|
US$509.00 · In stock Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29817-2013: General technology requirement for pressure/differential pressure transmitter based on HART communication Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 29817-2013 | English | 509 |
Add to Cart
|
4 days [Need to translate]
|
General technology requirement for pressure/differential pressure transmitter based on HART communication
| Valid |
GB/T 29817-2013
|
PDF similar to GB/T 29817-2013
Basic data | Standard ID | GB/T 29817-2013 (GB/T29817-2013) | | Description (Translated English) | General technology requirement for pressure/differential pressure transmitter based on HART communication | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N10 | | Classification of International Standard | 25.040.40 | | Word Count Estimation | 22,278 | | Quoted Standard | GB 3836.1; GB 3836.2; GB 3836.4; GB 3836.19; GB 3836.20; GB/T 17212; GB/T 17614.1; GB/T 17626.2; GB/T 17626.3; GB/T 17626.4; GB/T 17626.5; GB/T 17626.6; GB/T 17626.8; GB/T 18268.1-2010; GB/T 18271.1; GB/T 21099.3; GB/T 29910.1; IEC 61158-5-20-2010; IEC 61 | | Regulation (derived from) | National Standards Bulletin No. 22 of 2013 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the HART protocol based on pressure/differential pressure transmitter HART communication related terms and definitions, and abbreviations, classification, requirements and test methods. This standard applies to pressure/differentia |
GB/T 29817-2013: General technology requirement for pressure/differential pressure transmitter based on HART communication ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
General technology requirement for pressure/differential pressure transmitter based on HART communication
ICS 25.040.40
N10
National Standards of People's Republic of China
HART protocol based on the pressure/differential pressure transmitter
General technical conditions
Issued on. 2013-11-12
2014-03-15 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms, definitions and abbreviations 2
3.1 Terms and definitions 2
3.2 Abbreviations 4
4 Category 4
5 Requirements 4
5.1 Working Conditions 4
5.2 HART Communication Protocol 6
5.3 Electromagnetic Compatibility 12
5.4 explosive atmospheres explosion-proof 12
6 Test methods 12
6.1 Test conditions 12
6.2 HART communications protocol test 13
6.3 Compatibility Test Method capacitor 17
6.4 explosive atmospheres explosion-proof performance test 17
References 18
Foreword
This standard was drafted in accordance with GB/T 1.1-2009 given rules.
The standard proposed by China Machinery Industry Federation.
This standard by the national industrial process measurement and control Standardization Technical Committee (SAC/TC124) centralized.
This standard was drafted. Fujian on the Run Precision Instrument Co., Ltd., opened Kaifeng Instrument Automation Instrumentation Co., Shenzhen Li Technology open standard
Company Limited, Anton Xiamen Electronics Co., Ltd., Anhui Blue Run Automation Instrumentation Co., Ltd., Chongqing Yutong System Software Inc., Chongqing
City stalwart detector Manufacturing Company, Anhui Automation Instrumentation Co., Ltd. Zhejiang Di yuan Instrument Co., Ltd., Fuzhou Baxter Auto
Equipment Co., Ltd., Central-day instrument Co., Ltd., Beijing Rip three yuan Instrument Co., Ltd., Fujian Shunchang Rainbow Run Precision Instrument Co.,
Division Nanjing gifted times Electric Co., Ltd., Siemens (China) Co., Ltd., Shanghai ABB Engineering Co., Ltd., Shanghai Automation Instrumentation shares have
Limited, Beijing peacekeeping Shing New Instrument Technology Co., Ltd. Shanghai Weier Tai Industrial Automation Co., Ltd., machinery of Instrumentation Technology
Surgery Economic Research Institute, Chongqing Ivey Instrument Co., Ltd., Chongqing quadruple Control Technology Co., Southwest University.
The main drafters of this standard. Zou Chong, Ge Jian, Wang Jiacheng, YT, Li Fengzhen, Hong Xiaoping, Chen Wanlin, Liu Xiaoqing, TANG Tian, \u200b\u200bWu Yue-ping,
Sun Xiangdong, Qi Jianfeng, Li Qiang, Li, and Chen Zhiyang, Dong Jian, Wang Baobing, Doulian Wang, Shen Wei is willing, Tianquan Lin, Cheung Po Chun, ARCHIVES, Jinda,
Chen Jie, Wang Linkun, Zhang Chuan Chao, in Chiayi, Nieshao Zhong, Huang Renjie, Zhao Yixin, Huang Qiaoli Pan Dongpo.
HART protocol based on the pressure/differential pressure transmitter
General technical conditions
1 Scope
This standard specifies the HART protocol-based pressure/differential pressure transmitter HART communication related terms and definitions, and abbreviations, classification,
Requirements and test methods.
This standard applies to pressure/differential pressure transmitter based on HART protocol.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 3836.1 explosive atmospheres - Part 1. General requirements for equipment
GB 3836.2 explosive atmospheres - Part 2. the flameproof enclosure "d" protection equipment
GB 3836.4 explosive atmospheres - Part 4. the intrinsically safe "i" protection equipment
GB 3836.19 Explosive atmospheres - Part 19. Fieldbus intrinsically safe concept (FISCO)
GB 3836.20 Explosive atmospheres - Part 20. Equipment protection level (EPL) for the Ga-class equipment
GB/T 17212 industrial process measurement and control - Terms and definitions
GB/T 17614.1 industrial process control systems Transmitters - Part 1. Methods of evaluating performance
GB/T 17626.2 Electromagnetic compatibility Testing and measurement techniques - Electrostatic discharge immunity test
GB/T 17626.3 electromagnetic compatibility test and measurement technology RFEMS test
GB/T 17626.4 Electromagnetic compatibility Testing and measurement techniques - Electrical fast transient burst immunity test
GB/T 17626.5 electromagnetic compatibility test and measurement technology surge (impact) immunity test
GB/T 17626.6 Electromagnetic compatibility Testing and measurement techniques Immunity to conducted disturbances induced field
GB/T 17626.8 Electromagnetic compatibility Testing and measurement techniques - Power frequency magnetic field immunity test
Electrical equipment EMC requirements - Part GB/T 18268.1-2010 measurement, control and laboratory use 1. General requirements
GB/T 18271.1 process measurement and control devices - General methods and procedures for evaluating performance - Part 1. General
GB/T 21099.3 process control function blocks (FB) - Part 3. Electronic Device Description Language (EDDL)
GB/T 29910.1 Industrial communication networks - Fieldbus specifications - Type 20. HART specification - Part 1. HART wired
Network physical layer service definition and protocol specification
IEC 61158-5-20.2010 Industrial communication networks - Fieldbus specifications - Part 5-20. Application layer service definition - Type 20
Basis (Industrialcommunication networks-Fieldbusspecifications-Part 5-20. Applicationlayer
servicedefinition-Type20elements)
IEC 61158-6-20.2010 Industrial communication networks - Fieldbus specifications - Part 6-20. Application layer service definition - Type 20
Basis (Industrialcommunicationnetworks-Fieldbusspecifications-Part 6-20. Applicationlayerproto-
colspecification-Type20elements)
IEC 61784-1.2010 Industrial communication networks profiles - Part 1. Fieldbus profile (Industrialcommunication
networks-Profiles-Part 1. Fieldbusprofiles)
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29817-2013_English be delivered?Answer: Upon your order, we will start to translate GB/T 29817-2013_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 29817-2013_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29817-2013_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|