|
US$259.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 31348-2014: Technical requirements of measurement and verification of energy savings -- Lighting system Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 31348-2014 | English | 259 |
Add to Cart
|
3 days [Need to translate]
|
Technical requirements of measurement and verification of energy savings -- Lighting system
| Valid |
GB/T 31348-2014
|
PDF similar to GB/T 31348-2014
Basic data | Standard ID | GB/T 31348-2014 (GB/T31348-2014) | | Description (Translated English) | Technical requirements of measurement and verification of energy savings -- Lighting system | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F01 | | Classification of International Standard | 27.010 | | Word Count Estimation | 11,175 | | Date of Issue | 12/31/2014 | | Date of Implementation | 7/1/2015 | | Quoted Standard | GB/T 5700-2008; GB 17167-2006; GB/T 28750-2012; GB 50034; GB 50582; CJJ 45; JGJ/T 163; JTG/T D70 | | Regulation (derived from) | National Standards Bulletin 2014 No. 33 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the lighting system energy savings measurement and verification of energy consumption statistics and border demarcation project scope, basic requirements, measurement and verification methods and measurement and verification progra |
GB/T 31348-2014: Technical requirements of measurement and verification of energy savings -- Lighting system ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Technical requirements of measurement and verification of energy savings - Lighting system
ICS 27.010
F01
National Standards of People's Republic of China
Energy savings measurement and verification technical requirements for lighting systems
Issued on. 2014-12-31
2015-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
This standard by the National Standardization Technical Committee for Energy and Management (SAC/TC20) and focal points.
This standard drafting units. China National Institute of Standardization, the National Standardization Technical Union energy-saving emission reduction, Beijing Cheng Tong Optoelectronics Co., Ltd.,
Tianjin Shengming Technology Co., Ltd., Shenzhen Spike Energy Services Ltd., Guangdong Wen Rong Energy Technology Group Co., Ltd., Philips (in
Country) Investment Co., Ltd., Shandong days Optoelectronics Technology Co., Ltd., Shenzhen Yu Fu Lighting Co., Ltd., Shenzhen Decker energy when there is environmental technology
Ltd., Wuhan Yangtze Semiconductor Lighting Technology Co., Ltd., Shenzhen Chau Ming Technology Co., Ltd., Henan Xinfei Lighting Technology Co.,
Ltd., Shenzhen Qianhai Smart Energy Systems Limited.
The main drafters of this standard. Pan Chong Chao, Li Pengcheng, Hai Hung Chen, Tian Jianwei, Wang Lei, Zhao Yuejin, Lvqiu Sheng, Kang Tong Bo, Xiayu Juan, Xu Guoping,
Wang gave birth, Yao Yan Wei, Wu Feng, Sun Jian, Liu Yongsheng, Xubi Wen, Liu Bo, PROJECTILES, Liu Yang, Deng Mingjun, Wang Yuefei, including Mingfen.
Energy savings measurement and verification technical requirements for lighting systems
1 Scope
This standard specifies the lighting system energy savings measurement and verification of energy consumption statistics and border demarcation project scope, basic requirements, measurement and verification
Methods and measurement and verification programs.
This standard applies to the measurement and verification of energy-saving technological transformation projects indoor and outdoor lighting system energy savings.
This standard does not apply to landscape lighting retrofit projects and renovation projects lighting purposes or illuminated area before and after the change.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 5700-2008 illumination measurement method
GB 17167-2006 energy use per unit of energy measuring instruments and General Manager
GB/T 28750-2012 energy section measurement and verification techniques General
GB 50034 architectural lighting design standards
GB 50582 outdoor job site lighting design standards
CJJ45 city road lighting design standards
JGJ/T 163 urban landscape lighting design specifications
JTG/T D70 highway tunnel design Details
3 Terms and Definitions
GB/T 5700-2008, GB/T 28750-2012 define the following terms and definitions apply to this document.
3.1
Lighting system lightingsystem
To illuminate for the purpose by the general lights, lighting and control systems, centralized or semi-centralized lighting composition.
4 border demarcation project scope and power consumption statistics
4.1 Item border demarcation
Lighting system should be based on site conditions and energy-saving lighting system project content, reasonably determine the boundaries of lighting systems, typically include
Lamps, lighting and control systems, as shown in FIG.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 31348-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 31348-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 31348-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 31348-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|