HOME   Cart(7)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189760 (18 Oct 2025)

GB/T 29730-2025 English PDF

US$439.00 · In stock
Delivery: <= 4 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 29730-2025: Distribution manifold of cold/hot water
Status: Valid

GB/T 29730: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 29730-2025English439 Add to Cart 4 days [Need to translate] Distribution manifold of cold/hot water Valid GB/T 29730-2025
GB/T 29730-2013English349 Add to Cart 3 days [Need to translate] Distribution manifold of cold/hot water Valid GB/T 29730-2013

Basic data

Standard ID GB/T 29730-2025 (GB/T29730-2025)
Description (Translated English) Distribution manifold of cold/hot water
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard Q76
Classification of International Standard 91.140.30
Word Count Estimation 22,253
Date of Issue 2025-08-01
Date of Implementation 2026-02-01
Older Standard (superseded by this standard) GB/T 29730-2013
Issuing agency(ies) State Administration for Market Regulation, Standardization Administration of China

GB/T 29730-2025: Distribution manifold of cold/hot water

---This is an excerpt. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.), auto-downloaded/delivered in 9 seconds, can be purchased online: https://www.ChineseStandard.net/PDF.aspx/GBT29730-2025
ICS 91.140.30 CCSQ76 National Standard of the People's Republic of China Replaces GB/T 29730-2013 Manifold for hot and cold water Released on August 1, 2025 Implementation on February 1, 2026 State Administration for Market Regulation The National Standardization Administration issued

Table of Contents

Preface III 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 Classification and labeling 2 5 General Requirements 3 6 Requirements 4 7 Test methods 7 8 Inspection Rules 11 9 Marking, packaging, transportation and storage 12 Appendix A (Informative) Compression Fitting Branch Joint Structure 13 Appendix B (Informative) Acceptance test method for EPDM rubber seal ring 14 Reference 15 Preface This document is in accordance with the provisions of GB/T 1.1-2020 "Guidelines for standardization work Part 1.Structure and drafting rules for standardization documents" Drafting. This document replaces GB/T 29730-2013 "Manifolds for hot and cold water". Compared with GB/T 29730-2013, except for the structural adjustment and In addition to editorial changes, the main technical changes are as follows. a) The terms "manifold", "manifold regulating valve", "manifold on-off valve" and their definitions have been changed (see 3.1, 3.4, 3.5,.2013 3.1, 3.4, and 3.5 of the.2012 edition); b) Added the terms "electrothermal actuator", "electric actuator", "flow coefficient" and their definitions (see 3.6 to 3.8); c) Added classification (see 4.1); d) The marking has been changed (see 4.2, 4.3 of the.2013 edition); e) The general requirements for structure, materials, and surface treatment have been changed (see 5.1 to 5.3, 4.1, 5.1, 5.2, and 5.4 of the.2013 edition); f) Added general requirements for actuators (see 5.4); g) Changed the requirements for appearance, dimensions and connections, air tightness, pressure strength, hydraulic balance performance, flow regulation performance and bending resistance (See 6.1, 6.2, 6.4 to 6.8, and 4.2, 5.3, 6.1 to 6.6 of the.2013 edition); h) Added requirements for corrosion resistance, torsion resistance, pull-out resistance, and opening and closing performance (see 6.3, 6.9 to 6.11); i) The test methods for appearance, air tightness, pressure strength, hydraulic balance performance, flow regulation performance and bending resistance have been changed (see 7.2, 7.5~7.9,.2013 version 7.1~7.6); j) Added test conditions, dimensions and connections, corrosion resistance, torsion resistance, pull-out resistance and opening and closing performance test methods (see 7.1, 7.3, 7.4, 7.10, 7.11, 7.12); k) Added inspection categories (see 8.1); l) The inspection rules for factory inspection and type inspection have been changed (see 8.2, 8.3, and 8.1, 8.2 of the.2013 edition). Please note that some of the contents of this document may involve patents. The issuing organization of this document does not assume the responsibility for identifying patents. This document is proposed by the Ministry of Housing and Urban-Rural Development of the People's Republic of China. This document is under the jurisdiction of the National Technical Committee for Standardization of HVAC and Purification Equipment (SAC/TC143). This document was drafted by. Weijia (Shanghai) Industrial Co., Ltd., China Construction Metal Structure Association, Zhuxin (Hebei Xiong'an) Inspection and Testing Co., Ltd. Co., Ltd., China Academy of Building Research Co., Ltd., Zhejiang Manruide Comfort System Co., Ltd., Zhejiang Jielida HVAC Technology Co., Ltd., Tianjin Weixing New Building Materials Co., Ltd., Zhejiang Dunyun Industrial Co., Ltd., Gongyuan Co., Ltd., Zhejiang Jufan Copper Co., Ltd., Zhejiang Mingshi Xingxin HVAC Technology Co., Ltd., Zhejiang Daberlin Valve Co., Ltd., Rifeng Enterprise Group Co., Ltd., Zhejiang Di'ai Intelligent Control Technology Co., Ltd. Technology Co., Ltd., Ningbo Jiekelong Precision Industry Co., Ltd., Zhejiang Aitz Valve Technology Co., Ltd., Zhejiang Hengjie Copper Industry Co., Ltd., Zhejiang Zeiss Pipe Technology Co., Ltd., Zhejiang Stant Valve Co., Ltd., Taizhou Yongxin Valve Co., Ltd., Zhejiang Xinfan HVAC Intelligent Control Co., Ltd., Shanghai Feisina HVAC Technology Co., Ltd., Yuhuan Zhongliang Fluid Intelligent Control Co., Ltd., Zhejiang Su Ming Valve Co., Ltd. Limited Company. The main drafters of this document are. Kong Xiangzhi, Xue Mei, Gu Xiuzhi, Hou Jie, Lv Weihua, Wang Chao, Chen Haihuan, Zheng Wei, Zhou Weidong, Ji Xiong, Wu Wanrong, Feng Guoping, Lin Hailin, Wang Hui, Zhu Xinyan, Yan Rongjie, Wang Xiaolin, Fan Weiming, Bei Yesen, Chen Jingjing, Luo Yongqing, Jiang Linghui, Ye Chaofeng, Cai Shanliang, Su Zongyao. This document was first published in.2013 and this is the first revision. Manifold for hot and cold water

