical requirements for complete equipment for new dry process cement production Part 5.Dust removal systems

1 Scope

This document specifies the classification, composition, technical requirements, safety and environmental protection, installation and maintenance of the dust removal system in the new dry process cement production equipment. Acceptance and commissioning, performance testing and delivery documents. This document applies to the design, manufacture and acceptance of organized emission dust removal systems in new dry process cement production equipment.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies. in this document. GB 2894 Safety signs and their use guidelines GB/T 3797 Electrical control equipment GB 4053.1 Safety requirements for fixed steel ladders and platforms Part 1.Straight steel ladders GB 4053.2 Safety requirements for fixed steel ladders and platforms Part 2.Steel inclined ladders GB 4053.3 Safety requirements for fixed steel ladders and platforms Part 3.Industrial guardrails and steel platforms GB 4915 Emission standard of air pollutants for cement industry GB/T 5226.1 Electrical safety of machinery Electrical equipment of machinery Part 1.General technical requirements GB/T 6719-2009 Technical requirements for bag filters GB/T 6995.2 Wire and cable identification marking method Part 2.Standard colors GB/T 7251.1 Low voltage switchgear and controlgear Part 1.General GB/T 7932 General rules and safety requirements for pneumatic systems and their components GB/T 8196 Mechanical safety guards - General requirements for the design and manufacture of fixed and movable guards GB/T 10596 Scraper conveyor GB/T 11022 Common technical requirements for high voltage AC switchgear and controlgear standards GB/T 12777 General technical requirements for metal bellows expansion joints GB/T 15605 Dust Explosion Pressure Venting Guide GB/T 16754 Design principles for mechanical safety emergency stop function GB/T 16758 Classification and technical requirements of exhaust hoods GB/T 17248.3 Acoustics Noise emitted by machines and equipment measured at working position and other specified positions using approximate environmental correction The emission sound pressure level GB/T 17919 Explosion-proof Guidelines for Dust Collectors Used in Dust Explosion Hazardous Locations GB 18613-2020 Energy efficiency limit values and energy efficiency grades for electric motors GB/T 18831 Design and selection principles for interlocking devices related to mechanical safety and protective devices GB/T 19670 Safety of machinery - Prevention of unexpected start-up GB 19761-2020 Energy efficiency limit values and energy efficiency grades for ventilators GB/T 25295 Guidelines for safety design of electrical equipment GB/T 27977 Cement production electrical energy efficiency test and calculation method

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 35150.5-2024_English be delivered?

Answer: Upon your order, we will start to translate GB/T 35150.5-2024_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 35150.5-2024_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 35150.5-2024_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.