US$239.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31960.4-2015: Technical specification for power energy efficiency monitoring system -- Part 4: Function design specification of substation Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31960.4-2015 | English | 239 |
Add to Cart
|
3 days [Need to translate]
|
Technical specification for power energy efficiency monitoring system -- Part 4: Function design specification of substation
| Valid |
GB/T 31960.4-2015
|
PDF similar to GB/T 31960.4-2015
Basic data | Standard ID | GB/T 31960.4-2015 (GB/T31960.4-2015) | | Description (Translated English) | Technical specification for power energy efficiency monitoring system -- Part 4: Function design specification of substation | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F20 | | Classification of International Standard | 27.010 | | Word Count Estimation | 11,184 | | Date of Issue | 2015-09-11 | | Date of Implementation | 2016-04-01 | | Quoted Standard | GB/T 2589-2008; GB/T 15316-2009; GB/T 31960.8 | | Regulation (derived from) | National Standard Announcement 2015 No.25 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the functional system structure, functional requirements, performance indicators and safety protection requirements of the sub-station of the energy efficiency monitoring system. This standard applies to industrial and commercial enterprises, parks, energy service agencies and other energy efficiency monitoring side of the station system construction. |
GB/T 31960.4-2015: Technical specification for power energy efficiency monitoring system -- Part 4: Function design specification of substation ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical specification for power energy efficiency monitoring system - Part 4. Function design specification of substation
ICS 27.010
F20
National Standards of People's Republic of China
Electricity Energy Efficiency Monitoring System Technical Specifications
Part 4. Sub-station functional design specifications
Part 4. Functiondesignspecificationofsubstation
Issued on. 2015-09-11
2016-04-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 1 System Architecture
5 companies sub-station 2
6 Park or electrical sub-station service 3
7 Interface Design 4
8 Performance 5
9 Safety requirements 5
Foreword
GB/T 31960 "Energy Efficiency Power Monitoring System technical specifications" is divided into 13 parts.
--- Part 1. General;
--- Part 2. Master the functional specification;
--- Part 3. communication protocols;
--- Part 4. sub-station functional design specifications;
--- Part 5. master design guidelines;
--- Part 6. Power and energy-efficient centralized information exchange terminal technical conditions;
--- Part 7. Energy Efficiency Power monitoring terminal technical conditions;
--- Part 8. Security specification;
--- Part 9. system test specification;
--- Part 10. Power of energy efficiency monitoring terminal test specifications;
--- Part 11. Power and energy-efficient centralized information exchange terminal test specifications;
--- Part 12. Construction specification;
--- Part 13. Field handheld device specifications.
This section GB/T Part of 431,960.
This section drafted in accordance with GB/T 1.1-2009 given rules.
Please note that some of the content of this document may involve patents. Release mechanism of the present document does not assume responsibility for the identification of these patents.
This section is proposed and managed by the China Electricity Council.
This part of the main drafting units. China Electric Power Research Institute, Nanjing Electronic Co., Ltd., Beijing Tellhow Power Technology Co.,
The company, Sichuan Venus Sichuan Electric Co., Granville Group Ltd., State Grid Power Company in Hunan Province, Shenzhen Clou Electronics technology stocks
Limited copies.
The main drafters of this section. Wang He, Dong Lijun, Zhong, Wei exhibition, Cai, Li Xianhuai, beginning with silver, Luozhi Kun, Li Jie, Miao Chang Hai, Chen Song Song,
Li Fei.
Electricity Energy Efficiency Monitoring System Technical Specifications
Part 4. Sub-station functional design specifications
1 Scope
GB/T 31960 provisions of this part of the energy efficiency of the electricity sub-station monitoring system functional system architecture, functional requirements, performance and safety
Full protection requirements.
This section applies to businesses, parks, energy services and other energy efficiency monitoring system for electricity sub-station construction.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 2589-2008 comprehensive energy consumption calculation General
GB/T 15316-2009 General principles for monitoring energy efficiency
GB/T 31960.8 electricity monitoring system energy efficiency Technical specifications - Part 8. Security Specification
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Power users comprehensive energy consumption comprehensiveenergyconsumptionofpowerelectriccustomer
Total energy consumption of electricity consumers in the comprehensive statistical reporting period, the main production system, auxiliary production system and ancillary production systems.
4 System Architecture
4.1 System Architecture
Power stations Energy Efficiency Monitoring System (hereinafter referred to as "sub-station") specifically includes businesses user stations, park sub-station, power child services
Station. On the one hand, the sub-station and analysis of statistical information from centralized and interactive terminals, and other management information systems to obtain information; the other
Surface, sub-station to provide the necessary information for the parent master, and gain power to assess energy efficiency, energy-saving solutions and advanced services such as recommendations from the upper master.
External logic structure sub-station shown in Figure 1.
1 sub-station external logic diagram
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31960.4-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 31960.4-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31960.4-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31960.4-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|