US$529.00 · In stock Delivery: <= 5 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31954-2015: AC PLC filter capacitors for HVDC transmission systems Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31954-2015 | English | 529 |
Add to Cart
|
5 days [Need to translate]
|
AC PLC filter capacitors for HVDC transmission systems
| Valid |
GB/T 31954-2015
|
PDF similar to GB/T 31954-2015
Basic data | Standard ID | GB/T 31954-2015 (GB/T31954-2015) | | Description (Translated English) | AC PLC filter capacitors for HVDC transmission systems | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K42 | | Classification of International Standard | 31.060.70 | | Word Count Estimation | 25,245 | | Date of Issue | 2015-09-11 | | Date of Implementation | 2016-04-01 | | Quoted Standard | GB 311.1; GB/T 11024.1-2010; GB/T 11024.2; GB/T 16927.1-2011; GB/T 20993-2012; GB/T 20994-2007; GB/T 26218.1; GB/T 26218.2 | | Regulation (derived from) | National Standard Announcement 2015 No.25 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the HVDC systems Terms and definitions PLC AC filter capacitor, the basic requirements of the conditions of use, quality and other aspects of the test. AC PLC unit and the AC filter capacitor This Standard applies to high-voltage direct current (HVDC) transmission system converter AC side for rated operating frequency of 50 Hz or 60 Hz, filter out the frequency range 30 kHz ~ 500 kHz harmonics PLC filter capacitor banks. |
GB/T 31954-2015: AC PLC filter capacitors for HVDC transmission systems---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
(HVDC Systems PLC AC filter capacitor)
ICS 31.060.70
K42
National Standards of People's Republic of China
HVDC System AC PLC
Smoothing capacitor
Issued on. 2015-09-11
2016-04-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Terms and definitions, abbreviations 1
3.1 Terms and definitions
3.2 Abbreviations 4
4 4 Conditions of Use
4.1 normal conditions of use 4
4.2 Non-normal conditions of use 5
5 Quality requirements and testing 6
5.1 Test Requirements 6
5.2 Test Category 6
5.3 Visual inspection (routine test) 7
5.4 Capacitance measurement (routine test) 7
5.5 capacitor loss tangent (tanδ) Measurement (routine test) 8
5.6 terminals voltage test (routine test) 8
5.7 Internal discharge means test (routine test) 8
5.8 Tightness test (routine test) 9
5.9 partial discharge test (routine test) 9
5.10 Thermal stability test (type test) 9
5.11 between terminal and housing AC voltage test (type test) 10
5.12 between terminals and housing lightning impulse voltage test (type test) 10
5.13 short circuit discharge test (type test) 10
5.14 at high temperature capacitor loss tangent (tanδ) Measurement (type test) 11
5.15 casing and conducting rod stress test (type test) 11
5.16 between terminal and shell insulation resistance measurement (acceptance test) 11
5.17 capacitance measurement (acceptance test) 11
5.18 between terminal and housing AC voltage test (acceptance test) 11
5.19 endurance test (special test) 11
5.20 partial discharge test at a low temperature (special test) 12
6 design and structural requirements 12
6.1 capacitor bank 12
6.2 capacitor gantry 12
6.3 capacitor unit 12
6.4 12 protection
6.5 Mechanical Design 13
13 6.6 Insulator
6.7 terminal 13
6.8 creepage distance 13
6.9 Radio Interference (RIV) Design 13
6.10 Welding 13
6.11 Surface Treatment 13
7 13 insulation level
7.1 standard insulation level 13
14 7.2 General Requirements
7.3 capacitor unit between terminals and the shell test voltage AC 14
15 8 Overload
9 Safety requirements 15
9.1 discharge safety device 15 demands
9.2 housing secure connection requirements 15
Safety requirements for environmental protection 15 9.3
9.4 Additional security requirements 15
10 flag capacitor unit 15
10.1 specification or nameplate 15
10.2 16 Warning Signs
Flag capacitor banks 11 16
11.1 specification or nameplate 16
11.2 16 Warning Signs
12 for installation and operation of the 16
12.1 Overview 16
12.2 Operating temperature 16
17 12.3 Special conditions of use
Appendix A (informative) creepage distance and unified creepage distance relationship between 18
Annex B (informative) discharging the capacitor discharge time is calculated and resistor 19
References 20
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Electrical Equipment Industrial Association.
This standard by the National Standardization Technical Committee on Power capacitor (SAC/TC45) centralized.
This standard is drafted by. Xi'an Electric Power Capacitor Co., Ltd., Xi'an High Voltage Apparatus Research Institute Co., Ltd.
