HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 30370-2022 English PDF

US$269.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 30370-2022: Guide of primary frequency control test and performance acceptance for thermal power generating units
Status: Valid

GB/T 30370: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 30370-2022English269 Add to Cart 3 days [Need to translate] Guide of primary frequency control test and performance acceptance for thermal power generating units Valid GB/T 30370-2022
GB/T 30370-2013English439 Add to Cart 3 days [Need to translate] Guide of primary frequency control test and performance acceptance for thermal power generating units Obsolete GB/T 30370-2013

PDF similar to GB/T 30370-2022


Standard similar to GB/T 30370-2022

GB/T 2820.7   GB/T 2820.9   GB/T 2317.4   GB/T 12786   GB/T 37089   

Basic data

Standard ID GB/T 30370-2022 (GB/T30370-2022)
Description (Translated English) Guide of primary frequency control test and performance acceptance for thermal power generating units
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard K52
Classification of International Standard 29.160.40
Word Count Estimation 14,198
Date of Issue 2022-10-14
Date of Implementation 2023-05-01
Older Standard (superseded by this standard) GB/T 30370-2013
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 30370-2022: Guide of primary frequency control test and performance acceptance for thermal power generating units


---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide of primary frequency control test and performance acceptance for thermal power generating units ICS 29.160.40 CCSK52 National Standards of People's Republic of China Replacing GB/T 30370-2013 The first frequency modulation test of thermal power generator set and Performance Acceptance Guidelines Published on 2022-10-12 2023-05-01 Implementation State Administration for Market Regulation Released by the National Standardization Administration directory Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Test purpose 2 5 Main technical indicators 2 6 Test conditions 3 7 Test requirements and methods 3 8 Test Step 4 9 Performance Acceptance 4 Appendix A (Informative) Primary Frequency Modulation Characteristics of Thermal Power Generating Sets Figure 5 Appendix B (informative) Typical schematic diagram of primary frequency modulation function 7 Appendix C (Informative) Table 8 of Load Condition and Disturbance Configuration for a Frequency Modulation Test Appendix D (Informative) One Frequency Modulation Performance Test and Acceptance Form 9

foreword

This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for Standardization Work Part 1.Structure and Drafting Rules of Standardization Documents" drafted. This document replaces GB/T 30370-2013 "Guidelines for Primary Frequency Modulation Test and Performance Acceptance of Thermal Power Generating Sets", and GB/T 30370- Compared with.2013, except for structural adjustment and editorial changes, the main technical changes are as follows. a) The main technical indicators of a frequency modulation test are added (see 5.5); b) Added a frequency modulation test condition (see Chapter 6); c) Added a frequency modulation test requirements and methods (see 7.3 and 7.4); d) Added the primary frequency modulation characteristic diagram of thermal power generating units (see Appendix A); e) A frequency modulation test load condition and disturbance quantity configuration table is added (see Appendix C); f) Modified a frequency modulation test analysis calculation table (see Appendix D, Appendix B of the.2013 edition). Please note that some content of this document may be patented. The issuing agency of this document assumes no responsibility for identifying patents. This document is proposed by China Electricity Council. This document is under the jurisdiction of the National Power Plant Process Monitoring and Information Standardization Technical Committee (SAC/TC376). This document is drafted by. North China Electric Power Research Institute Co., Ltd., State Grid Zhejiang Electric Power Co., Ltd. Electric Power Research Institute, Jiangsu Future Smart Information Technology Co., Ltd., Xi'an Thermal Engineering Research Institute Co., Ltd., State Grid Liaoning Electric Power Co., Ltd. Electric Power Research Institute, State Grid Gansu Electric Power Company Electric Power Research Institute, State Power Investment Group Inner Mongolia Baiyinhua Coal and Electricity Co., Ltd. Hangkou Power Generation Branch, Shaanxi Yanchang Petroleum Fuxian Power Generation Co., Ltd., Datang Yangcheng Power Generation Co., Ltd., Beijing Huake Tonghe Technology Co., Ltd., Inner Mongolia Dai Hai Power Generation Co., Ltd., Inner Mongolia Jinglong Power Generation Co., Ltd. The main drafters of this document. Yang Zhenyong, Li Weihua, Kang Jingqiu, Zhang Jiangfeng, Wei Xiang, Gao Haidong, Liu Lei, Qin Tianmu, Zhao Jinyu, Gao Aiguo, Gao Ming, Shang Yong, Liang Jinming, Li Jun, Wang Li, Chen Zhenshan, Gao Mingshuai, Li Jianjun, Xing Zhiwei, You Mo, Zhang Shun, Pang Zhanzhou, Sun Peixin. The previous versions of this document and its superseded documents are as follows. ---First published in.2013 as GB/T 30370-2013; ---This is the first revision. The first frequency modulation test of thermal power generator set and Performance Acceptance Guidelines

1 Scope

This document specifies the main technical requirements and methods for the primary frequency modulation test and performance acceptance of thermal power generating units. This document is applicable to thermal power generating units with a single unit capacity of 100MW and above, and thermal power generating units of other capacity levels. Carry out.

2 Normative references

The contents of the following documents constitute essential provisions of this document through normative references in the text. Among them, dated citations documents, only the version corresponding to that date applies to this document; for undated references, the latest edition (including all amendments) applies to this document. GB/T 26863 Terminology of monitoring system for thermal power station DL/T 657 Acceptance test procedure for analog quantity control system of thermal power plant

3 Terms and Definitions

The terms and definitions defined in GB/T 26863 and the following apply to this document. 3.1 The speed of each generator set is adjusted by the speed governor of each prime mover, so that the driving torque varies with the system frequency. [Source. GB/T 26863-2011, 6.29.1.5] 3.2 The primary frequency modulation regulation system is insensitive to the speed difference or frequency difference near the rated speed. 3.3 From the last time the speed difference or frequency difference exceeds the frequency modulation dead zone to the time when the unit load starts to change in the correct frequency modulation direction time. 3.4 The allowable range from the last time the speed difference or frequency difference exceeds the frequency modulation dead zone to the last time when the unit load reaches the target value within the time required. 3.5 Speed droop droop The slope of the static characteristic curve of the steam turbine control system. Usually, the ratio of the speed difference corresponding to the empty load and full load to the rated speed expressed as a percentage. [Source. GB/T 26863-2011, 6.29.4.15]

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 30370-2022_English be delivered?

Answer: Upon your order, we will start to translate GB/T 30370-2022_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 30370-2022_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 30370-2022_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 30370-2022?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 30370-2022 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.