|
US$399.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 29428.2-2014: Operation for earthquake search and rescue team -- Part 2: Procedures and methods Status: Valid
| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 29428.2-2014 | English | 399 |
Add to Cart
|
3 days [Need to translate]
|
Operation for earthquake search and rescue team -- Part 2: Procedures and methods
| Valid |
GB/T 29428.2-2014
|
PDF similar to GB/T 29428.2-2014
Basic data | Standard ID | GB/T 29428.2-2014 (GB/T29428.2-2014) | | Description (Translated English) | Operation for earthquake search and rescue team -- Part 2: Procedures and methods | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | P15 | | Classification of International Standard | 91.120.25 | | Word Count Estimation | 17,192 | | Date of Issue | 12/12/2014 | | Date of Implementation | 7/1/2015 | | Quoted Standard | GB 5082-1985; GB/T 29428.1-2012 | | Regulation (derived from) | National Standards Bulletin 2014 No. 30 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This Standard specifies the earthquake disaster emergency rescue teams in the workplace conduct assessments, search, rescue and first aid procedures and methods. This section applies to the earthquake disaster emergency rescue team of rescue operations, o |
GB/T 29428.2-2014: Operation for earthquake search and rescue team -- Part 2: Procedures and methods ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Operation for earthquake search and rescue team Part 2.. Procedures and methods
ICS 91.120.25
P15
National Standards of People's Republic of China
Earthquake Disaster Emergency Rescue Team rescue operations
Part 2. Procedures and Methods
Part 2. Proceduresandmethods
Issued on. 2014-12-22
2015-07-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Introduction Ⅲ
Introduction Ⅳ
1 Scope 1
2 Normative references 1
3 Terms and definitions
4 workplace assessment 2
4 5 search
Rescue 5 6
First aid 6 7
Appendix A (informative) Density of Building Materials Table 7
Annex B (informative) timber support system reference number 8
Annex C (informative) triage method 10
Annex D (informative) cardiopulmonary resuscitation 11
Appendix E (normative) method for trauma care 12
Foreword
GB/T 29428 "Earthquake Disaster Emergency Rescue Team rescue operations" is divided into two parts.
--- Part 1. General requirements;
--- Part 2. procedures and methods.
This section GB/T 29428 Part 2.
This section drafted in accordance with GB/T 1.1-2009 given rules.
This part is proposed by the China Seismological Bureau.
This part of the National Standardization Technical Committee earthquake (SAC/TC225) centralized.
This section drafted by. China Earthquake Emergency Rescue Center, China Earthquake Administration Institute of crustal stress, China Seismological Bureau of Geophysical Research
The People's Liberation Army 66150 troops, the Armed Police Command headquarters, the Armed Police General Hospital, Beijing Municipal Public Security Fire Bureau, Seismological Bureau of Sichuan, Gansu
Seismological Bureau.
The main drafters of this section. Luger, Jia Qun Lin, Chen Hong, Gu Jianhua, PENG Bi-Bo1, Liu Xiangyang, Wang Liang, Song Min Hao, Wang read the law, Han Wendong,
He Hongwei, Hu, Wu Xinyan Cheng Yong, Li Shangqing, Yang Yang, Zhang Jian-Qiang.
Introduction
Domestic and earthquake disaster emergency rescue practice shows that complex earthquake, rescue difficult, technically demanding; the team involved in the rescue
And more, and team ability, techniques and methods, equipment, and information security management vary, often leads to coordinating rescue operations difficult, low efficiency, safety
High risk. GB/T 29428 designed to regulate and coordinate the earthquake disaster emergency rescue team rescue operations, rescue capabilities and improve efficiency, the maximum
Minimizes casualties.
The basic principles of earthquake disaster emergency rescue operations is people-oriented, science and rescue, safety first, rescue and medical assistance combined.
The main task of earthquake disaster emergency rescue team is due to earthquakes or other emergencies caused by construction (structures) collapse is burying people
Members implement search and rescue.
This section GB/T 29428 in the system are summarized in Wenchuan, Yushu earthquake relief and a series of experiences, study the needs of social development,
With reference to the development of the international standards basis.
Earthquake Disaster Emergency Rescue Team rescue operations
Part 2. Procedures and Methods
1 Scope
This section GB/T 29428 specifies the earthquake disaster emergency rescue teams in the workplace to conduct assessments, search, rescue and first aid
Procedures and methods.
This section applies to the earthquake disaster emergency rescue team of rescue operations, others involved in earthquake disaster relief teams can use the reference.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB 5082-1985 lifting and command signals
GB/T 29428.1-2012 earthquake disaster emergency rescue team to rescue operations - Part 1. General requirements
3 Terms and Definitions
GB/T 29428.1-2012 and as defined in the following terms and definitions apply to this document.
3.1
Rescue channel rescuepath
Select or create to rescue people trapped in the path of safety.
3.2
Support shoring
By increasing member stable construction (structures) damaged parts of the process.
3.3
Rescue breaching
By cutting, drilling, crushing, drilling and other obstacles to be removed or partial decomposition process.
3.4
Top uplifting support
By raising, expansion barriers, and expand the process space.
3.5
Remove remove
By pulling, lifting, such as lifting a moving obstacle course.
3.6
First aid workingsitefirstaid
In the workplace of the injured were stable vital signs and traumatic bleeding, bandaging, fixation and removal process.
3.7
Triage triage
Groups of wounded injury severity for quick identification and classification.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 29428.2-2014_English be delivered?Answer: Upon your order, we will start to translate GB/T 29428.2-2014_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 29428.2-2014_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 29428.2-2014_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|