|
US$499.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 34576-2017: Specifications for steam turbine used in gas-steam combined-cycle unit Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 34576-2017 | English | 499 |
Add to Cart
|
4 days [Need to translate]
|
Specifications for steam turbine used in gas-steam combined-cycle unit
| Valid |
GB/T 34576-2017
|
PDF similar to GB/T 34576-2017
Basic data | Standard ID | GB/T 34576-2017 (GB/T34576-2017) | | Description (Translated English) | Specifications for steam turbine used in gas-steam combined-cycle unit | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K54 | | Classification of International Standard | 27.040 | | Word Count Estimation | 25,231 | | Date of Issue | 2017-09-29 | | Date of Implementation | 2018-04-01 | | Quoted Standard | GB/T 5578-2007; GB/T 6075.1; GB/T 6075.2; GB/T 6075.3; GB/T 11348.1; GB/T 11348.2; JB/T 9629; IEC 61672-1; IEC 61672-2; IEC 61672-3; ASME PTC 6.2 | | Regulation (derived from) | National Standard Notice 2017 No. 23 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the gas - steam combined cycle steam turbine terms and definitions, guaranteed value, regulation, operation and maintenance, parts and other requirements. This standard applies to gas - steam combined cycle steam turbine. |
GB/T 34576-2017: Specifications for steam turbine used in gas-steam combined-cycle unit---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specifications for steam turbine used in gas-steam combined-cycle unit
ICS 27.040
K54
National Standards of People's Republic of China
Specification for gas - steam combined cycle steam turbines
2017-09-29 Posted
2018-04-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
China National Standardization Administration released
Directory
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Guaranteed value 3
5 adjustment 4
6 operation and overhaul 6
7 parts 8
8 Foundation and building 9
9 Feed pump drive 10
Steam Turbine Assist System
11 meter 11
12 Protection System 13
13 vibration 14
14 noise 15
15 Tests 16
Delivery and Installation 16
The design information that should be provided by the buyer 16
18 Supplier should provide design information 19
Turbine water heating 19
Appendix A (Normative) Electronic Regulator 20
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard proposed by the China Electrical Equipment Industry Association.
This standard by the National Standardization Technical Committee steam turbine (SAC/TC172) centralized.
This standard was drafted unit. Shanghai Power Equipment Design Institute, Shanghai Electric Power Equipment Co., Ltd. Shanghai Steam Turbine Works, the East
Electric Group Dongfang Turbine Co., Ltd., Harbin Turbine Factory Co., Ltd., Nanjing Turbine and Electric (Group) Co., Ltd.,
Beijing North heavy steam turbine limited liability company.
The main drafters of this standard. Zhang Lijian, Ye Fen, Ye Dongping, Tang Li, Jin Junzhong, Zhuang Hui, Zhou Xin Kang, Peng Yunhong, Li Yang, Zhang Zhihua,
Fang Chonghua, Chi Kok, Yu Jintao, Chu Dechun.
Specification for gas - steam combined cycle steam turbines
1 Scope
This standard specifies the gas - steam combined cycle steam turbine terms and definitions, guaranteed value, regulation, operation and maintenance, parts and other requirements.
This standard applies to gas - steam combined cycle steam turbine.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version applies to this article
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
Specification for steam turbines for stationary power generation GB/T 5578-2007
GB/T 6075.1 Mechanical vibration - Measurement on non-rotating parts - Evaluation of machine vibration - Part 1. General
GB/T 6075.2 mechanical vibration measurement on non-rotating parts to evaluate the vibration of the machine Part 2. 50MW above, rated
Speed 1500r/min, 1800r/min, 3000r/min, 3600r/min Land-mounted turbines and generators
GB/T 6075.3 mechanical vibration measurement on non-rotating parts to evaluate the vibration of the machine Part 3. Rated power greater than 15kW
Industrial machines measuring on-site at rated speeds between 120r/min and 15000r/min
GB/T 11348.1 Rotating machinery - Measurement and assessment of radial vibration of shafts - Part 1. General
GB/T 11348.2 Mechanical vibration measurement on a rotating shaft Evaluation of machine vibration Part 2. Power greater than 50MW, rated
Working speed 1500r/min, 1800r/min, 3000r/min, 3600r/min Land-mounted steam turbine and generator
JB/T 9629 Turbine pressure parts hydraulic test technical conditions
IEC 61672 (all parts) Electroacoustics-Soundlevelmeters
ASMEPTC6.2 combined cycle steam turbine performance test procedures (SteamTurbinesinCombinedCycles)
3 Terms and definitions
GB/T 5578-2007 defined and the following terms and definitions apply to this document. For ease of use, the following list is repeated
GB/T 5578-2007 some of the terms and definitions.
3.1
Mixed-pressure turbines
Different pressure steam into the steam turbine work of the same turbine.
Note. Most of the combined cycle turbines are turbocharged turbines, usually with double-pressure combined cycle turbines and multi-pressure combined cycle turbines. Double pressure means more than
The heat boiler will produce two different pressure steam into the same steam turbine work. Three pressure type refers to the waste heat boiler will produce three different pressure steam into the same
First steam turbine work. Multi-press and so on.
[GB/T 5578-2007, Definition 3.1.5]
3.2
NCB Turbine "NCB" turbine
According to the needs of users can be pure condensate (abbreviated as "N"), extraction (abbreviated as "C") or back pressure (abbreviation "B"), etc.
Turbine with operating mode switchover.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 34576-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 34576-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 34576-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 34576-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|