Participated in the drafting of this standard. Shanghai Siyuan Electric Power Capacitor Co., Ltd., New Northeast Electric Group Power Capacitor Co., Guilin
Power Capacitor Co., Ltd., Nissin Electric (Wuxi) Co., Ltd., ABB Xi'an Power Capacitor Co., Ltd., Shenzhen City and electricity
Technology Co., Ltd., Shanghai Jin Yong Electric Group Co., Ltd., Wuxi SUN.KING Capacitor Co., Zhejiang Province, State Grid Power Corporation
Academy of Sciences, Institute of Southern Power Grid Co., Ltd., Cooper Shanghai Power Capacitor Co., Ltd.
The main drafters. Zhang Xinwei, Meng Ying, HE tide, Lin Yue Wang, sworn room, Chong Hu, Ge Jinping, Yanhong Yue, GUO Qing-wen, Lu Tao,
Zhao Fuqing, Liu Dai Hung, Zhou Chunhong, Yanhuan Ling Zhang Jianping, Liling Fei, Wang Linghai.
Introduction
Each HVDC project are based on the specific requirements of their access to system design, manufacture and test, including its rated power, the amount of
Important parameters constant voltage, performance requirements are in accordance with the specific requirements of the selected access system optimization. HVDC systems AC PLC filter
Wave capacitor far as other communications equipment standardization, serialization and standardization. Standardization of equipment is conducive to the design, manufacture, testing, drop
Low equipment costs, reduce project cost, promote the development of HVDC. Currently no filtering electrical AC PLC for HVDC transmission system
Container and the development of standards, the manufacturers according to their respective technical requirements for the design, manufacture and testing of these products and therefore to develop a unified
Standard is necessary.
Foreign supplier of such products earlier, but not specifically for the HVDC system with PLC AC filter capacitor and the development of standards.
The HVDC transmission system developed by the AC filter capacitor standard PLC should fully reflect the study of HVDC equipment
Results. With ultrasound, construction HVDC project exchange field, our in extra and ultra high voltage DC AC field engineering research, design, construction, operation
Bank and other aspects have accumulated experience, so we have full power to establish their own intellectual property HVDC systems with AC PLC filter
Wave standard capacitor.
HVDC System AC PLC
Smoothing capacitor
1 Scope
This standard specifies the HVDC systems Terms and definitions PLC AC filter capacitor, conditions of use, quality requirements and test
Inspection and other aspects of the basic requirements.
This standard applies to high-voltage direct current (HVDC) transmission system converter AC side for rated operating frequency of 50Hz or 60Hz,
Filtered frequency range of 30kHz ~ 500kHz AC harmonic filter capacitor unit PLC PLC and AC filter capacitors.
NOTE. This standard does not include porcelain (or multiple sets) PLC AC filter capacitor structure. AC porcelain (or multiple sets) structure PLC filter capacitor Executive
See Line standard IEC 60358-2.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 311.1 insulation coordination - Part 1. Definitions, principles and rules (GB 311.1-2012, IEC 60071-1.2006, MOD)
GB/T 11024.1-2010 nominal voltage above 1000V ac power systems parallel capacitor - Part 1. General
(IEC 60871-1.2005, MOD)
GB/T 11024.2 rated voltage above 1kV shunt capacitors for ac power systems - Part 2. Endurance testing
(GB/T 11024.2-2001, IEC /T S60871-2.1999, IDT)
GB/T 16927.1-2011 high voltage test techniques - Part 1. General definitions and test requirements (IEC 60060-1.2010,
MOD)
GB/T 20993-2012 HVDC surge capacitor and a DC filter capacitor neutral bus
GB/T 20994-2007 high-voltage direct current transmission system with parallel capacitors and the AC filter capacitor
GB/T 26218.1 under filthy conditions Insulators selection and sizing - Part 1. Definitions, information and general
Principles (GB/T 26218.1-2010, IEC /T S60815-1.2008, MOD)
GB/T 26218.2 under filthy conditions Insulators selection and sizing Part 2. AC system with porcelain and glass
Glass insulators (GB/T 26218.2-2010, IEC /T S60815-2.2008, MOD)
3 Terms and definitions, abbreviations
3.1 Terms and Definitions
GB/T 11024.1-2010 and GB/T 20993-2012 define the following terms and definitions apply to this document. To Party
It is repeated below lists the GB/T 11024.1-2010 and GB/T 20993-2012 some terms and definitions.
3.1.1
Capacitor element (element) capacitorelement (element)
A dielectric and two electrodes separated by its members posed.
[GB/T 11024.1-2010, Definition 3.1]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31954-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 31954-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 3 ~ 5 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31954-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31954-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|