1 Scope

This document specifies the classification and marking, general requirements, requirements, test methods of manifolds for hot and cold water (hereinafter referred to as "manifolds"). Methods, inspection rules, marking, packaging, transportation and storage. This document applies to manifolds in hot and cold water cooling and heating systems of civil buildings and ancillary buildings of industrial buildings. This document is not applicable to large manifolds in refrigeration rooms or heating exchange stations.

2 Normative references

The contents of the following documents constitute the essential clauses of this document through normative references in this document. For referenced documents without a date, only the version corresponding to that date applies to this document; for referenced documents without a date, the latest version (including all amendments) applies to This document. GB/T 1220 Stainless steel bars GB/T 1804 General tolerances Tolerances for linear and angular dimensions without tolerance indications GB/T 2828.1 Sampling procedures for inspection by attributes Part 1.Sampling plans for batch inspection based on acceptance quality limit (AQL) GB/T 5231 Grades and chemical compositions of processed copper and copper alloys GB/T 6461-2002 Rating of specimens and test pieces of metal and other inorganic coatings on metal substrates after corrosion testing GB/T 7306.1 55° sealing pipe threads Part 1.Cylindrical internal threads and conical external threads GB/T 7306.2 55° sealing pipe threads Part 2.Conical internal threads and conical external threads GB/T 7307 55° non-sealed pipe thread GB/T 9124.1 Steel pipe flanges Part 1.PN series GB/T 9124.2 Steel pipe flanges Part 2.Class series GB/T 9797 Metallic and other inorganic coatings—Nickel, nickel-chromium, copper-nickel and copper-nickel-chromium electroplated coatings GB/T 10125 Artificial atmosphere corrosion test Salt spray test GB/T 12771 Stainless steel welded pipes for fluid transportation GB/T 13912 Technical requirements and test methods for hot-dip galvanized coatings on metallic steel products GB/T 13913 Specification and test methods for electroless nickel-phosphorus alloy coatings on metallic coverings GB/T 13927 Industrial valve pressure test GB/T 14536.1 Automatic electric controllers Part 1.General requirements GB/T 14832 Compatibility test of standard elastomer materials and hydraulic fluids GB/T 15820 Polyethylene pressure pipe and fittings connection resistance test GB/T 30832 Test method for valve flow coefficient and flow resistance coefficient JB/T 8219 Standard and intelligent electric actuators for industrial process control systems QB/T 5788 Electric Heating Actuator YS/T 583 Brass rods for hot-forged plumbing fittings

3 Terms and Definitions

The following terms and definitions apply to this document.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 29730-2025_English be delivered?

Answer: Upon your order, we will start to translate GB/T 29730-2025_English as soon as possible, and keep you informed of the progress. The lead time is typically 2 ~ 4 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 29730-2025_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 29730-2025_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 29730-2025?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 29730-2025 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.