US$1159.00 · In stock Delivery: <= 7 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 26831.4-2017: Specification for reading system of energy metering in community -- Part 4: Wireless meter readout Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 26831.4-2017 | English | 1159 |
Add to Cart
|
7 days [Need to translate]
|
Specification for reading system of energy metering in community -- Part 4: Wireless meter readout
| Valid |
GB/T 26831.4-2017
|
PDF similar to GB/T 26831.4-2017
Basic data Standard ID | GB/T 26831.4-2017 (GB/T26831.4-2017) | Description (Translated English) | Specification for reading system of energy metering in community -- Part 4: Wireless meter readout | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N22 | Classification of International Standard | 17.220.20 | Word Count Estimation | 58,587 | Date of Issue | 2017-07-12 | Date of Implementation | 2018-02-01 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China |
GB/T 26831.4-2017: Specification for reading system of energy metering in community -- Part 4: Wireless meter readout ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Specification for reading system of energy metering in community - Part 4. Wireless meter readout
ICS 17.220.20
N22
National Standards of People's Republic of China
Community Energy Metering System
Part 4. Wireless reading of instruments
Part 4. Wirelessmeterreadout
2017-07-12 released
2018-02-01 Implementation
General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China
China National Standardization Management Committee released
Directory
Preface III
Introduction IV
1 Scope 1
2 normative reference document 1
3 terms, definitions and abbreviations 2
3.1 Terms and definitions 2
3.2 Abbreviations 2
4 Overview 3
4.1 Introduction 3
4.2 Instrument communication type 3
4.3 Performance Level 7
5 S mode 7
5.1 Overview of S mode 7
5.2 S-mode transmitter 8
5.3 S mode receiver 9
5.4 S mode data encoding 9
6 T mode 10
6.1 Overview of T mode 10
6.2 T-mode transmitter 10
6.3 Receiver 11 with only T2 mode
6.4 Data encoding for T mode 12
7 R2 mode 14
7.1 Overview 14
7.2 Transmitter for R2 mode
7.3 Receiver 15 for R2 mode
7.4 Data encoding for R2 mode 16
8 C mode 16
8.1 Overview of C Mode 16
8.2 C mode transmitter 16
8.3 C mode receiver 18
8.4 C-mode data encoding 18
9 N mode 18
9.1 N Mode Overview 18
9.2 N-mode physical layer parameters 19
9.3 N Mode Receiver Sensitivity 20
9.4 N mode data encoding 21
10 F mode 21
10.1 F Mode. Overview 21
10.2 F mode. Physical link parameters
10.3 F mode. Receiver sensitivity 23
10.4 F mode. data encoding 23
11 data link layer
11.1 Overview 23
11.2 Sequence of multi-byte fields 24
11.3 Frame Format A 24
11.4 frame format B 24
11.5 domain definition 25
11.6 Timing 28
11.7 Forward or repeat messages 30
Connection to higher protocol layer
12.1 Control information field (CI-domain) 30
12.2 Expand the CI layer of the link layer
12.3 Control information field of the transport layer (CI field) 36
Appendix A (normative) Frequency allocation and frequency band use
Appendix B (informative) Timing Figure 38
Appendix C (informative) Example of a predictive reception of a synchronization message
Appendix D (informative) Extended link structure
Appendix E (Informative Appendix) Counting Mode Process 51
Reference 52
Foreword
GB/T 26831 "Community Energy Metering Recycling System Specification" consists of the following six parts.
- Part 1. Data exchange;
- Part 2. physical and link layers;
- Part 3. Dedicated application layer;
- Part 4. Wireless reading of instruments;
- Part 5. Wireless relay;
Part 6. Local bus.
This part is part 4 of GB/T 26831.
This part is drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that some of the contents of this document may involve patents. The issuer of this document does not assume responsibility for the identification of these patents.
This part is made by the China Machinery Industry Federation.
This part of the National Electrotechnical Instrumentation Standardization Technical Committee (SAC/TC104) centralized.
This part of the drafting of the unit. Harbin Institute of Electrical Instrument, Shenzhen Friends of Technology Co., Ltd., Shenzhen Aerospace Terry Jie
Co., Ltd., Ningbo Water Meter Co., Ltd., Chongqing Smart Water Meter Group Co., Ltd., Wei Sheng Group Co., Ltd., Ningbo Samsung Medical
Gas Co., Ltd., Zhejiang Wansheng Intelligent Technology Co., Ltd., Yunnan Power Grid Co., Ltd. Electric Power Research Institute, Shenyang Hang Fat
Thermal Metrology Technology Co., Ltd., Hangzhou West Power Meter Manufacturing Co., Ltd., Jiangsu Lin Yang Energy Co., Ltd., Holley Technology Co., Ltd. Limited
Company, Shenzhen Ke Lu Electronic Technology Co., Ltd., Huizhong Instrument Co., Ltd., Chengdu Bo high Information Technology Co., Ltd., on behalf of
(Jinan) Co., Ltd., Shenzhen Great Wall Development Technology Co., Ltd., Jiangsu Mai Xi Communication Technology Co., Ltd., Wuhan Sheng Fan Electronics
Co., Ltd., Heilongjiang Electric Instrument Instrument Engineering Technology Research Center Co., Ltd., Zhejiang UBS Electronics Co., Ltd., Anhui and Nuozhi
Technology Co., Ltd., Zhejiang Chentai Technology Co., Ltd.
