Technical guideline of centrifugal pump set commissioning for nuclear power plant
| Valid |
GB/T 28551-2012
|
PDF similar to GB/T 28551-2012
Basic data | Standard ID | GB/T 28551-2012 (GB/T28551-2012) | | Description (Translated English) | Technical guideline of centrifugal pump set commissioning for nuclear power plant | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | F24 | | Classification of International Standard | 27.120.99 | | Word Count Estimation | 7,792 | | Quoted Standard | GB/T 25738; JB/T 8097 | | Regulation (derived from) | National Standards Bulletin No. 13 of 2012 | | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | | Summary | This standard specifies the conventional island of nuclear power plants pump group debugging basic technical requirements. This standard applies to conventional island of nuclear power plants pump group start commissioning tests. |
GB/T 28551-2012: Technical guideline of centrifugal pump set commissioning for nuclear power plant ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS27.120.99
F24
National Standards of People's Republic of China
Nuclear power plant centrifugal Debugging Technical Guidelines
Issued on. 2012-11-01 2012-06-29 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Foreword
This standard rule according to GB/T 1.1-2009 given draft.
This standard is proposed and managed by the China Electricity Council.
This standard was drafted. Suzhou Thermal Power Research Institute Co., Ltd., China Guangdong Nuclear Power Engineering Co., Ltd., Zhejiang Electric Power Test & Research Institute, Guangdong Electric
Network Power Research Institute, Sichuan power industry adjustment tests.
The main drafters of this standard. Shao Gang, Liu Yong, Yu Yang, Wang Hong letter, Liu Zhigang, Qiang Wei, Li Guohua, with Jia Wu, Chen Xiaowei, Sun Quanrong,
YANG Yan bamboo.
Nuclear power plant centrifugal Debugging Technical Guidelines
1 Scope
This standard specifies the technical requirements for basic debugging conventional island of nuclear power plants centrifugal group.
This standard applies to start commissioning tests of nuclear power plants conventional centrifugal island group.
2 Normative references
The following documents for the application of this document is essential. For dated references, only the dated edition applies to this article
Member. For undated references, the latest edition (including any amendments) applies to this document.
GB/T 25738 motor commissioning of nuclear power plants Technical Guidelines
JB/T8097 pump vibration measurements and evaluation methods
3 Terms and Definitions
The following terms and definitions apply to this document.
3.1
Pump pumpassembly
Designed to run the pump to achieve the required sum of components, including pumps, prime mover, coupling and guard, hydraulic coupling, shaft seal and the respective
Annex separator and cooler pump lubricant (grease) systems, and their respective pipes and mounted on a common base, the control system, if necessary
Including heating pump system.
3.2
Start time startingtime
Motor current 1.2 times the rated current of the time elapsed from the start.
3.3
Rise time risingtime
From the start rotating mechanical rotor speed increases the speed to stabilize the elapsed time.
4 Test Equipment
Test equipment shall meet the requirement of test parameters, generally include, but are not limited to the following.
a) multimeter;
b) current, voltage and power measurement device;
c) Megger;
d) high-speed data logger;
e) a thermometer or temperature monitoring recorder;
f) pressure gauge;
g) filter pressure monitoring equipment;
h) timer;
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 28551-2012_English be delivered?Answer: Upon your order, we will start to translate GB/T 28551-2012_English as soon as possible, and keep you informed of the progress. The lead time is typically in 24 hours. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 28551-2012_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 28551-2012_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|