|
US$149.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31997-2015: Codes of construction acceptance on wind power plant project Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31997-2015 | English | 149 |
Add to Cart
|
3 days [Need to translate]
|
Codes of construction acceptance on wind power plant project
| Valid |
GB/T 31997-2015
|
PDF similar to GB/T 31997-2015
Basic data | Standard ID | GB/T 31997-2015 (GB/T31997-2015) | | Description (Translated English) | Codes of construction acceptance on wind power plant project | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F11 | | Classification of International Standard | 27.180 | | Word Count Estimation | 7,760 | | Date of Issue | 2015-09-11 | | Date of Implementation | 2016-04-01 | | Quoted Standard | GB/T 20319; GB 50147; GB 50148; GB 50149; GB 50150; GB 50168; GB 50169; GB 50171; GB 50172; GB 50173; GB 50202; GB 50203; GB 50204; GB 50205; GB 50210; GB 50233; GB 50242; GB 50254; GB 50300; GB 50303; DL/T 782; DL/T 95; DL/T 5161.5; DL/T 5161.6; DL/T 5161.7; DL/T 5161.8; DL/T 5161.9; DL/T 5161.10; DL/T 5161.11; DL/T 5161.1; DL/T 5161.12; DL/T 5161.13; DL/T 5161.14; DL/T 5161.16; DL/T 5161.17; DL/T 5161.3; DL/T 5161.2; DL/T 5161.15; DL/T 5161.4; DL/T 5168; DL/T 5210.1; JTG B01; NB/T 31021 | | Regulation (derived from) | National Standard Announcement 2015 No.25 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the wind farm project completion acceptance unit, booster station starts, the transfer of production engineering and completion inspection and acceptance of the main technical requirements. This Standard applies to new, expanded wind farm construction project acceptance. |
GB/T 31997-2015: Codes of construction acceptance on wind power plant project---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(Wind farm construction project acceptance procedures)
ICS 27.180
F11
National Standards of People's Republic of China
Wind farm construction project acceptance procedures
Issued on. 2015-09-11
2016-04-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard is proposed and managed by the China Electricity Council.
This standard was drafted. Zhejiang Longyuan Wind Power Co., Ltd., the Electric Power Technology Development Co., Ltd.
The main drafters of this standard. Chen Gengbiao, Su Meng, Du Jie, Wang Miao, Wu Jincheng, Han Ming.
Wind farm construction project acceptance procedures
1 Scope
This standard specifies the wind farm project completion acceptance unit, booster station starts, the transfer of production engineering acceptance and completion of the project acceptance
The main technical requirements.
This standard applies to new construction, expansion of wind farm construction project acceptance.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 20319 wind turbine acceptance
GB 50147 electrical high-voltage electrical equipment installation engineering construction and acceptance
GB 50148 electric equipment installation of power transformers, oil reactors, transformers for construction and acceptance
GB 50149 electric equipment installation engineering construction and acceptance of bus arrangement
GB 50150 works of electrical installations electrical equipment handover test standard
GB 50168 electric equipment installation engineering construction and acceptance of cable lines
GB 50169 electric equipment installation engineering construction and acceptance of grounding devices
GB 50171 electric equipment installation engineering cubicle and secondary circuit wiring for construction and acceptance
GB 50172 electric equipment installation engineering construction and acceptance of battery
GB 50173 works of electrical installations 66kV and below overhead power line construction and acceptance
GB 50202 foundation engineering foundation construction quality acceptance
Construction Quality Acceptance GB 50203 masonry structure specification
GB 50204 Construction Quality Acceptance of Concrete Structure Engineering
Steel Engineering Construction Quality Acceptance GB 50205
GB 50210 Building Decoration Engineering Quality Acceptance
GB 50233 110 ~ 500kV overhead transmission line construction and acceptance
Construction Quality GB 50242 Building Water and Heating Engineering acceptance
GB 50254 electrical low-voltage electrical equipment installation engineering construction and acceptance
GB 50300 Construction Quality Acceptance of uniform standards
Building Construction Quality GB 50303 Electrical Projects
DL/T 782 110kV and above Transmission and Distribution Project start and completion and acceptance procedures
DL/T 995 relay protection and automatic device grid security inspection procedures
DL/T 5161 (all parts), electrical equipment installation engineering quality inspection and assessment procedures
DL/T 5168 110kV ~ 500kV overhead power line quality and assessment procedures Construction
DL/T 5210.1 power construction construction quality inspection and evaluation procedures - Part 1. civil engineering
JTGB 01 highway engineering standard
NB/T 31021 wind TECHNOLOGY filing and finishing specifications
|