US$659.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 33537.3-2017: Industrial communication networks -- Fieldbus specifications -- Type 23: CC-Link IE specification -- Part 3: CC-Link IE communication profile Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 33537.3-2017 | English | 659 |
Add to Cart
|
5 days [Need to translate]
|
Industrial communication networks -- Fieldbus specifications -- Type 23: CC-Link IE specification -- Part 3: CC-Link IE communication profile
| Valid |
GB/T 33537.3-2017
|
PDF similar to GB/T 33537.3-2017
Basic data Standard ID | GB/T 33537.3-2017 (GB/T33537.3-2017) | Description (Translated English) | Industrial communication networks -- Fieldbus specifications -- Type 23: CC-Link IE specification -- Part 3: CC-Link IE communication profile | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N10 | Classification of International Standard | 25.040 | Word Count Estimation | 33,381 | Date of Issue | 2017-02-28 | Date of Implementation | 2017-09-01 | Quoted Standard | GB/T 15629.3-2014; GB/T 33537.1-2017; GB/T 33537.2-2017; ISO/IEC 2382-16-1996; IEC 61158-6-10-2014; IEC 61784-1-2014; IEC 61784-5-8-2013; IEEE 802-2001; IEEE 802.1AB; IEEE 802.1AS-2011; IEEE 802.1D-2004; IEEE 802.1Q-2011; IEEE 802.3-2008; IETF RFC 768; IE | Adopted Standard | IEC 61784-2-2014, MOD | Regulation (derived from) | National Standard Announcement No. 4 of 2017 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies: - supports performance specifications for real-time Ethernet (RTE) requirements classification; - regulations and related network components based on ISO/IEC 15168-1-2014, IEC 61158 series and IEC 61784-1-2014; Application of Parallel Operation RTE Based on GB/T 15629.3-2014. These communication profiles are called real-time Ethernet (RTE) communication profiles. |
GB/T 33537.3-2017: Industrial communication networks -- Fieldbus specifications -- Type 23: CC-Link IE specification -- Part 3: CC-Link IE communication profile ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Industrialbus networks - Fieldbus specifications - Type 23. CC-Link IE protocol - Part 3. CC-Link IE communication profile
ICS 25.040
N10
National Standards of People's Republic of China
Industrial Communication Network Fieldbus Specification
Type 23. CC-LinkIE specification
Part 3. CC-LinkIE communication profiles
CC-LinkIEspecification-Part 3. CC-LinkIEcommunicationprofile
(IEC 61784-2..2014, Industrialcommunicationnetworks-Profiles-Part 2.
ISO /IEC 8802-3, MOD)
2017-02-28 release.2017-09-01 implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface III
Introduction IV
1 Scope 1
2 normative reference document 1
3 Terms and Definitions, Abbreviations, Conventions 2
3.1 Terms and definitions 2
3.2 Abbreviations 5
3.3 Conventions 7
3.3.1 Common convention for each layer 7
3.3.2 Physical layer 9
3.3.3 Data link layer 9
3.3.4 Application Layer 9
Consistency of communication rules
5 RTE performance index 10
5.1 Basic Principles of Performance Indicators 10
5.2 Application requirements 11
5.3 Performance indicators 11
5.3.1 Delivery time 11
5.3.2 Number of RTE terminal stations 11
5.3.3 Basic network topology 12
5.3.4 Number of switches between RTE terminal stations 12
5.3.5 RTE Throughput 12
5.3.6 non-RTE bandwidth 12
5.3.7 Time synchronization accuracy 12
5.3.8 Non-time-based synchronization accuracy 12
5.3.9 Redundancy recovery time 12
6 Conformance Test 12
6.1 Concept 12
6.2 Method 13
6.3 Test conditions and test cases 13
6.4 Test procedures and measurements 14
6.5 Test Report 14
7 Communication Line 8 (CC-Link) RTE Communication Profile 14
7.1 Overview 14
7.2 Regulation 8/4 15
7.3 Regulation 8/5 21
Reference 29
Foreword
GB/T 33537 "Industrial Communication Network Fieldbus Specification Type 23. CC-LinkIE Specification" is divided into the following three parts.
Part 1. Application layer service definition;
Part 2. Application layer protocol specification;
Part 3. CC-LinkIE Communication Profile.
This part is Part 3 of GB/T 33537.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
This part uses the re-drafting method to modify IEC 61784-2..2014 "Industrial Communication Network Regulations Part 2. Based on
ISO /IEC 8802-3 real-time network attached field bus profile ".
The technical differences between this section and IEC 61784-2..2014 are as follows.
--- on the normative reference documents, this part has made a technical differences in the adjustment to meet China's technical conditions, adjust the situation
The situation is reflected in Chapter 2, "Normative references", as follows.
● Delete files that are not referenced in this section in Chapter 2, "Normative references";
Replace ISO /IEC 8802-3..2000 with GB/T 15629.3-2014 with international standard modification;
--- delete the "3.1 terms and definitions" in this part of the definition of the term is not used, and marked "CC-LinkIE not used, but keep the
Number "to correspond to IEC 61784-2..2014 terms;
--- remove the "3.3 symbol", Chapter 7 to Chapter 19, Appendix A, only to retain the CC-LinkIE communication profile related content, Chapter 20 for
For the seventh chapter, after the chapter number to change.
This section makes the following editorial changes.
