US$299.00 ยท In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 33656-2017: Drawing method of energy measuring network diagram for enterprises Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 33656-2017 | English | 299 |
Add to Cart
|
4 days [Need to translate]
|
Drawing method of energy measuring network diagram for enterprises
| Valid |
GB/T 33656-2017
|
PDF similar to GB/T 33656-2017
Standard similar to GB/T 33656-2017 GB/T 33861 GB/T 33873 GB/T 33650
Basic data Standard ID | GB/T 33656-2017 (GB/T33656-2017) | Description (Translated English) | Drawing method of energy measuring network diagram for enterprises | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | F01 | Classification of International Standard | 27.010 | Word Count Estimation | 15,162 | Date of Issue | 2017-05-12 | Date of Implementation | 2017-12-01 | Quoted Standard | GB/T 14689; GB/T 14691; GB 17167; GB/T 17450 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the principles and methods of the enterprise energy measurement network diagram, and gives the drawing style. This standard applies to the enterprise energy measurement network map drawing, other energy units of energy measurement network map drawing can refer to use. |
GB/T 33656-2017: Drawing method of energy measuring network diagram for enterprises---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Drawing method of energy measuring network diagram for enterprises
ICS 27.010
F01
National Standards of People's Republic of China
Method of Enterprise Energy Metering Network Drawing
2017-05-12 released
2017-12-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface III
1 Scope 1
2 normative reference document 1
3 Terms and definitions 1
4 Overview 1
The principle of drawing the energy metering network diagram
Method of Drawing Energy Energy Network
7 Information Annotation 2
Appendix A (informative) Energy Metering Network Figure 3
Appendix B (informative) Energy category code 12
Foreword
This standard is drafted in accordance with the rules given in GB/T 1.1-2009.
This standard is proposed by the National Standardization Committee for Metrology and Management (SAC/TC525).
The main drafting of this standard. Ningbo Institute of Measurement and Testing, Zhejiang Institute of Metrology, Fujian Institute of Metrology.
The main drafters of this standard. Li Zhang superscript, Qian Hao, Wang Huizhong, Zhan Zhijie, Xiao Hong, Tang Si Meng.
Method of Enterprise Energy Metering Network Drawing
1 Scope
This standard specifies the principles and methods of drawing the enterprise energy measurement network, and gives the drawing style.
This standard applies to the enterprise energy measurement network map drawing, other energy use unit energy measurement network drawing drawing can refer to use.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 14689 Technical drawings Drawing format and format
GB/T 14691 technical drawing fonts
General rules for the preparation and management of energy - carrying units
GB/T 17450 Technical drawings
3 terms and definitions
GB 17167 Definitions and the following terms and definitions apply to this document.
3.1
Energy metering point energymeasuringpoint
The location of the energy metering device.
3.2
Energy unit energyusingunit
Subordinate energy units under the basic production system, refers to the device, system, process, section, centralized management of similar energy equipment.
3.3
Energy flow flowdirectionofenergy
The direction of the actual flow of energy.
4 Overview
4.1 Energy metering network diagram is a combination of energy flow and energy measurement point of the network map.
4.2 energy measurement network diagram from the graphics and forms of two parts. Graphic drawing energy measuring instruments, measuring objects, energy flow, level and
External input (or internal output) and the use of energy units of the boundaries; table, including energy measurement points and the corresponding measurement of the relevant information.
4.3 Energy measurement network diagram should be consistent with the actual situation of enterprises, and should be based on the actual use of enterprise measurement equipment changes in a timely manner.
5 The principle of drawing the energy metering network diagram
5.1 energy measurement network diagram, the size of the format should be consistent with the provisions of GB/T 14689, the font should be consistent with the provisions of GB/T 14691, Figure
The line shall comply with the provisions of GB/T 17450.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 33656-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 33656-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 33656-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 33656-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|