| Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
| GB/T 26790.4-2020 | English | RFQ |
ASK
|
3 days [Need to translate]
|
Industrial wireless networks WIA specification - Part 4: WIA-FA protocol conformance test specification
| Valid |
GB/T 26790.4-2020
|
PDF similar to GB/T 26790.4-2020
Basic data | Standard ID | GB/T 26790.4-2020 (GB/T26790.4-2020) | | Description (Translated English) | Industrial wireless networks WIA specification - Part 4: WIA-FA protocol conformance test specification | | Sector / Industry | National Standard (Recommended) | | Classification of Chinese Standard | N10 | | Classification of International Standard | 25.040 | | Word Count Estimation | 238,221 | | Date of Issue | 2020-07-21 | | Date of Implementation | 2021-02-01 | | Issuing agency(ies) | State Administration for Market Regulation, China National Standardization Administration |
GB/T 26790.4-2020: Industrial wireless networks WIA specification - Part 4: WIA-FA protocol conformance test specification ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Industrial wireless networks WIA specification--Part 4.WIA-FA protocol conformance test specification
ICS 25.040
N10
National Standards of People's Republic of China
Industrial wireless network WIA specification
Part 4.WIA-FA protocol conformance test specification
2020-07-21 released
2021-02-01 implementation
State Administration for Market Regulation
Issued by the National Standardization Management Committee
Table of contents
Preface Ⅴ
1 Scope 1
2 Normative references 1
3 Terms and definitions 1
4 Abbreviations 2
5 WIA-FA conformance test system structure 3
5.1 Overview of the test environment 3
5.2 Test process 4
5.3 Test name description 5
5.4 Test pseudo code description 5
5.5 Reference data packet symbol description 11
6 Field equipment test set 11
6.1 Join the process test set 11
6.2 Run process test set 57
6.3 Leaving process test set 118
7 Access equipment test set 120
7.1 Join the process test set 120
7.2 Run process test set 130
7.3 Leaving process test set 169
8 Gateway equipment test set 174
8.1 Run process test set 174
8.2 Leaving Process Test Set 225
References 229
Figure 1 Gateway equipment test environment 3
Figure 2 Access device test environment 3
Figure 3 Field equipment test environment 4
Figure 4 Sequence diagram of field devices joining the network (forward test) 11
Figure 5 Sequence diagram of field devices joining the network (reverse test) 15
Figure 6 Two-way time synchronization test sequence diagram 20
Figure 7 Sequence diagram of super frame resource allocation test 22
Figure 8 Link resource allocation test sequence diagram 24
Figure 9.Reading field device UAO test (forward test) sequence diagram 27
Figure 10 Reading UAO test (reverse test) sequence diagram of field device 29
Figure 11 Configuration field device UAO test (forward test) sequence diagram 33
Figure 12 Configuration field device UAO test (reverse test) sequence diagram 35
Figure 13 VCR test (forward test) timing diagram of configuration field device 39
Figure 14 VCR test (reverse test) timing diagram of configuration field device 41
Figure 15 KEK key distribution test (forward test) sequence diagram 43
Figure 16 KEK key distribution test (reverse test) sequence diagram 45
Figure 17 KEDU key distribution test (forward test) sequence diagram 48
Figure 18 KEDU key distribution test (reverse test) sequence diagram 50
Figure 19 KEDB key distribution test (forward test) sequence diagram 53
Figure 20 KEDB key distribution test (reverse test) sequence diagram 55
Figure 21 Timing diagram of data transmission test 58
Figure 22 Test sequence diagram of equipment status report 60
Figure 23 Channel status report test sequence diagram 62
Figure 24 Sequence diagram of remote read attribute test (forward test) 65
Figure 25 Sequence diagram of remote read attribute test (reverse test) 67
Figure 26 Sequence diagram of remote configuration property test (forward test) 70
Figure 27 Sequence diagram of remote configuration property test (reverse test) 72
Figure 28 Sequence diagram of NACK-based retransmission test 74
Figure 29 Sequence diagram of retransmission test based on GACK 76
Figure 30 P/S communication test sequence diagram 79
Figure 31 R/S communication test (non-confirmed service) sequence diagram 81
Figure 32 R/S communication test (verification service) (forward test) sequence diagram 83
Figure 33 R/S communication test (verification service) (reverse test) sequence diagram 85
Figure 34 Sequence diagram of key update test (forward test) 88
Figure 35 Sequence diagram of key update test (reverse test) 91
Figure 36 Sequence diagram of KEK attack alarm test 94
Figure 37 KEDU attack alarm test sequence diagram 99
Figure 38 KEDB attack warning test sequence diagram 102
Figure 39 KEK update timeout alarm test sequence diagram 105
Figure 40 KEDU update timeout alarm test sequence diagram 110
Figure 41 KEDB update timeout alarm test sequence diagram 114
Figure 42 Timing diagram of field devices passively leaving the network 118
Figure 43 Timing diagram of access device joining the network (forward test) 120
Figure 44 Timing diagram of access device joining the network (reverse test) 122
Figure 45 Timing diagram of super frame allocation test 124
Figure 46 Timing diagram of link allocation test 126
Figure 47 KEDU key distribution test sequence diagram 127
Figure 48 KEDB key distribution test sequence diagram 129
Figure 49 Timing diagram of sending beacon test 130
Figure 50 Sequence diagram of field device joining network test 133
Figure 51 Two-way time synchronization test sequence diagram 138
Figure 52 Timing diagram of superframe resource allocation test 141
Figure 53 Sequence diagram of link resource allocation test 144
Figure 54.The gateway device instructs the access device to send a NACK test sequence diagram 148
Figure 55.The gateway device instructs the access device to send GACK test sequence diagram 150
Figure 56 Sequence diagram of data transmission test from field device to gateway device 152
