US$239.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34932-2017: Technical specification for remote monitoring and control system of distributed photovoltaic power generation system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 34932-2017 | English | 239 |
Add to Cart
|
3 days [Need to translate]
|
Technical specification for remote monitoring and control system of distributed photovoltaic power generation system
| Valid |
GB/T 34932-2017
|
PDF similar to GB/T 34932-2017
Basic data | Standard ID | GB/T 34932-2017 (GB/T34932-2017) | | Description (Translated English) | Technical specification for remote monitoring and control system of distributed photovoltaic power generation system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F12 | | Classification of International Standard | 27.160 | | Word Count Estimation | 12,160 | | Date of Issue | 2017-11-01 | | Date of Implementation | 2018-05-01 | | Regulation (derived from) | National Standard Announcement 2017 No. 29 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 34932-2017: Technical specification for remote monitoring and control system of distributed photovoltaic power generation system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for remote monitoring and control system of distributed photovoltaic power generation system
ICS 27.160
F12
National Standards of People's Republic of China
Distributed Photovoltaic Power Generation System Remote Monitoring Technical Specifications
Posted.2017-11-01
2018-05-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 General 2
5 system architecture and configuration 2
6 master function 3
7 sub-station requirements 6
8 Communication 6
9 master performance 7
10 sub-station performance 8
11 main site environmental conditions 8
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of this document may be patentable. The issuing agencies of this document do not bear the responsibility of identifying these patents.
This standard proposed by the China Electricity Council and centralized.
This standard was drafted unit. China Electric Power Research Institute, State Grid Jiangsu Electric Power Company Electric Power Research Institute, State Grid Zhejiang Electric Power
Division of Electric Power Research Institute.
The main drafters of this standard. Zhou Wei, He Weiguo, Zhang Xiangwen, Chen Mei, Ding Jie, Yuan Xiaodong, Wang Chun, Yao Hongchun, Hua Guanghui, Zhao Dawei,
Program, Zhao Bo, Zhang Xuesong, Chen Ran, Qiu Tengfei, Liu Hai Xuan, Liang Shuo.
Distributed Photovoltaic Power Generation System Remote Monitoring Technical Specifications
1 Scope
This standard specifies the structure and configuration of remote monitoring of distributed photovoltaic power generation system, the main station functions, substation requirements, communications, master performance,
Substation performance and the main site environmental conditions and other technical requirements.
This standard applies to the grid through the voltage level of 35kV and below the new construction, reconstruction and expansion of distributed photovoltaic power generation system remote
monitor.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2887 General rules of computer space
GB/T 13729 Telecontrol terminal equipment
GB/T 19964 photovoltaic power station access to power systems technical requirements
GB/T 29319 photovoltaic power generation system access distribution network technical requirements
GB 50174 Electronic Information System Design Specification for Computer Room
DL/T 634.5101 Telecontrol equipment and systems Part 5-101. Transmission protocols Basic Telecontrol tasks Supporting standards
DL/T 634.5104 Telecontrol equipment and systems - Part 5-104. Transmission protocols IEC 60870-
5-101 Network Access
DL/T 860 Substation Communication Network and System
DL/T 5136 thermal power plants, substations secondary wiring design technical specifications
3 Terms and definitions
The following terms and definitions apply to this document.
3.1
Photovoltaic Power System photovoltaic (PV) powergenerationsystem
The use of photovoltaic solar photovoltaic effect, the solar radiation can be converted directly into electricity generating system.
3.2
Public connection point pointofcommoncoupling; PCC
Connection of more than one user in a power system.
3.3
Pointofinterconnection
For a photovoltaic power generation system booster station, refers to the booster station high-pressure side bus or node. For non-booster station photovoltaic power generation system, refers to the light
Volt generation system output summary point.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34932-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34932-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 34932-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34932-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|