|
US$439.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34630.4-2017: Friction stir welding -- Aluminium and its alloys -- Part 4: Specification and qualification of welding procedures Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 34630.4-2017 | English | 439 |
Add to Cart
|
5 days [Need to translate]
|
Friction stir welding -- Aluminium and its alloys -- Part 4: Specification and qualification of welding procedures
| Valid |
GB/T 34630.4-2017
|
PDF similar to GB/T 34630.4-2017
Basic data | Standard ID | GB/T 34630.4-2017 (GB/T34630.4-2017) | | Description (Translated English) | Friction stir welding -- Aluminium and its alloys -- Part 4: Specification and qualification of welding procedures | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | J33 | | Classification of International Standard | 25.160.10 | | Word Count Estimation | 22,266 | | Date of Issue | 2017-09-29 | | Date of Implementation | 2018-04-01 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 34630.4-2017: Friction stir welding -- Aluminium and its alloys -- Part 4: Specification and qualification of welding procedures ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Friction stir welding-Aluminum and its alloys-Part 4. Specification and qualification of welding procedures
ICS 25.160.10
J33
National Standards of People's Republic of China
Friction stir welding aluminum and aluminum alloy
Part 4. Welding procedure specification and assessment
Part 4.Specificationandqualificationofweldingprocedures
(ISO 25239-4.2011, Frictionstirwelding-Aluminum-
Part 4. Specification and qualification of welding procedures, MOD)
2017-09-29 Posted
2018-04-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Foreword Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions 2
4 Preparation of pre-welding procedure 2
5 welding process assessment 3
6 Process evaluation based on pre-production welding test 11
Appendix A (informative) Pre-welding process (pWPS) 12
Appendix B (Informative) Nondestructive testing 13
Appendix C (Informative) Swing weld lap s-bend test 14
Appendix D (Informative) Welding procedure qualification report format
Foreword
GB/T 34630 "friction stir welding aluminum and aluminum" is divided into five parts.
--- Part 1. Terms and definitions;
--- Part 2. Welding joint design;
--- Part 3. Welding operators skills assessment;
--- Part 4. Welding procedure procedures and assessment;
--- Part 5. Quality and inspection requirements.
This section GB/T 34630 Part 4.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This section uses the redrafted Law Amendment uses ISO 25239-4.2011 "Friction stir welding aluminum Part 4. Welding procedures and procedures and
Assessment "(English version).
This part of ISO 25239-4.2011 and the main technical differences and the reasons are as follows.
--- On the normative references, this section made a technical difference with the adjustment to adapt to China's technical conditions, adjust the situation
Concentration reflected in the second chapter "Normative references", the specific adjustments are as follows.
● The international standard quoted in ISO 25239-4.2011 should be replaced by the corresponding standard in our country.
● increase the reference GB/T 3375, GB/T 34630.3-2017;
● Removed ISO 857-1, ISO 3134, ISO /T R17671-1.
--- According to the preparation of our standard delete the second chapter of ISO 25239-4.2011;
--- According to China's standard preparation requirements 5.2pWPS ISO 25239-4.2011 technical content expressed in the form of an item.
This section also made the following editorial changes.
--- The standard name was changed to "friction stir welding aluminum and aluminum alloy Part 4. Welding procedures and assessment";
--- Removed the international standard reference.
This part of the National Welding Standardization Technical Committee (SAC/TC55) and focal point.
This part of the drafting unit. Shanghai Aerospace Equipment Manufacturing Plant, the car in Qingdao Sifang Locomotive Co., Ltd., Institute of Mechanical Science
Harbin Welding Institute.
The drafters of this section. Feng Xiaodong, Zhao Huihui, Zhang Tiehao, Guo Li Jie, Xiong Yan Yan, Gao Jia Shuang, Xu Kui, Chun-Bo Zhang.
Friction stir welding aluminum and aluminum alloy
Part 4. Welding procedure specification and assessment
1 Scope
GB/T 34630 provisions of this part of the aluminum and aluminum alloy friction stir welding pre-welding procedures, welding process qualification test
Type, welding, testing and testing, approved range.
This section applies to aluminum and aluminum alloy friction stir welding.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2651 Tensile test method for welded joints (GB/T 2651-2008, ISO 4136.2001, IDT)
GB/T 2653 bending test method for welded joints (GB/T 2653-2008, ISO 5173.2000, IDT)
GB/T 3190 Deformed aluminum and aluminum alloy chemical composition (GB/T 3190-2008, ISO 209.2007, MOD)
GB/T 3375 welding terminology
GB/T 6417.1 metal fusion welding head defects classification and description (GB/T 6417.1-2005, ISO 6520-1.1998, IDT)
GB/T 16475 deformation of aluminum and aluminum alloy code (GB/T 16475-2008, ISO 2107.2007, MOD)
GB/T 18591 welding preheat temperature, temperature and preheating temperature measurement guide (GB/T 18591-2001,
ISO 13916.1996, IDT)
GB/T 19866 welding procedures and the general principles of assessment (GB/T 19866-2005, ISO 15607.2003, IDT)
GB/T 19868.4 Process evaluation based on pre-production welding test (GB/T 19868.4-2005, ISO 15613.2004, IDT)
GB/T 19869.2 aluminum and aluminum alloy welding process qualification test (GB/T 19869.2-2012, ISO 15614-2, MOD)
GB/T 22087 Aluminum and aluminum alloy arc welding imperfections quality grading guidelines (GB/T 22087-2008, ISO 10042.
2005, IDT)
Metallic materials - Weld destructive tests - Weld macro and micro test (GB/T 26955-2011, ISO 17639).
2003 (E), MOD)
GB/T 27551 Metallic materials weld fracture test fracture (GB/T 27551-2011, ISO 9017.2001, IDT)
GB/T 32259 Weld non-destructive testing Weld joint visual inspection (GB/T 32259-2015, ISO 17637.2003, MOD)
GB/T 34630.1 friction stir welding aluminum and aluminum alloy - Part 1. Terms and definitions (GB/T 34630.1-2017,
ISO 25239-1.2011, MOD)
Friction stir welding aluminum and aluminum alloys - Part 3. Skill assessment of welding operators
(GB/T 34630.3-2017, ISO 25239-3.2011, MOD)
GB/T 34630.5-2017 Friction stir welding aluminum and aluminum alloys - Part 5. Quality and inspection requirements (GB/T 34630.5-
2017, ISO 25239-5.2011, MOD)
ISO 14175 Welding consumables and related processes for welding gas and gas mixtures (Weldingconsumables-Gasesandgas
mixturesforfusionweldingandaliedprocesses)
ISO 80000-1-2009 Quantities and units Part 1. General rules (Quantitiesandunits-Part 1.General)
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34630.4-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34630.4-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 34630.4-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34630.4-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|