US$229.00 ยท In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 30028-2013: Energy efficiency test methods for electrical hoists Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 30028-2013 | English | 229 |
Add to Cart
|
3 days [Need to translate]
|
Energy efficiency test methods for electrical hoists
| Valid |
GB/T 30028-2013
|
PDF similar to GB/T 30028-2013
Basic data Standard ID | GB/T 30028-2013 (GB/T30028-2013) | Description (Translated English) | Energy efficiency test methods for electrical hoists | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | J80 | Classification of International Standard | 53.020.99 | Word Count Estimation | 10,140 | Quoted Standard | GB 755-2008; GB/T 1032-2005; JB/T 5317; JB/T 10222; JB/T 9008.1 | Regulation (derived from) | National Standards Bulletin 2013 No. 23 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies: electric hoist energy efficiency testing methods. This standard applies to: wire rope hoist, chain hoist and explosion-proof electric hoist. Others may refer to the use of electric hoist. |
GB/T 30028-2013: Energy efficiency test methods for electrical hoists---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Energy efficiency test methods for electrical hoists
ICS 53.020.99
J80
National Standards of People's Republic of China
Hoist Energy Efficiency Test Methods
Issued on. 2013-11-27
2014-03-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Machinery Industry Federation.
This standard by the National Standardization Technical Committee crane (SAC/TC227) centralized.
This standard is drafted by. Beijing Materials Handling Design and Research Institute, Nanjing Hoisting Machinery Plant Co., lifting transport Country
Machinery Quality Supervision and Inspection Center.
Participated in the drafting of this standard. Hangzhou, Zhejiang Machinery Co., Ltd. from Zhejiang Double Bird Machinery Co., Demag Cranes & Components (Shanghai)
Limited, Konecranes (Shanghai) Co., Ltd. Hubei silver round lifting machinery, lifting machinery plant in Jiangxi Province, Dongguan City,
Crown Taiwan Lifting Equipment Co., Ltd. Nanjing Special Motor Factory.
The main drafters of this standard. Jin Yan Feng, Lee Hong, Tao Tianhua, Zhang Haokun, Zhouzeng Lin, Zhang Ji Jun, shall be mine, Gao Ning, Ma capable, Liu Xiaosheng,
Hujian Xing Tang to Mori.
Hoist Energy Efficiency Test Methods
1 Scope
This standard specifies the energy efficiency test method hoist.
This standard applies to electric wire rope hoist, chain hoist and explosion-proof electric hoist. Other electric hoist can refer to use.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 755-2008 rotating motor fixed and performance test
GB/T 1032-2005 Test method for three-phase asynchronous motors
JB/T 9008.1 wire rope hoists - Part 1. Types and basic parameters, technical conditions
JB/T 5317 electric chain hoist
JB/T 10222 proof electric hoist
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Supplying energy supplyenergy
Hoist within the prescribed period of work to complete the action from the input energy lift.
3.2
Effective energy effectiveenergy
Potential changes in the value of electric hoist within the prescribed period of work to complete the lifting operation generated.
3.3
Value of energy efficiency energyefficiency
Hoist within the specified duty cycle, the ratio of effective energy and energy supply.
4 Test Conditions
4.1 Basic requirements
Electric wire rope hoist, chain hoist and explosion-proof electric hoist shall meet the JB/T 9008.1, JB/T 5317 and
JB/T 10222 in the provisions.
4.2 site operating conditions
Field operating conditions shall comply with the requirements of GB 755-2008 6.1 ~ 6.4.
4.3 Test Power
Test Power shall comply with GB/T 1032-2005 4.2 requirements.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 30028-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 30028-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 30028-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 30028-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|