Guide of on-line condition monitoring system for turbine-generator
| Valid |
GB/T 29626-2019
|
PDF similar to GB/T 29626-2019
Basic data | Standard ID | GB/T 29626-2019 (GB/T29626-2019) | | Description (Translated English) | Guide of on-line condition monitoring system for turbine-generator | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | K20 | | Classification of International Standard | 29.160.20 | | Word Count Estimation | 34,344 | | Date of Issue | 2019-10-18 | | Date of Implementation | 2020-05-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 29626-2019: Guide of on-line condition monitoring system for turbine-generator---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guide of on-line condition monitoring system for turbine-generator
ICS 29.160.20
K20
National Standards of People's Republic of China
Replace GB /Z 29626-2013
Turbine generator state online monitoring system
Application guidelines
Published on.2019-10-17
2020-05-01 implementation
State market supervision and administration
China National Standardization Administration issued
Content
Foreword III
1 Scope 1
2 Normative references 1
3 Terms and Definitions 1
4 General requirements 2
5 Online monitoring project 4
6 Test, commissioning and acceptance of online monitoring devices 6
Appendix A (informative appendix) Generator online monitoring parts and features 8
Appendix B (informative) Turbo generator online monitoring system integration 9
Appendix C (informative) Turbo-generator shafting torsional vibration online monitoring system 12
Appendix D (informative) Insulation overheat monitoring device 14
Appendix E (informative) Turbogenerator stator winding end vibration monitoring system 16
Appendix F (informative) Partial discharge online monitoring 18
Appendix G (informative) On-line monitoring of inter-turn short-circuit of turbine generator rotor windings 21
Appendix H (informative) Turbogenerator shaft voltage axis current monitoring 23
Appendix I (informative) Hydrogen leakage monitoring of turbine generator cooling water system 26
Reference 28
Foreword
This standard was drafted in accordance with the rules given in GB/T 1.1-2009.
This standard replaces GB /Z 29626-2013 "Guidelines for the Application of On-line Monitoring System for Turbine Generator Status", and GB /Z 29626-2013
In comparison, the main technical changes are as follows.
--- Revised scope (see Chapter 1, Chapter 1 of the.2013 edition);
--- Removed the introduction (see the introduction of the.2013 edition);
--- Removed the two parts of "Marking, Packaging, Transportation and Storage" and "Supply of Supply" (see Chapters 7 and 8 of the.2013 edition)
chapter);
--- Revised the title of Chapter 6 and made corresponding changes to the content (see Chapter 6, Chapter 6 of the.2013 edition);
--- Revised Appendix A, Appendix C, Appendix D, Appendix E, Appendix F, Appendix G (see Appendix A, Appendix C, Appendix D,
Appendix E, Appendix F, Appendix G, Appendix A, Appendix E, Appendix D, Appendix B, Appendix C, Appendix F) of the.2013 edition;
--- Increased integration of on-line monitoring system for turbo generators (see Appendix B);
--- Increased turbine voltage shaft current monitoring (see Appendix H);
--- Increased hydrogen leakage monitoring of the steam turbine generator cooling water system (see Appendix I).
This standard was proposed by the China Electrical Equipment Industry Association.
This standard is under the jurisdiction of the National Large Generator Standardization Technical Committee (SAC/TC511).
This standard was drafted. State Grid Shandong Electric Power Company Electric Power Research Institute, Shandong Qilu Motor Manufacturing Co., Ltd., State Grid Shanghai
Electric Power Research Institute of Electric Power, Harbin Institute of Electrical Engineering, Institute of Thermal Power Technology, China Datang Group Science and Technology Research Institute,
Huadian Electric Power Research Institute Co., Ltd. Northeast Branch, Harbin Electric Machinery Co., Ltd., China Datang Group Science and Technology Research Institute
Huadong Branch of Guangdong Co., Ltd., Guangdong Yudean Group Co., Ltd., Shandong Mingke Electric Technology Co., Ltd., China Electric Power Research Institute
Company, North China Electric Power Research Institute Co., Ltd., Beijing Beizhong Steam Turbine Motor Co., Ltd., Beijing Sifang Relay Insurance Co., Ltd.
Co., Ltd., Beijing Huake Tongan Monitoring Technology Co., Ltd., Shanghai Electric Power Station Equipment Co., Ltd. Shanghai Generator Factory, Dongfang Electric Set
Tuanfang Dongfang Motor Co., Ltd., Guangzhou Zhizhi Electric Automation Co., Ltd.
The main drafters of this standard. Sun Shumin, Zhang Zhonghai, Li Fuxing, Sun Yutian, Wang Jinsong, Wang Jianjun, Jiao Xiaoxia, Sheng Mingqi, Ye Guohua,
Tang Zonghua, Cao Zhiwei, Cheng Yan, Yan Chunyu, Lei Yu, Wang Yunshan, Liu Quan, Zhu Yuliang, Wang Peng, Liu Mingxing, Wan Jinping, Wang Yong, Li Zhicheng, He Wenwei,
Zhou Wei.
The previous versions of the standards replaced by this standard are.
---GB /Z 29626-2013.
Turbine generator state online monitoring system
Application guidelines
1 Scope
This standard specifies the general requirements for on-line monitoring systems for turbo-generators (hereinafter referred to as monitoring systems), online monitoring projects, and
Requirements for testing, commissioning and acceptance of online monitoring devices.
This standard applies to the design, manufacture and operation management of the on-line monitoring system for steam turbine generators. Gas turbine generator and camera
The status of the online monitoring system can also be referred to.
2 Normative references
The following documents are indispensable for the application of this document. For dated references, only dated versions apply to this article.
Pieces. For undated references, the latest edition (including all amendments) applies to this document.
GB/T 2423.1 Environmental testing of electrical and electronic products - Part 2. Test methods Test A. Low temperature
GB/T 2423.2 Environmental testing of electrical and electronic products - Part 2. Test methods Test B. High temperature
GB/T 2423.3 Environmental testing - Part 2. Test method test Cab. constant damp heat test
GB/T 2423.4 Environmental testing of electric and electronic products - Part 2. Test methods Test Db. alternating heat and damp (12h 12h
ring)
GB/T 2423.5 Environmental testing - Part 2. Test methods Test Ea and guide. Impact
GB/T 2423.6 Environmental testing for electric and electronic products - Part 2. Test methods Test Eb and guide. Collision
GB/T 2423.10 Environmental testing of electric and electronic products - Part 2. Test Fc. Vibration (sinusoidal)
GB/T 3797 electrical control equipment
GB/T 4208 enclosure protection grade (IP code)
GB/T 17626.2 Electromagnetic compatibility test and measurement technology Electrostatic discharge immunity test
GB/T 17626.3 Electromagnetic compatibility test and measurement technology RF electromagnetic field radiation immunity test
GB/T 17626.4 Electromagnetic compatibility test and measurement technology Electrical fast transient burst immunity test
GB/T 17626.5 Electromagnetic compatibility test and measurement technology Surge (impact) immunity test
GB/T 17626.8 Electromagnetic compatibility test and measurement technology power frequency magnetic field immunity test
GB/T 17799.2 Electromagnetic compatibility general standard immunity test in industrial environment
GB 17799.4 Electromagnetic compatibility general standard emission in industrial environment
GB/T 19183 (all parts) Electronic equipment mechanical structure outdoor enclosure
GB/T 24343 Industrial Machinery Electrical Equipment Insulation Resistance Test Specification
3 Terms and definitions
The following terms and definitions apply to this document.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29626-2019_English be delivered?Answer: Upon your order, we will start to translate GB/T 29626-2019_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 29626-2019_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29626-2019_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|