--- In line with existing standard series, change the standard name to "Industrial Communication Network Fieldbus Specification Type 23. CC-Link
IE Specification Part 3. CC-LinkIE Communication Profile ".
This part is made by the China Machinery Industry Federation.
This part is headed by the National Industrial Process Measurement Control and Automation Standardization Technical Committee (SAC/TC124).
This part of the drafting unit. Machinery Industry Instrument Integrated Technology and Economic Research Institute, Dongfeng Design and Research Institute Co., Ltd., Shanghai Automation
Instrument Co., Ltd., Tianhua Chemical Machinery and Automation Research and Design Institute, Tianjin University, Tsinghua University, Southwest University, Beijing and Lee when the system workers
Ltd., Beijing Austin Technology Co., Ltd., Mitsubishi Electric, China CC-Link user organizations.
This part of the main drafters. Ding Lu, Wang Shuo, Wang Chunxi, You Heping, Bao Weihua, Lu Mei, Jiang Jin lock, Dong Feng, Wang Jinbiao, Liu Feng,
Chen Xiaofeng, Shi Xiaonan, Zhang Rong, Gan Shuang.
Introduction
This section provides additional communication profiles (CPs) for existing CC-Link communication profiles (CPF). These regulations are in line with industrial automation
(Real-Time Ethernet, RTE) communication network with GB/T 15629.3 (commonly referred to as Ethernet)
Save These RTE communication networks use the provisions of GB/T 15629.3 for the bottom of the communication stack and provide more predictable, reliable real-time
Data transmission and support the precise synchronization of automated equipment.
In particular, these profiles help to correctly state the consistency of the RTE communication network with GB/T 15629.3 and help to avoid
Is now deviated from the original intention to achieve.
Application of Ethernet technology to industrial communication between controllers, and even communication between controllers and field devices,
Network technology in the field area of use. If this availability results in the following characteristics of the industrial automation communication network in the field area
Loss is unacceptable, these features include.
---real-time;
- a synchronized action between a field device (for example, a drive);
--- very small data records of the effective, frequent exchange.
These new RTE profiles can take full advantage of the Ethernet network in terms of transmission bandwidth and network improvements.
Another implicit and important requirement is to completely preserve the typical communication capabilities of Ethernet (as used in the office)
Continue to use the software involved.
The market requires a variety of network solutions, each with different performance characteristics and functional capabilities to meet a variety of application requirements.
RTE performance metrics (see Chapter 5) enable users to match network performance requirements with RTE networks.
The value is provided by the RTE device based on the communication profile specified in this section.
5.1 specifies the basic principles necessary to express the performance requirements of a CP for RTE performance. 5.2 Describe the application requirements
The consideration. You can use an application-dependent class to find an appropriate CP. Chapter 4 explains how to declare a device with
CPF or CP consistency.
Industrial Communication Network Fieldbus Specification
Type 23. CC-LinkIE specification
Part 3. CC-LinkIE communication profiles
1 Scope
This section specifies.
--- support for real-time Ethernet (RTE) requirements of the classification of performance indicators;
--- Based on GB/T 15629.3-2014, IEC 61158 series and IEC 61784-1..2014 regulations and related network components;
--- RTE solution capable of running in parallel with applications based on GB/T 15629.3-2014.
These communication profiles are called real-time Ethernet (RTE) communication profiles.
Note. The RTE communication profile uses the GB/T 15629.3-2014 communication network and its associated network components or GB/T 25931 and adds these criteria to
Get the RTE feature.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
Note. All parts of the IEC 61158 series, including IEC 61784-1 and IEC 61784-2, are also subject to standard maintenance. Therefore, the text on these files
Cross reference refers to the date in this normative reference.
GB/T 15629.3-2014 Information processing systems - Local area networks - Part 3. Carrier Sense Multiple Access with Collision Detection (CS-
MA/CD) access method and physical layer specification (ISO /IEC 8802-3..2000, MOD)
GB/T 33537.1-2017 Industrial communication network Fieldbus specification Type 23. CC-LinkIE specification Part 1.
Definition of Layer Service (IEC 61158-5-23..2014, IDT)
GB/T 33537.2-2017 Industrial communication network Fieldbus specification Type 23. CC-LinkIE specification Part 2.
Layer protocol specification (IEC 61158-6-23..2014, IDT)
Information technology - Vocabulary - Part 16. Information theory (Information technology - Vo - ISO 2382-16.
cabulary-Part 16. Informationtheory
IEC 61158 (all parts) Industrial Communication Network Fieldbus specification (Industrialcommunicationnetworks-
Fieldbusspecifications
IEC 61158-6-10..2014 Industrial communication networks - Fieldbus specifications - Part 6-10. Application layer protocol specification type 10
(Industrialcommunication networks-Fieldbus specifications-Part 6-10. Application layer
protocalspecification-Type10elements)
Industrial communication networks - Part 1. Fieldbus routing (IEC 61784-1..2014);
networks-Profiles-Part 1. FieldbusProfiles)
IEC 61784-5-8..2013 Industrial communication network regulations Part 5-8. Fieldbus installation Installation of CPF8 communication
(Industrialcommunicationnetworks-Profiles-Part 5-8. Instalationoffieldbuses-Instalationpro-
filesforCPF8)
IEEE802-2001 LAN and MAN Overview and Architecture (IEEEStandardsforLocalandMetropolitan
Networks. OverviewandArchitecture)
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 33537.3-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 33537.3-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 33537.3-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 33537.3-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|