HOME   Cart(0)   Quotation   About-Us Policy PDFs Standard-List
www.ChineseStandard.net Database: 189759 (19 Oct 2025)

GB/T 27775-2011 English PDF

US$259.00 ยท In stock
Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email.
GB/T 27775-2011: Guidelines for integrated vector management -- Urban
Status: Valid
Standard IDContents [version]USDSTEP2[PDF] delivered inStandard Title (Description)StatusPDF
GB/T 27775-2011English259 Add to Cart 3 days [Need to translate] Guidelines for integrated vector management -- Urban Valid GB/T 27775-2011

PDF similar to GB/T 27775-2011


Standard similar to GB/T 27775-2011

WS/T 655   GB/T 36388   WS/T 367   GB/T 27772   GB/T 27771   GB/T 27770   

Basic data

Standard ID GB/T 27775-2011 (GB/T27775-2011)
Description (Translated English) Guidelines for integrated vector management -- Urban
Sector / Industry National Standard (Recommended)
Classification of Chinese Standard C05
Classification of International Standard 11.020
Word Count Estimation 11,196
Date of Issue 2011-12-30
Date of Implementation 2012-04-01
Quoted Standard GB/T 23795; GB/T 23796; GB/T 23797; GB/T 23798
Regulation (derived from) Announcement of Newly Approved National Standards No. 23 of 2011
Issuing agency(ies) General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China
Summary This standard specifies the integrated management of urban vectors fundamental principles, organizational structure and task management, administrative procedures and technical methods. This standard applies to towns vector IPM.

GB/T 27775-2011: Guidelines for integrated vector management -- Urban

---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Guidelines for integrated vector management. Urban ICS 11.020 C05 National Standards of People's Republic of China Technical specifications of vector integrated management of cities and towns Issued on. 2011-12-30 2012-04-01 implementation People's Republic of China Ministry of Health Standardization Administration of China released

Foreword

This standard was drafted in accordance with GB/T 1.1-2009 given rules. This standard is proposed and administered by the People's Republic of China Ministry of Health. This standard was drafted. Guangdong Provincial Disease Prevention and Control Center, the Beijing Municipal Center for Disease Control and Prevention, Beijing Patriotic Health Campaign committee Institute of Microbiology and Epidemiology will office, China CDC infectious disease prevention and control, the PLA Military Academy of Medical Sciences The study. The main drafters of this standard. Lin Lifeng, Zeng Peng, Sun Yin Li, Liu Qi-yong, ZHAO Tong Yan, Duan Jinhua, Liuze Jun, Cai Songwu. Technical specifications of vector integrated management of cities and towns

1 Scope

This standard specifies the basic principles of urban vectors integrated management, organization and management structure and tasks, management procedures and techniques. This standard applies to the comprehensive management of urban vectors.

2 Normative references

The following documents for the application of this document is essential. For dated references, only the dated version suitable for use herein Member. For undated references, the latest edition (including any amendments) applies to this document. GB/T 23795 vectors cockroach density monitoring method GB/T 23796 density of vector monitoring method Flies GB/T 23797 density of vector mosquitoes Monitoring GB/T 23798 density of vector surveillance methods of rodents

3 Terms and Definitions

The following terms and definitions apply to this document. 3.1 Vectors vector Vectors By biological or mechanical source of infection from the pathogen transmission to humans or the environment creatures. Including arthropods in Mosquitoes, flies, cockroaches, fleas, ticks, mites, lice, biting midges, gnats, etc., and rodent rodents. 3.2 Integrated management of vector integratedvectormanagement Biological vector according to biological and ecological characteristics, application of proven scientific methods and appropriate ecosystem management practices Technology, with appropriate policies and regulations as well as the necessary human and financial resources, the establishment of mechanisms for coordination and cooperation between the various departments and levels, Mobilize the masses to participate in, the vector control in less damage levels. 3.3 Resistance resistance Vectors by screening or genetic mutations characteristics, ability to obtain after a lethal dose of insecticide-treated original still survive. 3.4 Mosquito facilities mosquito-prooffacilities Prevent mosquitoes into the environment or people living activities, and to prevent mosquitoes breeding and prevent people being bitten, harassment means. 3.5 Rodent facilities rodent-proofstructureorfacilities Prevent outside environment or sewer rodents into the environment or people living activities and the construction of buildings or protection. 3.6 Facilities flies fly-prooffacilities Flies can be a barrier to enter into contact with food or indoor facilities, such as the screen door, window screens, air curtain, curtain, mantles, etc.

Tips & Frequently Asked Questions:

Question 1: How long will the true-PDF of GB/T 27775-2011_English be delivered?

Answer: Upon your order, we will start to translate GB/T 27775-2011_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time.

Question 2: Can I share the purchased PDF of GB/T 27775-2011_English with my colleagues?

Answer: Yes. The purchased PDF of GB/T 27775-2011_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet.

Question 3: Does the price include tax/VAT?

Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countries

Question 4: Do you accept my currency other than USD?

Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.