HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 32910.6-2025 English PDF

US$219.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 32910.6-2025: Data center - Resource utilization - Part 6: Water usage effectiviness
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 32910.6-2025English219 Add to Cart 3 days [Need to translate] Data center - Resource utilization - Part 6: Water usage effectiviness Valid GB/T 32910.6-2025

PDF similar to GB/T 32910.6-2025


Standard similar to GB/T 32910.6-2025

GB/T 38665.2   GB/T 38665.1   GB/T 9813.3   GB/T 32910.4   GB/T 32910.2   GB/T 32910.1   

Basic data

Standard ID GB/T 32910.6-2025 (GB/T32910.6-2025)
Description (Translated English) Data center - Resource utilization - Part 6: Water usage effectiviness
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard L60
Classification of International Standard 35.020
Word Count Estimation 10,120
Date of Issue 2025-05-30
Date of Implementation 2025-12-01
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 32910.6-2025: Data center - Resource utilization - Part 6: Water usage effectiviness

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 35.020 CCSL60 National Standard of the People's Republic of China Data Center Resource Utilization Part 6.Water use efficiency Released on 2025-05-30 2025-12-01 Implementation State Administration for Market Regulation The National Standardization Administration issued

Table of contents

Preface III Introduction IV 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Abbreviations 2 5 Data Center Water Efficiency Level 2 6 Data Center Water Use Boundaries 2 7 Measurement of WUE and WUEev calculation parameters 2 8 Calculation method 3 9 Disclosure requirements 4 References 5

Foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document is part 6 of GB/T 32910 Data Center Resource Utilization. GB/T 32910 has published the following parts. --- Part 1.Terminology; --- Part 2.Key performance indicator setting requirements; --- Part 3.Electrical energy efficiency requirements and measurement methods; --- Part 4.Utilization rate of renewable energy; --- Part 6.Water use efficiency. Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document was proposed and coordinated by the National Information Technology Standardization Technical Committee (SAC/TC28). This document was drafted by. China Electronics Technology Standardization Institute, China Science and Technology (Beijing) Technology Co., Ltd., China Electronics Technology Standards East China Branch of the Institute of Chemical Engineering, Kailuan Construction (Group) Co., Ltd., Qinghai Provincial Development and Reform Commission, Beijing University of Technology, Beijing CESI Technology Development Co., Ltd., China Unicom Qinghai Branch, Huawei Digital Energy Technology Co., Ltd., China Beijing Branch of United Network Communications Co., Ltd., China Electronics Technology Group Corporation, PetroChina Exploration Co., Ltd. Exploration and Development Research Institute, Yangxin Hongsheng Copper Co., Ltd., China Institute of Metrology, Beijing Tonghe Shiyi Telecommunications Science and Technology Research Institute Co., Ltd. Company, Zhongguancun Association for the Promotion of Information Industry, Nanjing Jialitu Computer Room Environment Technology Co., Ltd., Zhongtongfu Construction Co., Ltd., Shenzhen Langgerui Industrial Development Co., Ltd., Shanghai Huarui Zhongxin Technology Co., Ltd., State Grid Hubei Electric Power Co., Ltd., Alibaba Cloud Computing Co., Ltd., Zhongshui Zhujiang Planning, Surveying and Design Co., Ltd., Zhonglian Yungang Data Technology Co., Ltd., China Electronics Engineering Design Institute Co., Ltd. LIMITED. The main drafters of this document are. Zhang Junhua, Lin Li, Yan Wang, Gao Shuchen, Xiao Yang, Liu Haishan, Zhou Feng, Liu Yu, Wei Limei, Jin Chi, Ran Yongming, Li Baoyu, Zhang Jia, Zhou Zhen, Yu Qingyou, Luo Yi, Wang Bin, Yuan Yudong, Lü Tianwen, Xu Haijin, Liu Yibin, Zhu Chen, Deng Zhifu, Tian Haitao, Dai Dangdang, Wang Chuang, Wu Zheng, Zhou Kang, Xiao Tianli, Zhang Xu, Shi Ye.

Introduction

GB/T 32910 “Data Center Resource Utilization” is intended to consist of the following parts. --- Part 1.Terminology. The purpose is to specify common terms and definitions in the field of data center resource utilization. --- Part 2.Key performance indicator setting requirements. The purpose is to specify the setting requirements and description methods of key performance indicators of data centers. Method and use. --- Part 3.Electric energy efficiency requirements and measurement methods. The purpose is to define, measure and calculate the efficiency of electric energy use in data centers. Calculation method, etc. --- Part 4.Renewable energy utilization rate. The purpose is to define and calculate the renewable energy utilization rate of data centers. Law, etc. --- Part 5.Carbon efficiency. The purpose is to specify the definition, measurement method and calculation method of carbon efficiency of data centers. --- Part 6.Water resource efficiency. The purpose is to specify the definition, calculation method and water efficiency of data center water resource efficiency. Grading methods, etc. Data Center Resource Utilization Part 6.Water use efficiency

1 Scope

This document establishes the water efficiency level and water resource boundary of data centers, and stipulates the relationship between water resource utilization efficiency and water resource utilization efficiency. The measurement, calculation methods and disclosure requirements for rate evaluation value calculation parameters. This document is applicable to the calculation of water resource utilization efficiency in data centers, and is also applicable to the analysis of water resource utilization in data centers. It can be used as a reference for data center design, construction, and operation and maintenance, and as a basis for water efficiency evaluation of data centers.

2 Normative references

The contents of the following documents constitute essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 32910.3-2016 Data center resource utilization Part 3.Electrical energy efficiency requirements and measurement methods

3 Terms and definitions

The following terms and definitions apply to this document. 3.1 Data Center It consists of computer sites (computer rooms), other infrastructure, information system hardware and software, information resources (data) and personnel, as well as corresponding regulations. An entity composed of degrees. [Source. GB/T 32910.1-2017, 2.1] 3.2 After treatment, the urban water supply unit provides reusable sewage (wastewater) to customers that meets the water quality requirements for certain purposes. 3.3 The data center collects rainwater, dehumidified water, fuel combustion water and other non-drinking water resources on site, which are self-treated to meet the cooling needs. Water quality standards and requirements for equipment use and reuse of water. Note. The water generated by recycling conventional water sources (such as groundwater and tap water) in the data center does not belong to the data center's self-produced recycled water. 3.4 The amount of water that is consumed and lost in various forms in maintaining the normal operation of a data center and cannot return to surface water bodies or underground aquifers. 3.5 The total amount of electricity consumed by various information equipment in a data center. [Source. GB/T 32910.3-2016, 3.3]

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 32910.6-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 32910.6-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 32910.6-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 32910.6-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.