US$134.00 · In stock Delivery: <= 3 days. True-PDF full-copy in English will be manually translated and delivered via email. GB/T 26329-2010: Pneumatic instruments driven by associated process gas -- Safe installation and operating procedures -- Guidelines Status: Valid
Standard ID | Contents [version] | USD | STEP2 | [PDF] delivered in | Standard Title (Description) | Status | PDF |
GB/T 26329-2010 | English | 134 |
Add to Cart
|
3 days [Need to translate]
|
Pneumatic instruments driven by associated process gas -- Safe installation and operating procedures -- Guidelines
| Valid |
GB/T 26329-2010
|
PDF similar to GB/T 26329-2010
Basic data Standard ID | GB/T 26329-2010 (GB/T26329-2010) | Description (Translated English) | Pneumatic instruments driven by associated process gas -- Safe installation and operating procedures -- Guidelines | Sector / Industry | National Standard (Recommended) | Classification of Chinese Standard | N10 | Classification of International Standard | 25.040.01 | Word Count Estimation | 7,737 | Date of Issue | 2011-01-14 | Date of Implementation | 2011-06-01 | Quoted Standard | GB 3836.1; GB 3836.14; GB 3836.15; GB 4208 | Adopted Standard | IEC 61081-1991, IDT | Regulation (derived from) | National Standard Approval Announcement 2011 No.107 | Issuing agency(ies) | General Administration of Quality Supervision, Inspection and Quarantine of the People's Republic of China, Standardization Administration of the People's Republic of China | Summary | This standard specifies the process associated gas driven by a pneumatic instrument safe installation, operating procedures and maintenance procedures guide. This standard does not apply to the associated gas is sealed in and can not emitted into the air by the associated gas -driven pneumatic devices. This standard does not apply to electronic devices partially assembled pneumatic instrumentation required. |
GB/T 26329-2010: Pneumatic instruments driven by associated process gas -- Safe installation and operating procedures -- Guidelines ---This is a DRAFT version for illustration, not a final translation. Full copy of true-PDF in English version (including equations, symbols, images, flow-chart, tables, and figures etc.) will be manually/carefully translated upon your order.
Pneumatic instruments driven by associated process gas. Safe installation and operating procedures. Guidelines
ICS 25.040.01
N10
National Standards of People's Republic of China
By the process associated gas powered pneumatic instrumentation
Guide for safe installation and operation procedures
(IEC 61081.1991, IDT)
Issued on. 2011-01-14
2011-06-01 implementation
Administration of Quality Supervision, Inspection and Quarantine of People's Republic of China
Standardization Administration of China released
Table of Contents
Preface Ⅰ
1 Scope 1
2 Normative references 1
3 Terms and definitions
Generally 4 1
Installation 2 5
5.1 General 2
5.2 housing 2
5.3 Exhaust 2
5.4 exhaust pipe 2
Measures 5.5 attempts to prevent the exhaust pipe 2
Lightning protection measures 5.6 exhaust pipe 2
5.7 housing anti-static measures 2
Ground 2 5.8
5.9 enclosure volume 2
5.10 mark 3
Monitoring gas mixture 3 5.11
5.12 precautions 3
5.13 replacement equipment 3
Operating precautions 6 3
6.1 Overview 3
6.2 Non Smoking 3
Generate 6.3 explosive gas 3
6.4 Test 3 gas in advance
6.5 anti-static measures 3
6.6 prevent sparking 3
Protective measures 6.7 electrical device 3
6.8 Continuous Gas Test 3
Foreword
This standard is identical with IEC 61081.1991 "by the process associated gas powered pneumatic safe installation and operation procedures Guide"
(In English).
According to GB/T 1.1-2000 "Standardization Introduction Part 1. Standard structure and drafting rules" of IEC 61081.1991
The following editorial changes were.
a) Remove the IEC 61081.1991 Foreword;
"." C) with a decimal point instead of a comma as the decimal point, "";
d) The IEC 61081.1991 relevant IEC standard reference in its entirety replaced by the corresponding national standards.
