HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 28055-2023 English PDF

US$639.00 ยท In stock
Delivery: <= 6 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 28055-2023: Technical specification for hot tapping and plugging on steel pipeline
Status: Valid

GB/T 28055: Evolution and historical versions

Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 28055-2023English639 Add to Cart 6 days [Need to translate] Technical specification for hot tapping and plugging on steel pipeline Valid GB/T 28055-2023
GB/T 28055-2011English1079 Add to Cart 5 days [Need to translate] Technical standard for hot tapping and plugging on steel pipeline Obsolete GB/T 28055-2011

PDF similar to GB/T 28055-2023


Standard similar to GB/T 28055-2023

GB/T 18604   GB/T 23258   GB/T 21447   GB/T 43926   GB/T 18603   

Basic data

Standard ID GB/T 28055-2023 (GB/T28055-2023)
Description (Translated English) Technical specification for hot tapping and plugging on steel pipeline
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard E98
Classification of International Standard 75.200
Word Count Estimation 31,369
Date of Issue 2023-05-23
Date of Implementation 2023-05-23
Older Standard (superseded by this standard) GB/T 28055-2011
Issuing agency(ies) State Administration for Market Regulation, China National Standardization Administration

GB/T 28055-2023: Technical specification for hot tapping and plugging on steel pipeline

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
ICS 75:200 CCSE98 National Standards of People's Republic of China Replacing GB/T 28055-2011 Technical specifications for hot-pressurized plugging of steel pipelines Released on 2023-05-23 2023-05-23 implementation State Administration for Market Regulation Released by the National Standardization Management Committee

table of contents

Preface I 1 Scope 1 2 Normative references 1 3 Terms and Definitions 1 4 General requirements 3 5 Plugging process 3 6 Plugging pressure classification 3 7 Classification and selection principles of plugging heads 4 8 Pipeline welding pressure requirements 4 9 Preparation for plugging operation 4 10 Plugging operation 6 11 Health, Safety, Environment13 12 Completion technical data 14 Appendix A (informative) Mechanical plugging operation process for non-stop pipeline transportation 15 Appendix B (informative) Pipeline capsule plugging process 18 Appendix C (Informative) Pipeline Intelligent Plugging Operation Process 19 Appendix D (Informative) Pipeline Survey Form 21 Appendix E (Informative) Welding Records of Pipe Fittings 22 Appendix F (informative) Record and calculation requirements for hole opening, plugging, lower plugging, and plugging removal 23 Appendix G (Informative) Drilling Operation Checklist 26 Appendix H (Informative) Checklist for Plugging Operation 27

foreword

This document is in accordance with the provisions of GB/T 1:1-2020 "Guidelines for Standardization Work Part 1: Structure and Drafting Rules for Standardization Documents" drafting: This document replaces GB/T 28055-2011 "Technical Specifications for Hot Plugging of Steel Pipelines": Compared with GB/T 28055-2011, except In addition to structural adjustments and editorial changes, the main technical changes are as follows: a) The scope of application adds "hydraulic active sealing, double-stage sealing sealing, intelligent sealing operations" (see Chapter 1); b) The terms and definitions of "hydraulic active sealing", "two-stage sealing sealing" and "intelligent sealing" have been added (see 3:18, 3:19, 3:20); c) Added the specific requirements for the manufacturer of plugging pipe fittings and welding under pressure (see 4:1, 4:4); d) Added welding process form of hot-pressed pipelines (see 9:6:1); e) Added the specified requirements for the opening reinforcement of the half-way tee (half-way four-way) (see Chapter 10); f) Deleted "Figure 5 Schematic Diagram of surfacing welding form of circumferential fillet weld" (see Figure 5 of the:2011 edition); g) Added installation requirements for double-stage sealing plugging heads and hydraulic active plugging heads (see 10:3:2:5, 10:3:2:6); h) The detailed requirements for the pressure test after the bypass pipe is welded are added (see 10:3:5); i) The requirements for gas protection during pipe breaking operations have been added (see 10:8); j) Added the requirements for cold protection and heat preservation measures for equipment during construction in extremely cold weather (see 11:3:3:1): Please note that some contents of this document may refer to patents: The issuing agency of this document assumes no responsibility for identifying patents: This document is proposed and managed by the National Standardization Technical Committee of Boilers and Pressure Vessels (SAC/TC262): This document is drafted by: China Petroleum Pipeline Bureau Engineering Co:, Ltd: Repair Branch, China Petroleum Pipeline Bureau Engineering Co:, Ltd:, China Special Equipment Inspection and Research Institute, CNPC Pipeline Inspection Technology Co:, Ltd:, National Pipeline Network Group Beijing Pipeline Co:, Ltd: The main drafters of this document: Cao Chongzhen, Liu Gefei, Jia Zhifang, Li Wendong, Xu Li, Xiu Changzheng, Hao Xinwei, Wang Xin, Shi Chuncheng, Song Jin, Li Yuzhong, Xu Haibo, Ji Feng, Tao Weili, Zhang Yixin, Na Jing, Xia Guofa, Jiang Xiucai, Chen Juan, Cheng Zhijie, Wang Guochao, Zhao Ming, Huang Kai, Hong Xianfeng, Jia Huiying, Jiang Xiaohong, Yin Peng, Chen Boyuan: This document was first published in:2011, and this is the first revision: Technical specifications for hot-pressurized plugging of steel pipelines

1 Scope

This document specifies the technical requirements for drilling and plugging operations of steel pipelines under pressure: This document is applicable to steel oil and gas transmission pipeline drilling operation under pressure and plug type, folding type, cartridge type, bladder type, hydraulic active, double-stage Smart plugging operations, pipelines of other media, after fully evaluating the risks brought by the temperature or toxicity of the media, can refer to this document for implementation Drilling and plugging operations:

2 Normative references

The contents of the following documents constitute the essential provisions of this document through normative references in the text: Among them, dated references For documents, only the version corresponding to the date is applicable to this document; for undated reference documents, the latest version (including all amendments) is applicable to this document: GB/T 19326 forged branch pipe seat GB 30871 Safety Code for Special Operations in Hazardous Chemical Enterprises GB/T 31032 Welding and acceptance of steel pipes GB 50194 Safety Code for Power Supply and Utilization of Construction Sites GB 50251 Code for Design of Gas Transmission Pipeline Engineering GB 50253 Code for Design of Oil Pipeline Engineering SY/T 6554-2019 Safety regulations for drilling under pressure in the petroleum industry

3 Terms and Definitions

The following terms and definitions apply to this document: 3:1 hot-tapping In the closed state of the pipeline, a round hole is machined on the pipeline by mechanical cutting: 3:2 Tapping machine In the closed state of the pipeline, it is a kind of equipment for machining circular holes on the pipeline by mechanical cutting: 3:3 plugging head A device consisting of a mechanical support part and a sealing part, used to prevent the flow of medium in the pipeline: 3:4 plugging machine In a closed state, the plugging head can be sent into the pipeline from the opening: 3:5 plugging It is an operation to feed the plugging head into the pipeline from the opening and seal the pipeline, thereby preventing the flow of the medium in the pipeline:

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 28055-2023_English be delivered?

Answer: Upon your order, we will start to translate GB/T 28055-2023_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 6 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 28055-2023_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 28055-2023_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.

Question 5: Should I purchase the latest version GB/T 28055-2023?

Answer: Yes. Unless special scenarios such as technical constraints or academic study, you should always prioritize to purchase the latest version GB/T 28055-2023 even if the enforcement date is in future. Complying with the latest version means that, by default, it also complies with all the earlier versions, technically.