HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 31960.8-2015 English PDF

US$259.00 · In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 31960.8-2015: Technical specification of power energy efficiency monitoring system -- Part 8: Specification of security protection
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 31960.8-2015English259 Add to Cart 3 days [Need to translate] Technical specification of power energy efficiency monitoring system -- Part 8: Specification of security protection Valid GB/T 31960.8-2015

PDF similar to GB/T 31960.8-2015


Standard similar to GB/T 31960.8-2015

GB/T 36050   GB/T 36278   GB/T 33592   GB/T 31960.13   GB/T 31960.12   GB/T 31960.11   

Basic data

Standard ID GB/T 31960.8-2015 (GB/T31960.8-2015)
Description (Translated English) Technical specification of power energy efficiency monitoring system -- Part 8: Specification of security protection
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard F20
Classification of International Standard 27.01
Word Count Estimation 12,157
Date of Issue 2015-09-11
Date of Implementation 2016-04-01
Regulation (derived from) National Standard Announcement 2015 No.25
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China

GB/T 31960.8-2015: Technical specification of power energy efficiency monitoring system -- Part 8: Specification of security protection


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification of power energy efficiency monitoring system - Part 8. Specification of security protection ICS 27.010 F20 National Standards of People's Republic of China Electricity Energy Efficiency Monitoring System Technical Specifications Part 8. Security Specification Part 8. Specificationofsecurityprotection Issued on. 2015-09-11 2016-04-01 implementation Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China Standardization Administration of China released

Table of Contents

Preface Ⅰ Introduction Ⅱ 1 Scope 1 2 Normative references 1 3 Terms and definitions 4 Safety range 1 5 National Master Security Requirements 2 Six provinces (municipalities) level master security requirements 4 7 sub-station safety requirements 5 8 Acquisition System Security Requirements 6 Reference 7

Foreword

GB/T 31960 "Energy Efficiency Power Monitoring System technical specifications" is divided into 13 parts. --- Part 1. General; --- Part 2. Master the functional specification; --- Part 3. communication protocols; --- Part 4. sub-station functional design specifications; --- Part 5. master design guidelines; --- Part 6. Power and energy-efficient centralized information exchange terminal technical conditions; --- Part 7. Energy Efficiency Power monitoring terminal technical conditions; --- Part 8. Security specification; --- Part 9. system test specification; --- Part 10. Power of energy efficiency monitoring terminal test specifications; --- Part 11. Power and energy-efficient centralized information exchange terminal test specifications; --- Part 12. Construction specification; --- Part 13. Field handheld device specifications. This section GB/T Part of 831,960. This section drafted in accordance with GB/T 1.1-2009 given rules. Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents. This section is proposed and managed by the China Electricity Council. This part of the main drafting units. China Electric Power Research Institute, State Grid Smart Grid Research Institute, State Grid Corporation, China Southern Power Grid has Limited liability company, Shanghai Cooperative Technology Co., Ltd., Guangdong Yu Technology Co., Ltd., Nanjing Lin Yang Power Technology Co., Ltd., Nanjing Union Energy Technology Co., Ltd, a light Technology Co., Ltd. Wei Sheng Group Co., Ltd., Shenzhen Clou Electronics Technology Co. Shares The company, Sichuan Venus Sichuan Electric Co., Ltd. Suzhou Taigu electricity. The main drafters of this section. Zhong, high Kunlun, Qiu Yimin, Li Jie, Zhang Xinghua, heavy Cao, Li Li, Wen Hui, Zhang Bing, Dong Lijun, Wang Meng Yu, Ma Liang, Liu Daming, Lin Bo, Zhao Baohua, Yang Bolong, Qin Jianrong, Lide Zhi, XU GAO-JIE, Zhan Xiong, Zhengxiao Kun, Zhou Liang, Zhang.

Introduction

In this part, according to GB/T 22239-2008 "Information security technology information system security protection essential requirements" GB/T 22240-2008 "Information security technology information system security protection rating guide", combined with the power industry information system security Level protection requirements develop. According to "information security level protection management approach" (public through [2007] No. 43) and other national information security protection policy requirements, the State Master level, provincial (city) level by the national master station master station management to determine their degree of protection according to GB/T 22240, by the single master operations Bit security construction; various types of electrical users, energy service providers to deploy energy-efficient power sub-station monitoring system by the power user, energy service Service agencies in accordance with the requirements of GB/T 22240 or national regulatory authorities of the autonomous trade classification, and in accordance with GB/T 22239 or industry regulation Authorities require security protection; acquisition subsystem without a separate classification. According to GB/T 22240, National Master safety protection rating of at least For the three provincial (city) level master degree of protection that is at least two, power users and power sub-station service organizations recommend a minimum degree of protection For the two. This section presents the energy efficiency of the power system monitoring and protection of basic protection requirements focus, wherein the basic protection requirements of GB/T 22239 phase Protection requirements should be the degree of protection of information systems, focusing on the basic protection requirements for protection enhancement or detailed requirements. Electricity Energy Efficiency Monitoring System Technical Specifications Part 8. Security Specification

1 Scope

GB/T 31960 provisions of this part of the scope of the security monitoring system of power and energy efficiency of the national master, provincial (city) level master, Sub-stations and collection subsystem protection requirements. This section applies to the energy efficiency of electric power construction safety monitoring system can also be used as a basis for safety evaluation.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 22239-2008 Information security technology information system security protection essential requirements GB/T 25069 information security technology terms GB/T 50719 electromagnetic shielding room engineering specifications GB/T 31960.1 electricity monitoring system energy efficiency Technical specifications - Part 1. General

3 Terms and Definitions

Terms and definitions GB/T 25069 and GB/T 31960.1 defined apply to this document.

4 Safety Range

According to the technical architecture of GB/T 31960.1 given the power of national energy efficiency monitoring system includes master station, provincial (city) level master and sub-stations Acquisition subsystem (including the information set with interactive terminal monitor terminal). Each part and the part of the network of communication between the security standards are as follows (see picture 1). a) national master shall Part 5 requirements, from physical security, network, host, application, and data levels, etc; (City) b) provincial master shall Part 6 requirements, from the physical, network, host, application, and data such as the level of security protection; c) sub-station power users/energy services deployed by the acquisition subsystem power users/energy services with reference to this section Chapter 7, Chapter 8 requirements, from the physical, network, host, application, and data levels and other independent security protection; (City) d) provincial master to master the national communication network should be guarded in accordance with the national security requirements of the master; e) sub-stations, the acquisition subsystem to the network communication provinces (municipalities) level master shall be guarded in accordance with the provincial (city) level master security requirements; f) acquisition subsystem to the network communication sub-station should be guarded in accordance with sub-station safety requirements; g) portions of security used cryptographic algorithms, the device should meet the national commercial password management requirements.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 31960.8-2015_English be delivered?

Answer: Upon your order, we will start to translate GB/T 31960.8-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 31960.8-2015_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 31960.8-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.