Technical requirements for monitoring and control system of photovoltaic power station
| Valid |
GB/T 31366-2015
|
PDF similar to GB/T 31366-2015
Basic data | Standard ID | GB/T 31366-2015 (GB/T31366-2015) | | Description (Translated English) | Technical requirements for monitoring and control system of photovoltaic power station | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F12 | | Classification of International Standard | 27.160 | | Word Count Estimation | 19,186 | | Date of Issue | 2015-02-04 | | Date of Implementation | 2015-09-01 | | Quoted Standard | GB/T 13729; DL/T 634.5104; DL/T 860.6; DL/T 860.7420; DL/T 860.74; DL/T 860.71; DL/T 860.901; DL/T 860.73; DL/T 860.72; DL/T 860.10; DL/T 860.3; DL/T 860.4; DL/T 860.5; DL/T 860.81; DL/T 860.92; DL/T 5149-2001 | | Regulation (derived from) | National Standards Bulletin 2015 No. 3 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the structure and configuration of grid-connected photovoltaic power plant monitoring system, system functionality, performance indicators, working conditions and other technical requirements. This Standard applies to the above by 35 kV voltage level and the grid, as well as a new connection by 10 kV voltage level with the public grid, renovation and expansion of photovoltaic power stations. |
GB/T 31366-2015: Technical requirements for monitoring and control system of photovoltaic power station ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements for monitoring and control system of photovoltaic power station
ICS 27.160
F12
National Standards of People's Republic of China
Photovoltaic power plant monitoring system technical requirements
Issued on. 2015-02-04
2015-09-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 General 2
5 System structure and configuration 2
6 System features 3
7 Performance 6
8 7 working conditions
Appendix A (informative) PV power plant control system configuration diagram of a typical communication 9
Annex B (informative) photovoltaic cells typical communication structure 10
Annex C (informative) spacer collect basic information table 11
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Electricity Council.
The standard by the China Electricity Council.
This standard was drafted. China Electric Power Research Institute, State Grid Electric Power Research Institute, China Merchants New Energy Holdings Co., Ltd., Inner Mongolia God
Photovoltaic Power Company Limited boat.
The main drafters of this standard. Wu Fu Bao, Zhangxiang Wen, Wang Lu water, Zhou Ye Fei, Chen Mei, He Weiguo, Feng Wei, Zhang white, Kongai Liang, WANG Chun,
Huaguang Hui, Xu Yongbang, Ma Xinping, Secretary De-liang, Yang Bo, Tao to Bin.
Photovoltaic power plant monitoring system technical requirements
1 Scope
This standard specifies the structure and configuration of grid-connected photovoltaic power plant monitoring system, system functionality, performance, working conditions and other technologies
Claim.
This standard applies to 35kV and above voltage level through the grid, and connected via 10kV voltage level and a new public grid
Construction, renovation and expansion of photovoltaic power plants.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 13729 remote terminal device
DL/T 634.5104 Telecontrol equipment and systems - Part 5-104. Transmission protocols using standard transmission protocol subset IEC 60870-
5-101 Network Access
DL/T 860 (all parts) substation communication networks and systems
DL/T 5149-2001 220 ~ 500kV substation computer monitoring system design technical regulations
Secondary power system security protection regulations (State Electricity Regulatory Commission Order No. 5, 2005)
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Photovoltaic power station photovoltaic (PV) powerstation
In photovoltaic systems, involving all types of construction (structures) and repair, maintenance, power stations and other auxiliary facilities, including a living.
3.2
Photovoltaic power generation unit PVpowerunit
Photovoltaic power plant, with a number of PV module strings via the DC combiner box collection, the inverter and the inverter transformer isolated boost
Boost to conform to grid frequency and voltage requirements of the power supply. Also known as the power unit module.
3.3
And outlets pointofinterconnectionofPVpowerstation
For booster station photovoltaic power plants, booster station refers to the high-pressure side of the bus or node. For no booster station photovoltaic power stations, photovoltaic means
Output summing point plant.
3.4
Monitoring system monitoringandcontrolsystems
The use of computer production process real-time monitoring and control system.
3.5
Spacer layer baylevel
By the (smart) I/O unit, a control unit which controls the network and protect the interface machine and the like, for in situ measurement control unit device layer.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31366-2015_English be delivered?Answer: Upon your order, we will start to translate GB/T 31366-2015_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31366-2015_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31366-2015_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|