The standard proposed by China Machinery Industry Federation.
This standard by the national industrial process measurement and control Standardization Technical Committee (SAC/TC124) centralized.
This standard is drafted by. Southwest University.
Participated in the drafting of this Standard. China Silian Instrument Group of Instrumentation Technology and Economy Institute.
The main drafters of this standard. Zhu Peijun, Huang Wei, Zhao Yixin, Lu Jing.
Participate drafters of this standard. Liu Jin, Feng Xiao L, Zhang Xinguo.
By the process associated gas powered pneumatic instrumentation
Guide for safe installation and operation procedures
1 Scope
This standard specifies the safety of the installation process associated gas powered pneumatic instruments, procedures and maintenance procedures guide.
This standard does not apply to the associated gas is sealed inside and can not be released into the air by the associated gas powered pneumatic devices.
This standard does not apply to electronic device partially assembled pneumatic instrumentation required.
Note. For installation in explosive gas in an electronic device, see GB 3836.15.
2 Normative references
The following documents contain provisions which, through reference in this standard and become the standard terms. For dated references, subsequent
Amendments (not including errata content) or revisions do not apply to this standard, however, encourage the parties to the agreement are based on research
Whether the latest versions of these documents. For undated reference documents, the latest versions apply to this standard.
GB 3836.1 Electrical apparatus for explosive gas atmospheres - Part 1. General requirements (GB 3836.1-2000, eqv
IEC 60079-0.1998)
GB 3836.14 Electrical apparatus for explosive gas atmospheres - Part 14. Classification of hazardous areas (GB 3836.14-2000, idt
IEC 60079-10.1995)
GB 3836.15 Electrical apparatus for explosive gas atmospheres - Part 15. Electrical installations in hazardous locations (except coal mines)
(GB 3836.15-2000, eqv IEC 60079-14.1996)
GB 4208 housing protection (IP Code) (GB 4208-2008, IEC 60529.2001, IDT)
3 Terms and Definitions
The following terms and definitions apply to this standard.
3.1
Associated gas associatedgas
Obtained from the process fluid medium is used to provide a power source for the installed pneumatic flammable gas.
3.2
Pneumatic pneumaticinstrument
Pneumatically operating industrial process measurement and control instrumentation devices. The gas source can be emitted into the air.
4 general
Associated gas is a mixed gas of air if no doping, provide the power source for the pneumatic instruments is generally higher than the upper explosive limit (UEL) of.
Explosive atmosphere formed by.
a) pneumatic housing is opened, so that the air is filled with the gas into the enclosure;
b) air emissions associated gas area.
By the associated gas powered pneumatic instrument enclosure or the maximum surface temperature of the housing should meet the GB 4208 stipulated
Claim.
Tips & Frequently Asked Questions:Question 1: How long will the true-PDF of GB/T 26329-2010_English be delivered?Answer: Upon your order, we will start to translate GB/T 26329-2010_English as soon as possible, and keep you informed of the progress. The lead time is typically 1 ~ 3 working days. The lengthier the document the longer the lead time. Question 2: Can I share the purchased PDF of GB/T 26329-2010_English with my colleagues?Answer: Yes. The purchased PDF of GB/T 26329-2010_English will be deemed to be sold to your employer/organization who actually pays for it, including your colleagues and your employer's intranet. Question 3: Does the price include tax/VAT?Answer: Yes. Our tax invoice, downloaded/delivered in 9 seconds, includes all tax/VAT and complies with 100+ countries' tax regulations (tax exempted in 100+ countries) -- See Avoidance of Double Taxation Agreements (DTAs): List of DTAs signed between Singapore and 100+ countriesQuestion 4: Do you accept my currency other than USD?Answer: Yes. If you need your currency to be printed on the invoice, please write an email to [email protected]. In 2 working-hours, we will create a special link for you to pay in any currencies. Otherwise, follow the normal steps: Add to Cart -- Checkout -- Select your currency to pay.
|