The main drafters of this part are. Shu Jiehong, Li Wanhong, Guan Wenju, Yuan Jing, Yao Ling, Li Yong, Wang Xuexin, Yuan Zhimin, Wu Yongqiang, Cao Min,
A Study on the Effects of Different Kinds of Drugs on the Growth and Development of Rice (Oryza sativa L.) - "Journal of Anhui Agricultural Sciences".2009 年 03 期 "Journal of Nanjing University of Science and Technology (Social Science Edition)
Meng Juan, Chen Wenxin, Qin Guoxin.
Introduction
With the scientific and technological progress, economic development and people's energy management requirements continue to improve, the community (construction and residential area) measurement (water,
Electricity, gas, heat) remote copy and management of technology applications into the rapid development stage, the emergence of a number of use of various types of communication technology, involving each
Measurement of a variety of products and technical solutions. Product manufacturers and users are eager to see these products or systems to be unified
standard.
Thus, since.1999, the International Electrotechnical Commission has issued the IEC 62056 "meter reading, rate and load control data exchange"
Series of standards; domestic reference to its content issued a GB/T 19882 "automatic meter reading system" series of standards. The standard is an open system,
A good solution to the interconnection and interoperability requirements. The standard system is divided into relatively independent parts to develop, which is conducive to the standard
Its own continuous development. This scientific method and the contents of the standard are GB/T 26831 "community energy metering system regulations" system
Will provide a good reference.
At the same time, due to obvious reasons, the community energy metering system and automatic meter reading system has many similar or common content,
The reality of the product also has the needs of interconnection, GB/T 26831 "community energy metering system specifications" to consider and
GB/T 19882 "automatic meter reading system" coordination.
GB/T 26831 It is in the above background to develop, understand this background to understand GB/T 26831 the development of ideas and understanding
Standard content is useful.
GB/T 26831 contains the contents of the application management and the underlying communication in the community energy metering system. In the application management side
Surface, the main content is COSEM (energy measurement supporting norms), the use of instrumentation object identification and interface object method to establish a model, and further
A dedicated application layer for meter and remote meter reading. In the case of the underlying communication, a twisted pair baseband (M-BUS) and a short pitch are included
From the wireless two physical layer, the link layer specification.
Community Energy Metering System
Part 4. Wireless reading of instruments
1 Scope
This part of GB/T 26831 specifies the parameter requirements for the physical and link layers of the remote wireless meter system.
This part applies to the use of free license 433MHz ~ 434MHz wireless civilian band and 470MHz ~ 510MHz measurement frequency
Segment of the "short distance device" (SRD), covering portable devices, mobile devices and fixed equipment.
Since there is a broad definition, this section can be used for different application layers.
2 normative reference documents
The following documents are indispensable for the application of this document. For dated references, only the dated edition applies to this article
Pieces. For undated references, the latest edition (including all modifications) applies to this document.
GB/T 18657.1 Telecontrol equipment and systems - Part 5. Transmission protocol - Part 1. Transmission frame format
GB/T 18657.2 Telecontrol equipment and systems - Part 5. Transmission protocol Part 2. Link transmission rules
GB/T 19882.33 Automatic meter reading system - Part 3-3. Application layer data exchange protocol COSEM application layer
Community energy metering system - Part 1. Data exchange GB/T 26831.1
GB/T 26831.3-2012 Community Energy Metering Recycling System Specification Part 3. Professional Application Layer
GB/T 26831.5-2017 Community Energy Metering Recycling System Specification Part 5. Wireless Relay
ISO /IEC 646 Information technology information exchange with seven-bit encoded character set (Informationtechnology-ISO 7-bitcoded
charactersetforinformationinterchange)
CEPT/ERC/REC70-03E on the use of short-range equipment (SRD) [Relatingtotheuseofshortrange
devices (SRD)]
ETSIEN300220-1..2012 Electromagnetic compatibility and wireless spectrum problem (ERM); Short distance equipment (SRD); for 25MHz ~
1000MHz frequency range, the maximum power of 500mW wireless devices; Part 1. technical features and test methods [Electromag-
neticcompatibilityandRadiospectrum Matters (ERM); ShortRangeDevices (SRD); Radioequip-
menttobeusedinthe25MHzto1000MHzfrequencyrangewithpowerlevelsrangingupto
500mW; Part 1. Technicalcharacteristicsandtestmethods]
ETSIEN300220-2..2012 Electromagnetic compatibility and wireless spectrum problem (ERM); Short-range equipment (SRD); for 25MHz ~
1000MHz frequency range, the maximum power of 500mW wireless devices; Part 2. non-consistent purpose of the auxiliary parameters [Elec-
tromagneticcompatibilityandRadiospectrum Matters (ERM); ShortRangeDevices (SRD); Radio
equipmenttobeusedinthe25MHzto1000MHzfrequencyrangewithpowerlevelsrangingupto
500mW; Part 2. HarmonizedENcoveringessentialrequirementsunderarticle3.2oftheR
rective
ETSIEN301489-1..2011 Electromagnetic compatibility and radio frequency spectrum method (ERM); Electromagnetic compatibility of wireless equipment and services
(EMC) standards; Part 1. Public technical requirements [ElectromagneticcompatibilityandRadiospectrum Matters
(ERM); ElectroMagneticCompatibility (EMC) standardforradioequipmentandservices; Part 1.
Commontechnicalrequirements]
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 26831.4-2017_English be delivered?Answer: Upon your order, we will start to translate GB/T 26831.4-2017_English as soon as possible, and keep you informed of the progress. The lead time is typically 4 ~ 7 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 26831.4-2017_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 26831.4-2017_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|