HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 34193-2017 English PDF

US$279.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 34193-2017: Guides for energy efficiency assessment of blast furnace process
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 34193-2017English279 Add to Cart 3 days [Need to translate] Guides for energy efficiency assessment of blast furnace process Valid GB/T 34193-2017

PDF similar to GB/T 34193-2017


Standard similar to GB/T 34193-2017

GB/T 36023   GB/T 36025   GB/T 33785   GB/T 34192   GB/T 34191   

Basic data

Standard ID GB/T 34193-2017 (GB/T34193-2017)
Description (Translated English) Guides for energy efficiency assessment of blast furnace process
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard H04
Classification of International Standard 77.080
Word Count Estimation 14,150
Date of Issue 2017-09-07
Date of Implementation 2018-06-01
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 34193-2017: Guides for energy efficiency assessment of blast furnace process

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guides for energy efficiency assessment of blast furnace process ICS 77.080 H04 National Standards of People's Republic of China Blast furnace process energy efficiency assessment guidelines 2017-09-07 Posted 2018-06-01 implementation General Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China China National Standardization Administration released

Foreword

This standard was drafted in accordance with the rules given in GB/T 1.1-2009. This standard is proposed by China Iron and Steel Association. This standard by the National Standardization Technical Committee Steel (SAC/TC183) centralized. This standard was drafted unit. Southern Metallurgical Engineering Technology Co., Ltd., Metallurgical Industry Information Standards Institute, Baoshan Iron and Steel Co., Ltd., Wuhan Iron and Steel Co., Ltd., Hunan Hualing Xiangtan Iron and Steel Co., Ltd., Iron and Steel Research Institute. The main drafters of this standard. Pan Guoyou, Li Juyan, Wang Jiangwei, Qiu Jinhui, Guilin, Raytheon, He Feng, Xiu Xiuping, Ye Lide, Fan Xiaogang, Qin Ying, Zhao Hui, Yan Chaofu, Liu Meng, Xu Hailun, Xiong Jia. Blast furnace process energy efficiency assessment guidelines

1 Scope

This standard specifies the blast furnace process energy efficiency assessment terms and definitions, basic principles, assessment steps, boundaries and energy consumption statistics, the benchmark energy Consumption, actual energy consumption, energy efficiency index, energy efficiency analysis and energy efficiency optimization measures. This standard applies to blast furnaces in steel enterprises energy efficiency assessment and energy saving potential analysis.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version applies to this article Pieces. For undated references, the latest edition (including all amendments) applies to this document. GB 17167 energy-using units of energy measurement equipment and management of general rules GB/T 21368 Iron and steel enterprises energy measurement equipment and management requirements GB/T 23331 energy management system requirements GB/T 28924 steel enterprise energy efficiency index calculation guide

3 Terms and definitions

GB/T 23331, GB/T 28924 and defined by the following terms and definitions apply to this document. 3.1 Modified baseline energy consumption modifiedbenchmarkofenergyconsumption Taking into account the actual objective situation of the assessment object, the benchmark energy consumption per unit of product after the revision of the benchmark energy consumption.

4 basic principles

Energy efficiency evaluation of blast furnace process should follow the following basic principles. a) The principle of lawful compliance The object of assessment should be consistent with national laws and regulations, in line with the requirements of the steel industry policy, in line with the relevant energy-saving emission reduction Standard requirements b) The principle of efficient use of energy to promote the efficient use of energy and rational allocation, encourage enterprises to adopt advanced energy-saving technologies or management measures, Improve low-energy production links; c) highlight the key principles should focus on inspection of key energy consumption and energy-saving potential of key processes and equipment, focusing on the analysis of energy efficiency major factor; d) The principle of scientific and reasonable should be within the conditions permit, excluding the impact of incomparable factors to ensure the comparability of assessment indicators and evaluation The rationality of price analysis.

5 evaluation steps

Blast furnace process energy efficiency assessment should include but not limited to the following steps. a) determine the boundaries and energy consumption statistics;

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 34193-2017_English be delivered?

Answer: Upon your order, we will start to translate GB/T 34193-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 34193-2017_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 34193-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.