Figure 57 Time sequence diagram of data transmission test from gateway device to field device 154
Figure 58 Timing diagram of equipment status report test 156
Figure 59 Channel status report test sequence diagram 158
Figure 60 Sequence diagram of remote read attribute test 161
Figure 61 Sequence diagram of remote configuration property test 166
Figure 62 Sequence diagram of field devices passively leaving the network 169
Figure 63 Timing diagram of an access device passively leaving the network 172
Figure 64 Timing diagram of access device joining the network (forward test) 175
Figure 65 Timing diagram of access device joining the network (reverse test) 176
Figure 66 Sequence diagram of superframe resource allocation test for access equipment 179
Figure 67 Sequence diagram of link resource allocation test of access device 180
Figure 68 Timing diagram of field devices joining the network (forward test) 182
Figure 69 Timing diagram of field device joining the network (reverse test) 184
Figure 70 Sequence diagram of field device superframe resource allocation test 186
Figure 71 Sequence diagram of field device link resource allocation test 187
Figure 72.The gateway device instructs the access device to send NACK test sequence diagram 189
Figure 73 The gateway device instructs the access device to send GACK test sequence diagram 190
Figure 74 Time sequence diagram of gateway sending data test 192
Figure 75 Sequence diagram of remote read attribute test 194
Figure 76 Sequence diagram of remote configuration property test 197
Figure 77 Sequence diagram of KEK key distribution test of field device.199
Figure 78 Sequence diagram.201 of field device KEDU key distribution test
Figure 79 Sequence diagram of field device KEDB key distribution test 204
Figure 80 Sequence diagram 206 of field device KEK attack alarm test
Figure 81 Sequence diagram of field device KEDU attack alarm test 208
Figure 82 Sequence diagram of field device KEDB attack alarm test 210
Figure 83 Time sequence diagram of field device KEK update timeout alarm test 211
Figure 84 Field device KEDU update timeout alarm test sequence diagram 213
Figure 85 Time sequence diagram of field device KEDB update timeout alarm test 215
Figure 86 P/S communication test sequence diagram 217
Figure 87 R/S communication test (start/stop) timing diagram 219
Figure 88 R/S communication test (report confirmation) sequence diagram 220
Figure 89 C/S communication test (read attribute) timing diagram 222
Figure 90 C/S communication test (write attribute) timing diagram 224
Figure 91 Timing diagram of field devices passively leaving the network 225
Figure 92 Timing diagram of the access device passively leaving the network 227
Foreword
GB/T 26790 "Industrial Wireless Network WIA Specification" has been released and plans to release the following 8 parts.
---Part 1.WIA system structure and communication specification for process automation;
---Part 2.WIA system structure and communication specification for factory automation;
---Part 3.WIA-PA protocol conformance test specification;
---Part 4.WIA-FA protocol conformance test specification;
---Part 5.WIA-PA interoperability test specification;
---Part 6.WIA-FA interoperability test specification;
---Part 7.General conditions for WIA-PA products;
---Part 8.WIA industry specifications.
This part is Part 4 of GB/T 26790.
This section was drafted in accordance with the rules given in GB/T 1.1-2009.
Please note that certain contents of this document may involve patents. The issuing agency of this document is not responsible for identifying these patents.
This part was proposed by China Machinery Industry Federation.
This part is under the jurisdiction of the National Industrial Process Measurement Control and Automation Standardization Technical Committee (SAC/TC124).
Drafting organizations of this section. Shenyang Institute of Automation, Chinese Academy of Sciences, Institute of Comprehensive Technology and Economics of Mechanical Industry Instrumentation, Beijing Branch
Technical University.
The main drafters of this section. Liang Wei, Zhang Sichao, Wan Yadong, Liu Dan, Wang Kai, Hu Nan, Qi Yue, Xie Sufen, Wang Qin.
Industrial wireless network WIA specification
Part 4.WIA-FA protocol conformance test specification
1 Scope
This part of GB/T 26790 gives the WIA-FA conformance test system structure, field device test set, access device test set and
Gateway equipment test set.
This section applies to the protocol conformance test of wireless network equipment based on GB/T 26790.2-2015.
2 Normative references
The following documents are indispensable for the application of this document. For dated reference documents, only the dated version applies to this article
Pieces. For undated references, the latest version (including all amendments) applies to this document.
GB/T 26790.2-2015 Industrial wireless network WIA specification Part 2.WIA system structure and
Communication specification
3 Terms and definitions
The terms and definitions defined in GB/T 26790.2-2015 apply to this document. For ease of use, the following is repeated
Some terms and definitions in GB/T 26790.2-2015.
3.1
Accessdevice
Installed in an industrial site, responsible for forwarding sensor data, alarms and network management related information on the field device to the gateway device, or
Forward the control signal, management information and configuration information of the gateway device to the field device.
[GB/T 26790.2-2015, definition 3.1.2]
3.2
Beacon
Frames broadcast by the access device in the WIA-FA network.
Note. A new field device must first monitor the beacon before joining the WIA-FA network.
[GB/T 26790.2-2015, definition 3.1.7]
3.3
Fielddevice
WIA-FA equipment installed in the industrial field, connected to sensors and actuators, responsible for sending field data and receiving control commands.
[GB/T 26790.2-2015, definition 3.1.12]
3.4
Gatewaydevice
Connect WIA-FA network and other network equipment.
[GB/T 26790.2-2015, definition 3.1.13]
|